eams tutorial
TRANSCRIPT
-
8/12/2019 EAMS Tutorial
1/74
TUTORIAL
Enterprise Architecture Management System
-
8/12/2019 EAMS Tutorial
2/74
Summary
Just started
Configuration selection window
The application
Main window
Main menu
Toolbars
Taskbar
Preferences windows
Main modules
Using the application
Togaf Archimate demonstration
-
8/12/2019 EAMS Tutorial
3/74
EAMS Tutorial
Just started
-
8/12/2019 EAMS Tutorial
4/74
Configuration selection window
Available configurations
-
8/12/2019 EAMS Tutorial
5/74
Configuration selection window
Load selected configuration
-
8/12/2019 EAMS Tutorial
6/74
Configuration selection window
Adds an empty configuration
-
8/12/2019 EAMS Tutorial
7/74
Configuration selection window
Deletes selected configuration
-
8/12/2019 EAMS Tutorial
8/74
Configuration selection window
Saves available configurations
-
8/12/2019 EAMS Tutorial
9/74
Configuration selection window
Selected
configuration
name
-
8/12/2019 EAMS Tutorial
10/74
Configuration selection window
Selectedconfiguration
description
-
8/12/2019 EAMS Tutorial
11/74
Configuration selection window
Data source
configuration
-
8/12/2019 EAMS Tutorial
12/74
Configuration selection window
Metamodel
configuration
-
8/12/2019 EAMS Tutorial
13/74
Configuration selection window
Navigationconfiguration
-
8/12/2019 EAMS Tutorial
14/74
Configuration selection window
Scheduling
configuration
-
8/12/2019 EAMS Tutorial
15/74
Configuration selection window
Modules
configuration
-
8/12/2019 EAMS Tutorial
16/74
Configuration selection window
Click Load to load the selected configuration to procede to the application
-
8/12/2019 EAMS Tutorial
17/74
EAMS Tutorial
The application
-
8/12/2019 EAMS Tutorial
18/74
Main window
Main menu Where the user can access the main functionalities of the application as
well as the user preferences or help menu.
-
8/12/2019 EAMS Tutorial
19/74
Main window
Navigation
toolbar
Navigate
through the
pages already
visited (back and
foward) or
return to the
home page.
-
8/12/2019 EAMS Tutorial
20/74
Main window
Adds new tab
-
8/12/2019 EAMS Tutorial
21/74
Main window
Blueprint viewer
toolbar
Where the user
can access thecontrols of the
blueprints like
Fit to screen,
Zoom In, Zoom
Out or Show all
connections
-
8/12/2019 EAMS Tutorial
22/74
Main window
Close tab
-
8/12/2019 EAMS Tutorial
23/74
Main window
Task manager
Where the user
can control allthe tasks
currently being
executed by
EAMS
-
8/12/2019 EAMS Tutorial
24/74
Main window
Notifications
Repository
Configuration
Navigation
Where the user
can access:
Notifications
sent to the user.
Repository
source and cache
related functions.
Select the
navigationprofile
from theavailable ones.
-
8/12/2019 EAMS Tutorial
25/74
Main modules
Data Blueprints Reports Analytics Repository Segments
Explore
Information
Integrate
Information
NOTE:Items in red are not available on the EAMS demonstration version
Generate
blueprints
Generate
blueprints from
data source
Data, Blueprints, Reports and Analytics
Metamodel Configuration
Generate reports
Schedule batchgeneration
Generate charts
Generate ChartSubject vs. Time
Design and
execute queries
Artefact Lifecycle
charts
Repository
Source
configuration
Repository
Provider
configuration
Corporative View
RepositoryCoherence
Custom-made
modules
-
8/12/2019 EAMS Tutorial
26/74
EAMS Tutorial
Togaf Archimate demonstration
< Top right corner will hold the
-
8/12/2019 EAMS Tutorial
27/74
Togaf Archimate demonstration
Corporative Architecture
Business Process Architecture
Business Process optimization
Business layer alignment
Information Systems Architecture
Information and Application layer optimization
Project Portfolio
Projects in course
Planned projects
Project dependencies
Migration Planning
< Top right corner will hold the
necessary clicks to access the
screen depicted in each slide >
-
8/12/2019 EAMS Tutorial
28/74
Corporative Architecture
-
8/12/2019 EAMS Tutorial
29/74
Corporative ArchitectureBusiness Layer
-
8/12/2019 EAMS Tutorial
30/74
Corporative ArchitectureInformation Layer
-
8/12/2019 EAMS Tutorial
31/74
Application Layer
-
8/12/2019 EAMS Tutorial
32/74
Corporative ArchitectureProjects
-
8/12/2019 EAMS Tutorial
33/74
Business Process Organic
-
8/12/2019 EAMS Tutorial
34/74
Business Process Organic
Modify the values in the time slider function in order to see the transformations that the
business process architecture has been subjected to: Gray processes are the ones who
will get in production in the future while red ones are already discontinued.
