PBN TF/8 WP/03 04/01/2013 (13 pages) PBNTF8 WP03_EUR PBN Work Programme.docx EANPG PROGRAMME COORDINATING GROUP (COG) PERFORMANCE BASED NAVIGATION IMPLEMENTATION TASK FORCE (PBN TF) EIGHTH MEETING (Paris, France, 23 to 24 January 2013) Agenda Item 8: Review the PBN TF ToR and action plans. Organizational maters and future work programme. EUR PBN WORK PROGRAMME (Presented by the Secretariat) SUMMARY This paper provides updates to the EUR PBN work programme proposed in view of the latest developments. . 1. Introduction 1.1 The ICAO EUR PBN task force was established by the EANPG to foster the implementation of the ICAO Assembly Resolutions regarding PBN (36/23 and 37/11). The Terms of Reference of the task force is provided in Attachment A for reference. 1.2 The 12 th Air Navigation Conference of ICAO was held in November 2012 in Montreal, Canada. The outcomes of the Conference will result in the revision of the Global Air Navigation Plan to be endorsed by the ICAO Assembly in October 2013. The revised plan is based on the Aviation Systems Block Upgrades (ASBU) concept (ref http://www.icao.int/Meetings/anconf12/Pages/default.aspx). 1.3 PBN plays one of the central roles in the revised plan and is one of the key enablers of the current and future airspace concepts, enhancing safety, sustainability and reducing impact of aviation on environment. 1.4 The outcomes of the Conference require reinforced efforts to further advance the PBN implementation. The role of the EUR PBN TF is hard to underestimate in ensuring regional coordination, developing necessary guidance material and facilitating the exchange of knowledge and experience in the EUR Region. 1.5 In view of the above, the EUR PBN TF ToR and work programme need adaptation. The revision of the ToR is a subject of a separate working paper.

Upload: others

Post on 27-Jan-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

  • PBN TF/8 – WP/03

    04/01/2013

    (13 pages)

    PBNTF8 WP03_EUR PBN Work Programme.docx

    EANPG PROGRAMME COORDINATING GROUP (COG)

    PERFORMANCE BASED NAVIGATION IMPLEMENTATION

    TASK FORCE (PBN TF)

    EIGHTH MEETING

    (Paris, France, 23 to 24 January 2013)

    Agenda Item 8: Review the PBN TF ToR and action plans. Organizational maters and future

    work programme.

    EUR PBN WORK PROGRAMME

    (Presented by the Secretariat)

    SUMMARY

    This paper provides updates to the EUR PBN work programme proposed in

    view of the latest developments.

    .

    1. Introduction

    1.1 The ICAO EUR PBN task force was established by the EANPG to foster the implementation of the ICAO Assembly Resolutions regarding PBN (36/23 and 37/11). The Terms of

    Reference of the task force is provided in Attachment A for reference.

    1.2 The 12th Air Navigation Conference of ICAO was held in November 2012 in Montreal, Canada. The outcomes of the Conference will result in the revision of the

    Global Air Navigation Plan to be endorsed by the ICAO Assembly in October 2013. The

    revised plan is based on the Aviation Systems Block Upgrades (ASBU) concept (ref

    http://www.icao.int/Meetings/anconf12/Pages/default.aspx).

    1.3 PBN plays one of the central roles in the revised plan and is one of the key enablers of the current and future airspace concepts, enhancing safety, sustainability and reducing impact of

    aviation on environment.

    1.4 The outcomes of the Conference require reinforced efforts to further advance the PBN implementation. The role of the EUR PBN TF is hard to underestimate in ensuring regional

    coordination, developing necessary guidance material and facilitating the exchange of knowledge and

    experience in the EUR Region.

    1.5 In view of the above, the EUR PBN TF ToR and work programme need adaptation. The revision of the ToR is a subject of a separate working paper.

    http://www.icao.int/Meetings/anconf12/Pages/default.aspx

  • -2- PBN TF/8 - WP/03

    PBNTF8 WP03_EUR PBN Work Programme.docx

    2. Discussion

    2.1 The work programme was endorsed by the EANPG (Conclusion 53/20 refers) as part of the endorsed EUR PBN performance frameworks (Attachments B –D refer).

    2.2 The attachments describe the EUR PBN regional action plans and performance frameworks per following regional projects:

    a) Optimized en-route trajectories;

    b) Optimized terminal trajectories; and

    c) Safe and optimized approaches.

