E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the E12-07-108 Collaboration Spokespeople: J. Arrington, E. Christy, S. Gilad, B. Moffit, V. Sulkosky, B. Wojtsekhowski Hall A Collaboration Meeting December 10 th , 2012

Upload: mariah-atkinson

Post on 24-Dec-2015

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

E12-07-108: (GMp)Precision Measurement of theProton Elastic Cross Section

at High Q2

Vincent Sulkosky

Massachusetts Institute of Technologyfor the E12-07-108 Collaboration

Spokespeople: J. Arrington, E. Christy, S. Gilad, B. Moffit, V. Sulkosky, B. Wojtsekhowski

Hall A Collaboration MeetingDecember 10th, 2012

Page 2: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Introduction

Page 3: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Goals for GMp

Accurately measure e-p elastic cross section in

kinematics similar to other JLab form factor

measurements Improve accuracy of the cross section by as much as a

factor of 4 (< 2%) over previous measurements Key input to all form factors and many of other

experiments, where elastic scattering is a background Provide measurement of power scaling for GMp

in the range Q2 = 7-14 GeV2

Approved for 24 PAC days

Page 4: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Kinematics

Page 5: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Kinematics

PAC Approved 24 days

Page 6: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Control of SystematicsPlanned improvements Tracking efficiency

Include front chambers of FPP as third wire chamber

with VDCs Target density

Use precise optics to provide software cuts on vertex Use race-track cell targets with vertical flow to

minimize fluctuations Solid Angle

A benefit of improved optics Precise determination of target location using

swing arm

Page 7: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

HRS Detector Stacks

Use standard detectors including one plane of FPPfor additional tracking

Page 8: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

~ 100 wires need to be restrung

FPP (front chambers)Problems: gas consumption

> 50 l/h HV trips often

due to gas, many dead

wires/some electronics

Done: repair of dead electronics

built parallel gas

distribution tests of each

wire/disconnect dead

Still to do: HV distribution in one

layer; gas distribution

should be as wide as a

straw block; tension test

for each wire

Page 9: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

VDC Improvements

Upgrade electronics to use

1877S, which allows sparsification Replace aging A/D cards and will reuse MAD cards Provide very good stability against

oscillations and rate capability

of 8 MHz (in full chamber)

Page 10: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Gas Cherenkov Improvements

Reflectivity measurements of HRS GCC mirrors will begin this month

After initial measurements, recoating of mirrors

Check and replace PMTs as needed

Cosmic mirror calibration

Page 11: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Target ConfigurationLH2: 15 cm Racetrack:

Vertical flow design Dedicated studies of density Luminosity monitors in

datastream

Solid Al Foils (Dummy):

Endcap subtraction

Carbon Optics Targets:

1-2 cm spacing along zvertex for extended target acceptance

Solid targets/Endcaps measured with x-ray attenuation

Page 12: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

HRS Optics and Angle

Wire target on strong arm, reproducibility of 100 microns sufficient, 20 microns is likely achievable

Page 13: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Expected Precision

Page 14: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Systematic Uncertainties

Page 15: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Systematic Uncertainties

Page 16: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Tasks & ResponsibilitiesTasks Commitments

Scattering chamber design JLAB – A. Gavalya

Strong arm wire target for HRS Hall A – J. Miller

HRS preparations – VDC, FPP Hall A – 1.5 FTE

Analysis software JLAB – A. Camsonne, O. Hansen

LH2 Target JLAB – D. Meekins, J-P Chen

Beam line Hall A – D. Higinbotham, B. Michaels

Refurbish Gas Č counter ( recoat mirrors, replace PMTs)

MIT – V. Sulkosky

Shower summers for trigger andNIM trigger electronics

YerPHI – A. Shahinyan, Hall A – B. Wojtsekhowski

S0 mounting on the GC Hall A – B. Wojtsekhowski, FIU –P. Khetarpal (FIU)

Commissioning Run Plan HU – E. Christy

Page 17: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Tasks Commitments

Simulations for absolute x-sections (tracking, acceptances, optics, background)

Sieve-slit and collimators

Shifts (long run!)

Data analysis

Tasks & Responsibilities (cont.)

Page 18: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Commitments in Manpower FPP work: Albert Shahinyan, Galust Sargsyan and

Karen (YerPHI) HRS detectors:

Milan Dukic (NCCU technician) for three weeks Hamza Atac (Temple) for two weeks NSU student for one month Longwu Ou (MIT student) for one month Kai Pan (UVa student) for two weeks Puneet Khetarpal (FIU postdoc) for two weeks John LeRose (JLab) part time Mohamed Nuh Hashir Rashad (ODU); DVCS graduate student JinJin Pan (HU); graduate student (potential GMp student) Yang Wang (WM); graduate student (potential GMp student)

Page 19: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Potential Physics Prospects

Page 20: E12-07-108: (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the

Summary First experiment to run in the 12-GeV era with DVCS. GMp will provide a baseline for the 21st century level of

accuracy in form factor measurements by precisely measuring the cross section at Q2 up to 14 GeV2.

It is the only measurement of the cross section; key input to all form factors and many of other experiments

The DVCS luminosity × HRS-R solid angle (1/8 of GMp proposal) and restricted angle range of HRS-R allows for some parallel running of GMp during DVCS data taking.

Collaborators are welcome to participate; much work is required before 2014.