-
8/12/2019 EAMS Tutorial
35/74
Business Process Organic
2x(double click)
-
8/12/2019 EAMS Tutorial
36/74
Business Project Context
(double-click)
2x
-
8/12/2019 EAMS Tutorial
37/74
Business Layer Alignment
2x
-
8/12/2019 EAMS Tutorial
38/74
Product Context
2x
-
8/12/2019 EAMS Tutorial
39/74
Business Service Realization
2x
-
8/12/2019 EAMS Tutorial
40/74
Application Usage
2x
-
8/12/2019 EAMS Tutorial
41/74
Platform Usage
-
8/12/2019 EAMS Tutorial
42/74
Information Organic
-
8/12/2019 EAMS Tutorial
43/74
Information Organic
-
8/12/2019 EAMS Tutorial
44/74
Application Organic
-
8/12/2019 EAMS Tutorial
45/74
Application Organic
-
8/12/2019 EAMS Tutorial
46/74
Application Organic
2x
-
8/12/2019 EAMS Tutorial
47/74
Application Context
2x
-
8/12/2019 EAMS Tutorial
48/74
Business Process Context
2x
-
8/12/2019 EAMS Tutorial
49/74
Information Context
2x
-
8/12/2019 EAMS Tutorial
50/74
Application Context
2x
-
8/12/2019 EAMS Tutorial
51/74
Application Integration
2x
-
8/12/2019 EAMS Tutorial
52/74
Application Structure
-
8/12/2019 EAMS Tutorial
53/74
Application Layer Optimization
Add three series to the chart with the following values:
Serie I
Range: 01-01-2000 to 31-12-2015
Delta: Year
Type: Business Service
Property: Name
Function: Sum (All)
Serie II
Range: 01-01-2000 to 31-12-2015
Delta: Year
Type: Application Component
Property: Name
Function: Sum (All)
Serie III
Range: 01-01-2000 to 31-12-2015 Delta: Year
Type: Application Service
Property: Name
Function: Sum (All)
-
8/12/2019 EAMS Tutorial
54/74
Application Layer Optimization
-
8/12/2019 EAMS Tutorial
55/74
Application Layer Optimization
Clean the graph and add two series to the chart with the following values:
Serie I
Range: 01-01-2000 to 31-12-2015
Delta: Year
Type: Application Component
Property: Name Function: Sum (All)
Serie II
Range: 01-01-2000 to 31-12-2015
Delta: Year
Type: Application Component
Property: Yearly Maintenance Cost Function: Sum
-
8/12/2019 EAMS Tutorial
56/74
Reducing Application Costs
-
8/12/2019 EAMS Tutorial
57/74
Application distribution
Double-click Application
Components by Layer (Bar) to
generate the graphic to the left.
Double-click Application
Components by Layer (Pie) to
generate the graphic to the left.
-
8/12/2019 EAMS Tutorial
58/74
Information Systems ArchitectureApplication layer costs
Double-click Application Layer
Costs (Bubble) to generate the
graphic to the left.
Double-click Application Layer
Costs (Scatter) to generate the
graphic to the right.
-
8/12/2019 EAMS Tutorial
59/74
Project Organic
-
8/12/2019 EAMS Tutorial
60/74
Project Organic
This blueprint depicts the decomposition
between problems within the organization and
the initiatives created to resolve them
Red artifacts are problems / initiatives that are
known but are have being solved / executed
Yellow artifacts are problems / initiatives that are
being solved / executed
Green artifacts are problems / initiatives that
have already been solved / executed
-
8/12/2019 EAMS Tutorial
61/74
Projects over time
Add three series to the chart with the following values:
Serie I
Range: 01-01-2000 to 31-12-2015
Delta: Year Type: Problem Domain
Property: Name
Function: Sum (All)
Serie II
Range: 01-01-2000 to 31-12-2015
Delta: Year Type: Initiative
Property: Name
Function: Sum (All)
Serie III
Range: 01-01-2000 to 31-12-2015 Delta: Year
Type: Project
Property: Name
Function: Sum (All)
-
8/12/2019 EAMS Tutorial
62/74
Projects over time
f
-
8/12/2019 EAMS Tutorial
63/74
Projects lifecycle
Choose the following values to depict the chart of the following slide
Range: 01-01-2004 to 31-12-2013
Delta: Year
Type: Initiative Lifecycle: Time
j lif l
-
8/12/2019 EAMS Tutorial
64/74
Projects lifecycle
P j O i
-
8/12/2019 EAMS Tutorial
65/74
Project Organic
P bl D i S
2x
-
8/12/2019 EAMS Tutorial
66/74
Problem Domain Structure
P bl D i St t
-
8/12/2019 EAMS Tutorial
67/74
Problem Domain Structure
This blueprint depicts the decomposition
between the selected problem and the
initiatives and projects associated with it.
Red artifacts are initiatives/ projects that are
known but are have being executed
Yellow artifacts are initiatives/ problems that are
being executed
Green artifacts are initiatives / projects that have
already been solved / executed
I ti ti C t t
2x
-
8/12/2019 EAMS Tutorial
68/74
Intiative Context
P j t C t t
2x
-
8/12/2019 EAMS Tutorial
69/74
Project Context
A li ti C t t
2x
-
8/12/2019 EAMS Tutorial
70/74
Application Context
Project Portfolio Project Context
2x
-
8/12/2019 EAMS Tutorial
71/74
Project PortfolioProject Context
Project Portfolio Project Impact
2x
-
8/12/2019 EAMS Tutorial
72/74
Project PortfolioProject Impact
Report Generation
-
8/12/2019 EAMS Tutorial
73/74
Report Generation
Double-click on the available reportApplication Description
Choose the arguments to generate the
report:
Application Component: Campaign
Management Application Project: Kratos
After the report is generated, you can click again on the report Application
Description and double-click on the report that appears on the right grid of
the screen. This action will open the powerpoint generated.
-
8/12/2019 EAMS Tutorial
74/74
For additional information please visit us at www.link.pt
or contact us directly: [email protected]
http://www.link.pt/mailto:[email protected]:[email protected]://www.link.pt/