    2.3 The performance frameworks describe the performance benefits to be achieved as well as examples of performance targets and metrics. These performance targets and metrics were

    provided for States for implementation at national level on a voluntary basis.

    2.4 The action plans identify actions to be undertaken by States, regional international organisations in order to progress the PBN implementation in the EUR Region.

    2.5 The EANPG have also urged States (Conclusion 53/34 refers) to use the ICAO Fuel Saving Estimate Tool (IFSET) in order to assess the fuel/CO2 emission reductions benefits and report

    to ICAO using the template provided in Attachment E. This reporting would enable ICAO to assess

    and demonstrate the region-wide accumulated benefits of the PBN implementation.

    2.6 In view of the above, some changes were made to Attachments B to D to reflect on the latest developments.

    3. Action by the meeting

    3.1 The PBN TF is invited to:

    a) Comment and agree on the changes to the action plans per Attachment B to D;

    b) Agree that the action plans and performance metrics should be linked to the revised ToR;

    c) Comment and agree with the changes proposed to the EUR PBN status matrix as provided in Attachment F; and

    c) Urge States and service providers to use the IFSET and the reporting template (Attachment E refers) to provide information to ICAO on the assessed benefits of any

    new PBN related implementation.

  • A - 1 PBN TF/8 - WP/03

    PBNTF8 WP03_EUR PBN Work Programme.docx

    ATTACHMENT A

    COG PBN TASK FORCE TERMS OF REFERENCE

    (COG CONCLUSION 41/2 REFERS)

    The COG PBN Task Force shall:

    1) Develop a EUR Regional PBN implementation plan with objectives and timelines in accordance

    with the ICAO PBN goals and milestones. This PBN implementation plan must be based on the following

    strategic objectives and guiding principles:

    Strategic objectives:

    a) Requirements for navigation systems should be linked with operational requirements

    b) Multiple avionics equipage and/or ground-based systems should be avoided;

    c) Avoid the need for multiple airworthiness and operational approvals;

    d) Amend the contents of the EUR ANP and EUR Supplementary procedures in respect of the PBN planning and implementation.

    Guiding principles:

    a) That changes are warranted on safety, capacity, efficiency basis

    b) Continued application of conventional air navigation procedures during the transition period, to guarantee the operations by users that are not RNAV- and/or RNP-equipped;

    c) The needs of all stakeholders should be considered in development of the ICAO EUR PBN Implementation Plan;

    d) That planning should be kept at a strategic level avoiding unnecessary details impacting legitimate business needs of individual stakeholders.

    e) The ICAO EUR PBN implementation plan should address at least the short term (2008-2012) and medium term (2013-2016); and

    f) The ICAO EUR PBN implementation plan shall be completed by EANPG/51.

    2) Carry out specific studies, develop guidance material and facilitate training to assist States with

    RNAV/RNP implementation in the en-route, terminal, and approach flight phases, taking into account the

    performance based navigation (PBN) concept, according to the ICAO Strategic Objectives and Global Plan

    Initiatives (GPI) on this matter (GPI 5, 7, 10, 11, 12, 20, 21);

    3) Identify other issues/action items arising from the work of ICAO or for consideration by ICAO in

    order to facilitate regional and global harmonization of existing applications as well as future implementation

    of Performance Based Navigation operations;

    4) Review the States’ PBN implementation documentation to ensure regional harmonization and for

    possible inclusion in ICAO-developed model documentation;

    5) Address other regional PBN implementation issues as needed; and

    6) The Task Force should report to the EANPG COG, in coordination with the other COG Contributory

    Bodies on APV issues.

  • B - 1 PBN TF/8 - WP/03

    PBNTF8 WP03_EUR PBN Work Programme.docx

    ATTACHMENT B

    PERFORMANCE FRAMEWORK FORM

    Performance Improvement Area

    OPTIMISED TERMINAL TRAJECTORIES (PBN related)

    Performance Benefits

    Safety Safety level maintained or improved

    Environment Reduced emissions through shorter flights and use of optimum trajectories

    Capacity Increased capacity through better utilization airspace resources

    Cost effectiveness

    Fuel cost reduction through availability of more optimized trajectories

    Performance targets

    a) 100% PBN based SID/STARS by 2016 b) Reduce fuel burn/ CO2 emission in comparison to the pre-PBN situation c) 90% international aerodromes airports to offer CDOs by 2016 (TBD) c)d) 90% international aerodromess to offer CCOs by 2016

