One Maryland Broadband Network Talbot Co. Eastern Shore Bi-weekly Status Report 6/01/12 - 6/15/12 Industry Term Definitions: Stick DiagramDrawing of a utility pole that shows the height of pole, every attachment on the pole, the amount of space (inches or feet) between each attachment and where the new utility will attach. Right of WayPermission given to an entity allowing them to place a utility underground, along a street, road or highway. ApplicationDrawings of utility poles given to the utility companies that show where existing and new utilities will be placed on the pole. Each Application consists of approximately 100 poles. ‘Ride Out’ Visual inspection of every pole in an Application with representatives of the Phone, Power and Cable TV companies. Make ReadyThe cost a utility company charges to relocate their cables in order to allow another attachment to be made to an existing pole. ‘Segment’ An area of proposed underground excavation consisting of approximately 3.5 miles in distance. Dark FiberIndustry term for fiber optic cable that is installed but is not being utilized. LightIndustry term for making newly installed fiber active with network traffic. Fiber Engineering: Complete Backbone Underground Fiber Engineering 1.5 miles Complete Lateral Underground Engineering - 3 Sites Complete 100% .25 .75 1 1.5 0 Engineering Miles

Upload: phungtuong

Post on 30-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

One Maryland Broadband Network

Talbot Co. – Eastern Shore

Bi-weekly Status Report

6/01/12 - 6/15/12

Industry Term Definitions: ‘Stick Diagram’ – Drawing of a utility pole that shows the height of pole, every attachment on the pole, the amount of space

(inches or feet) between each attachment and where the new utility will attach.

‘Right of Way’ – Permission given to an entity allowing them to place a utility underground, along a street, road or highway.

‘Application’ – Drawings of utility poles given to the utility companies that show where existing and new utilities will be placed

on the pole. Each Application consists of approximately 100 poles.

‘Ride Out’ – Visual inspection of every pole in an Application with representatives of the Phone, Power and Cable TV

companies.

‘Make Ready’ – The cost a utility company charges to relocate their cables in order to allow another attachment to be made to an

existing pole.

‘Segment’ – An area of proposed underground excavation consisting of approximately 3.5 miles in distance.

‘Dark Fiber’ – Industry term for fiber optic cable that is installed but is not being utilized.

‘Light’ – Industry term for making newly installed fiber active with network traffic.

Fiber Engineering: Complete

Backbone Underground Fiber Engineering – 1.5 miles

Complete

Lateral Underground Engineering - 3 Sites

Complete

100%

.25 .75 1 1.50

Engineering Miles

Underground Construction Backbone:

Complete

100 %

.25 .75 1 1.50

Construction Miles

Site Construction:

Complete

100%

1 3 sites0

Sites Connected

2

Network Engineering Services:

NwMD POP located at State Police Tower

Project Management:

Working on MOU with County

Issues/Risks:

Need County MOU

Work for next Status Period:

MOU

Easton

Cordova

Grasonville

Tilghman Island

Trappe

Cambridge

Algonquin

Chester

Preston

Ridgely

Oxford

St. Michaels

Stevensville

Hurlock

Secretary

Hillsboro

East New Market

Queen Anne

Chester

Cambridge

Stevensville

Easton MVA Office

Talbot County 911 Center

Talbot County Backup 911 Center

Seg 1

Seg 1

Talbot

Caroline

Dorchester

Queen Anne's

State Hwy 33

State Hwy 328

Cordova

Rd

State

Hwy 1

6

State Hwy 331

State H

wy 309

Saint Michaels Rd

State Hwy 662

Easton Denton Rd

Tilghm

an Is

land R

d

Dover Rd

Dover Bridge Rd

State Hwy 565

State Hwy 14

Ridgely Rd

Starr Rd

Bethlehem Rd

State Hwy 578

S Talbot St

Old Tra pp

e Rd

Longwoods Rd

Mount Holly Rd

State Hwy 480

State Hwy 303

State Hwy 392

Easto

n Claib

orne R

d

E New

Mark

et Elw

ood R

d

State Hwy 404 Alt

Old Wye Mills Easton Rd

Royal Oak

Rd

State Hwy 32

9

Bethlehem Harmony Rd

Easto

n Pkw

y

Harmony Rd

Main St

Lewis

town R

d

New Bridge Rd

State Hwy 322

Old C

o rd o

v a R

d

Hillsboro Rd

Old Wye Mi lls Rd

State

Hwy 3

12

State H

wy 8

Mount Holly East N

ew Market Rd

Elwood Rd

Matthewstown Rd

Old Skipton Rd

E New Market Hurlock Rd

Black

Wa ln

ut Po

i n t R

d

N Saint Michaels Rd Centr

evill e

Rd

Tappers Corner Rd

State Hwy 404

Bay St

N Washington S

t

N Main

St

County Hwy 326

E New Market Rhodesdale Rd

S Wa shingt on St

C olle

ge D

rWye Mills Rd

Old Queen Anne Rd

Preston Rd

Waddells Corner Rd

N Talbo t St

Easton Blvd

Old Wye Mill Rd

Easton Claiborne

N Saint Michael Rd

Secretary E New Market Rd

Oxford R

d

State H

wy 48

1

State Hwy 16

Easton Claiborne Rd

Preston Rd

Main St

S tate Hwy 6 62

Ti lgh

man Is

land R

d

Easton Claiborne Rd

State

Hwy 3

31

Main St

QR33

QR50

QR50

QR662

QR565

QR329

QR303

QR309

QR331

QR404

00.060.120.180.24Miles "1 inch = 0.82 miles

One Maryland Broadband Network Overview LegendOMBN Sites

á

á OMBN Proposed Fiber RoutesMDBC Existing Fiber RouteDOIT_Existing_Fiber

FreewaysHighwaysMajor RoadsStreetsRiversRailroads

State ParksMajor WaterCity BoundaryCounty Boundary

DISCLAIMER:SKYLINE NETWORK ENGINEERING MAKES NO REPRESENTATIONS NOR WARRANTIES, EITHER

EXPRESSED OR IMPLIED, REGARDING THE INFORMATION CONTAINED ON THIS MAP OR ITS SUITABILITY FOR ANY PARTICULAR PURPOSE WHATSOEVER.

THE MAP IS SOLD AND/OR PROVIDED "AS IS" AND SKYLINE NETWORK ENGINEERING WILL NOT BE LIABLE FOR ITS USE OR MISUSE BY ANY PARTY.

Coordinate System: Maryland State Plane NAD83

One Maryland Broadband Network - Project StatusTalbot

Stimulus Progress CompletionProgress_Code

FIBER SPLICEDFIBER INSTALLEDCONSTRUCTEDPERMITTEDENGINEEREDPROPOSED

Author: Skyline Network Engineering Date: 06/15/12