    Performance Measurement

    Metrics Number of PBN based SIDs/STARs implemented vs total number of SIDs/STARs

    (To be measured on the regional level based on States reporting through the ICAO EUR ANP mechanism)

    Percentage of fuel consumption and CO2 emissions reduction achieved by implementing PBN, CCO and CDO

    (Measured at the national level using ICAO IFSET or similar tools - optional)

    Number of aircraft using PBN based SID/STAR vs total number of aircraft using SID/STARs

    (potentially to be implemented at the national level)

    Percentage of international aerodromes offering CDOs

    (States reporting through the ICAO EUR ANP mechanism)Percentage of fuel consumption and CO2 emissions

    reduction achieved by implementing PBN and CDO

    (TBD, to be measured on the regional and national levels depending on the availability of the ICAO tools)

    Percentage of CDOs implemented vs total number of STARs

    (To be measured on the regional level based on States reporting through the ICAO EUR ANP mechanism)

    Percentage of international aerodromes offering CCOs

    (States reporting through the ICAO EUR ANP mechanism)

    EUR Strategic action plan

    ICAO ATM

    Operational

    Concept Component

    (Doc 9854)

    TASK DESCRIPTION TIME

    RESPONDIBILITY

    STATUS

    a) Develop the EUR PBN Harmonisation Strategy

    2008-

    2009

    EUR PBN TF

    Completed

    Conclusion

    EANPG50/14

    Conclusion

    COG44/8

    b) Develop the EUR regional PBN implementation plan

    2008-

    2009

    EUR PBN TF

    Completed

    Conclusion

    EANPG50/14

    Conclusion

    COG44/8

    Formatted: Font: Not Italic

  • B - 2 PBN TF/8 - WP/03

    PBNTF8 WP03_EUR PBN Work Programme.docx

    c) Review, amend and approve the ICAO EUR SUPPS (Doc 7030) to reflect the equivalence

    of BRNAV vs RNAV5 and PRNAV vs

    RNAV1.

    2008-

    2009

    EUR PBN TF

    EANPG

    ICAO

    Completed

    d) Develop the States national PBN implementation plans that inter alia should

    also envisage the establishment of the

    national PBN collaborative implementation

    teams to progress PBN, identify training

    needs and address safety issues. 2008-

    2012

    States In progress

    17 States

    reported

    completion.

    26 States covered

    through LSSIP

    Eurocontrol

    10 reported work

    in progress

    5 – no

    information

    e) Develop the EUR PBN related performance measurement plan.

    2010-

    2012

    EUR PBN TF

    CompletedIn

    progress

    f) Establish a regional collaborative decision making process with regards to the PBN

    based SIDs/STARs implementation

    2008-

    2009

    EUR PBN TF

    EANPG RDGE

    RNDSG

    EANPG

    Completed

    Airspace

    Organization and

    Management

    (AOM), Demand

    Capacity

    Balancing (DCB),

    Traffic

    Synchronization

    (TS) and Conflict

    Management

    (CM)

    g) Review or develop and publish the appropriate regional/national regulations for

    aircraft and operational approvals (RNAV 1

    related)

    2008-

    2012

    PBN TF (EUR ACs)

    EASA

    States

    In progress

    h) Provide inputs to the EC PBN IR development process to ensure a coordinated

    and harmonised implementation of PBN in

    the EUR

    2011-

    2013

    EUR PBN TF In progress

    i) Provide regional inputs into the global work within the ICAO PBN SG to develop an

    advanced RNP specification to meet future

    (post 2015) EUR requirements.

    2012-

    2014

    EUR PBN TF

    Eurocontrol

    Completed

    Start in 2012

    j) Develop regional guidance material to assist in implementation of advanced –RNP

    2013-

    2015

    EUR PBN TF

    a)k) Review, amend and approve the ICAO EUR SUPPS (Doc 7030) to cater for new PBN

    implementations include the regional

    requirements for the future (post 2015) RNP

    implementations.

    2014-

    152018

    EUR PBN TF

    EASA

    States

    TBD

    b)l) Develop and publish the appropriate regional/national regulations for aircraft and

    operational approval for advanced-RNP

    (future RNP implementations related)

    20132008

    -2016

    EUR PBN TF

    EASA

    States

    In progress

    k)m) Implement PBN based SIDs/STARs

    2008-

    2016 States

    In progress

    Target- 100%

    PBN based

    SID/STARs by

    2016

    n) Implement CDO and CCOs whenever possible

    2013-

    2016

    Target

    90% international

    airports offering

    CDO/CCOs by

    2016

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 5 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 5 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

  • B - 3 PBN TF/8 - WP/03

    PBNTF8 WP03_EUR PBN Work Programme.docx

    o) Monitor the progress of PBN, CDO and CCO implementation

    2013-

    2016

    EUR PBN TF

    States

    Through the PBN

    status reports

    Supporting

    activities

    Regional workshops and seminars – 1 per year raising awareness and share knowledge and experience on

    PBN, CDO and CCOs implementation (2 in 2011, 2 in 2012, 1 planned in 2013)

    Development of the ICAO ATM improvement tool (IFSET is ready)

    Regional Go Teams to assist in implementation – (2 in 2012 –Caucasus area and the Russian Federation; 1

    in 2013 – Central Asia States)

  • C - 1 PBN TF/8 - WP/03

    PBNTF8 WP03_EUR PBN Work Programme.docx

    ATTACHMENT C

    PERFORMANCE FRAMEWORK FORM

    Performance Improvement Area

    SAFER AND OPTIMISED APPROACHES (PBN and CDOs related)

    Performance Benefits

    Safety Improvements in safety at aerodromes by replacing NPAs with RNP approaches APV or LNAVs

    Environment Reduction in CO2 emission and noise

    Cost effectiveness

    Fuel cost reduction through availability of more optimized trajectories

    Performance targets

    d)e) 100% RNP APV/LNAVsapproaches at all approaches at all instrument runway ends by 2016 e)f) Reduce fuel burn/ CO2 emission in comparison to the pre-PBN situation f) 90% airports to offer CDOs by 2016 (TBD)

    Note: Acknowledging the benefits to be generated from CCOs implementation, work is ongoing on defining/revising

    performance framework forms for CCOs

    Performance Measurement

    Metrics examples Percentage of APVs and/or LNAVsRNP approaches implemented vs total number of approaches

    (To be measured on the regional level based on States reporting through the ICAO EUR ANP mechanism)

    Percentage of runways offering CDOs

    (To be measured on the regional level based on States reporting through the ICAO EUR ANP mechanism)

    Number of aircraft using APV/LNAVs and CDOs vs total number of approaches

    (potentially to be implemented at the national level)

    Percentage of fuel consumption and CO2 emissions reduction achieved by implementing RNP approaches

    APV/LNAVs and CDOs

    (TBD, to be mMeasured on the regional and at the national levels depending on the availability of the

    ICAO tools ICAO IFSET or similar tools - optional)

    EUR Strategic action plan ICAO ATM

    Operational Concept

    Component (Doc 9854)

    TASK DESCRIPTION TIME RESPONSIBILITY STATUS

    a) Develop the EUR PBN Harmonisation Strategy

    2008-

    2009

    EUR PBN TF

    Completed

    Conclusion

    EANPG50/14

    Conclusion

    COG44/8

    b) Develop the EUR regional PBN implementation plan

    2008-

    2009

    EUR PBN TF

    Completed

    Conclusion

    EANPG50/14

    Conclusion

    COG44/8

    Formatted: Left, Indent: Left: 0.25"

  • C - 2 PBN TF/8 - WP/03

    PBNTF8 WP03_EUR PBN Work Programme.docx

    c) Develop the States national PBN implementation plans that inter alia should

    also envisage the establishment of the

    national PBN collaborative implementation

    teams to progress PBN, identify training

    needs and address safety issues 2008-

    2012

    States In progress

    17 States

    reported

    completion.

    26 States

    covered

    through LSSIP

    Eurocontrol

    10 reported

    work in

    progress

    5 – no

    information

    d) Develop the EUR PBN related performance measurement plan

    2010-

    2012

    EUR PBN TF

    Completed

    In progress

    e) Establish a regional collaborative decision making and coordinating process with regards

    to the PBN approaches implementation

    2008-

    2009

    EUR PBN TF

    EANPG

    Completed

    Airspace Organization

    and Management

    (AOM), Demand

    Capacity Balancing

    (DCB), Traffic

    Synchronization (TS)

    and Conflict

    Management (CM)

    f) Review or develop and publish appropriate regional/national regulations for aircraft and

    operational approvals

    2008-

    2012

    EUR PBN TF(EUR

    ACs)

    EASA

    States

    Completed

    In progress

    g) Implement RNP approaches APVs/LNAVs and CDOs

    2016

    States In progress

    340 RNP based

    vs 1550 total

    number of

    approaches.

    771 planned by

    2016

    l)h) Monitor implementation progress and measure performance in accordance with the

    EUR regional and States national PBN

    implementation plans

    2008-

    2016

    EUR PBN TF

    In progress

    Through

    CNS4B table

    i) Develop a regional EUR RNP APCH implementation guidance material

    2011-

    2012

    EUR PBN TF completed

    Supporting activities Regional workshops and seminars 1 per year raising awareness and share knowledge and experience on

    PBN, CDO and CCOs implementation (2 in 2011, 2 in 2012, 1 planned in 2013)

    Development of the ICAO ATM improvement tool (IFSET is ready and made available to States)

    Regional Go Teams to assist in implementation – (2 in 2012 –Caucasus area and the Russian Federation; 1

    in 2013 – Central Asia States)

    Formatted: French (France)

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

  • D - 1 PBN TF/8 - WP/03

    PBNTF8 WP03_EUR PBN Work Programme.docx

    ATTACHMENT D

    PERFORMANCE FRAMEWORK FORM

    Performance Improvement Area

    OPTIMISED EN-ROUTE TRAJECTORIES (PBN related)

    Performance Benefits

    Safety Safety level maintained or improved

    Environment Reduced emissions through shorter flights and use of optimum routes/trajectories

    Capacity Increased capacity through better utilization airspace resources

    Cost effectiveness

    Fuel cost reduction through availability of more optimized routes/trajectories; and

    Ability of aircraft to conduct flights more closely to preferred trajectories

    Performance targets a) 100% PBN routes by 2016 b) Reduce fuel burn/ CO2 emission in comparison to the pre-PBN situation

    Performance Measurement

    Metrics Percentage of PBN routes implemented vs total number of routes

    (To be measured on the regional level based on States reporting through the ICAO EUR ANP

    mechanism)

    Percentage of fuel consumption and CO2 emissions reduction achieved by implementing PBN

    (TBD, to be mMeasured on the regional and at the national levels depending on the

    availability of the ICAO tools using IFSET or similar tools - optional)

    EUR Strategic action plan

    ATM

    Operational

    Concept

    Components

    (Doc 9854)

    TASKS TIME

    RESPONSIBILITY

    STATUS

    EUR PBN TF

    Completed

    Conclusion

    EANPG50/1

    4

    Conclusion

    COG44/8

    Airspace

    Organization and

    Management

    (AOM), Demand

    Capacity

    Balancing

    (DCB), Traffic

    Synchronization

    (TS) and Conflict

    Management

    (CM)

    c)a) Develop the EUR PBN Harmonisation Strategy

    2008-2009

    d)b) Develop the EUR regional PBN implementation plan

    2008-2009

    EUR PBN TF

    Completed

    Conclusion

    EANPG50/1

    4

    Conclusion

    COG48/8

    e)c) Review, amend and approve the ICAO EUR SUPPS (Doc

    7030) to reflect the

    equivalence of BRNAV vs

    RNAV5 and PRNAV vs

    RNAV1.

    2008-2009

    EUR PBN TF

    EANPG

    ICAO

    Completed

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

  • D - 2 PBN TF/8 - WP/03

    PBNTF8 WP03_EUR PBN Work Programme.docx

    f)d) Develop the States national PBN implementation plans

    that inter alia should also

    envisage the establishment of

    the national PBN

    collaborative implementation

    teams to progress PBN,

    identify training needs and

    address safety issues.

    2008-2012

    States In progress

    17 States

    reported

    completion.

    26 States

    covered

    through

    LSSIP

    Eurocontrol

    10 reported

    work in

    progress

    5 – no

    information

    g)e) Develop the EUR PBN related performance measurement

    plan.

    2010-2012

    EUR PBN TF

    In

    progressco

    mpleted

    h)f) Establish a regional collaborative decision making

    process with regards to the

    PBN implementation

    2008-2009

    EUR PBN TF

    EANPG RDGE

    RNDSG

    EANPG

    Completed

    i)g) Review or develop and publish the appropriate

    regional/national regulations

    for aircraft and operational

    approvals (RNAV 5 and

    RNAV 1 related)

    2008-2012

    EUR PBN TF(EUR

    ACs)

    EASA

    States

    In progress

    Completed

    j)h) Provide inputs to the EC PBN IR development process to

    ensure a coordinated and

    harmonised implementation of

    PBN in the EUR

    2011-2013

    EUR PBN TF In progress

    k)i) Provide regional inputs into the global work within the

    ICAO PBN SG to meet future

    (post 2015) EUR

    requirements.

    2011-2012

    EUR PBN TF

    Eurocontrol

    EANPG

    Start in

    2012Compl

    eted

    l)j) Review, amend and approve the ICAO EUR SUPPS (Doc

    7030) to cater for advanced

    RNP and other future

    implementations include the

    regional requirements for the

    future (post 2015) RNP

    implementations.

    2012-2014

    EUR PBN TF

    Start in

    20122013-

    2015

    m)k) Develop and publish the appropriate regional/national

    regulations for aircraft and

    operational approval for

    advance RNP and other future

    implementation (future RNP

    implementations related)

    2014-2018

    EUR PBN TF

    EASA

    States

    TBD

    l) Develop a reguinal guidance document to assist with

    advance RNP implementation

    2013-2015

    EUR PBN TF

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: French (France)

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

  • D - 3 PBN TF/8 - WP/03

    PBNTF8 WP03_EUR PBN Work Programme.docx

    n)m) Monitor implementation progress and measure

    performance in accordance

    with the EUR PBN

    implementation plan and State

    implementation plan

    2008-2016

    EUR PBN TF

    States

    In progress

    Through

    PBN status

    reports

    o)n) Implement PBN based routes 2008-2016 States In progress

    Implement PBN routes in the

    eastern part of the EUR

    2013-2016 Kazakhstan,

    Kyrgyzstan, Russian

    Federation,

    Tajikistan,

    Turkmenistan,

    Uzbekistan

    Implement

    PBN routes

    in the

    eastern part

    of the EUR

    Supporting

    activities

    Regional workshops and seminars1 per year raising awareness and share knowledge and

    experience on PBN, CDO and CCOs implementation (2 in 2011, 2 in 2012, 1 planned in

    2013)

    Development of the ICAO ATM improvement tool (IFSET is ready and made available)

    Regional Go Teams to assist in implementation – (2 in 2012 –Caucasus area and the

    Russian Federation; 1 in 2013 – Central Asia States)

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

    Formatted: Numbered + Level: 1 +Numbering Style: a, b, c, … + Start at: 1 +Alignment: Left + Aligned at: 0" + Indent at: 0.25"

  • E - 1 PBN TF/8 - WP/03

    PBNTF8 WP03_EUR PBN Work Programme.docx

    ATTACHMENT E

    REGION STATE ATM IMPROVEMENT SAVING

    FUEL(KG)

    SAVING

    CO2(KG)

    TOOL

    EUR XXX A)PBN BASED ROUTE B)PBN BASED SID/STAR

    C)PBN APPROACH

    IFSET

  • F - 1 PBN TF/8 - WP/03

    PBNTF8 WP03_EUR PBN Work Programme.docx

    ATTACHMENT F

    STATES AVAILABILITY

    OF THE NATIONAL

    PBN PLAN

    YES/NO/PLANNED BY

    PERCENTAGE OF

    PBN ROUTES VS

    CONVENTIONAL

    ACTUAL/PLANNED

    2016

    PERCENTAGE OF

    RNP

    APPROACHES VS

    CONVENTIONAL

    (INTERNATIONAL

    AERODROMES)

    ACTUAL/PLANNED

    2016

    PERCENTAGE OF

    PBN SID/STARS VS

    CONVENTIONAL

    ACTUAL/PLANNED

    2016

    PERCENTAGE OF

    INTERNATIONAL

    AERODROMES

    OFFER CDO

    ACTUAL/PLANNED

    2016

    PERCENTAGE OF

    INTERNATIONAL

    AERODROMES OFFER

    CCO

    ACTUAL/PLANNED 2016