e-mail: [email protected] [email protected] block 6, matbuotchilar str., tashkent 100047, republic of...

12
e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz Block 6, Matbuotchilar str., Tashkent Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan 100047, Republic of Uzbekistan Tel Tel: (+998 71) 1506000 (+998 71) 1506000 Fax Fax : (+998 71) 2320903, 1506003 : (+998 71) 2320903, 1506003 e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz INVESTMENT PROJECT #14 PRODUCTION OF PRODUCTION PETROL, DIESEL AND GAZ GENERATORS Preliminary cost of the project – 2,5 mln. USD Preliminary cost of the project – 2,5 mln. USD (equipment, installation and others); (equipment, installation and others); Project initiator – “Potok Azia” LLC; Project initiator – “Potok Azia” LLC; Possible annual production capacity – 100 pcs per year; Possible annual production capacity – 100 pcs per year; Annual domestic demand – 50-150 pcs per year; Annual domestic demand – 50-150 pcs per year; Current manufacturers – Current manufacturers – “ Union Energy Systems Union Energy Systems“ GC, GC,“ TSS TSS“ GC, “Energy Holding“ LLC, CJSC “MPZ”, “VETZ- GC, “Energy Holding“ LLC, CJSC “MPZ”, “VETZ- energy-systems” energy-systems”; Existent annual capacity – 50 pcs per year; Existent annual capacity – 50 pcs per year; Available raw materials – Gasoline, Diesel Fuel, metal; Available raw materials – Gasoline, Diesel Fuel, metal; Required infrastructure - water, electricity, gas, Required infrastructure - water, electricity, gas, canalization, automobile road, heat; canalization, automobile road, heat; Export volume – up to 30 % of total production capacity Export volume – up to 30 % of total production capacity to to С С IS and other countries; IS and other countries; Number of new work places – 16 persons; Number of new work places – 16 persons; Equipment supplying countries – China, Korea and Japan. Equipment supplying countries – China, Korea and Japan. 33

Upload: ernest-lenington

Post on 15-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: E-mail: info@chamber.uz info@chamber.uz  Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan Tel: (+998 71) 1506000

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

Block 6, Matbuotchilar str., TashkentBlock 6, Matbuotchilar str., Tashkent100047, Republic of Uzbekistan100047, Republic of Uzbekistan

TelTel:: (+998 71) 1506000 (+998 71) 1506000FaxFax: (+998 71) 2320903, 1506003: (+998 71) 2320903, 1506003

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

INVESTMENT PROJECT #14PRODUCTION OF PRODUCTION PETROL, DIESEL AND

GAZ GENERATORS

Preliminary cost of the project – 2,5 mln. USD (equipment, Preliminary cost of the project – 2,5 mln. USD (equipment, installation and others);installation and others);

Project initiator – “Potok Azia” LLC;Project initiator – “Potok Azia” LLC; Possible annual production capacity – 100 pcs per year;Possible annual production capacity – 100 pcs per year; Annual domestic demand – 50-150 pcs per year;Annual domestic demand – 50-150 pcs per year; Current manufacturers – Current manufacturers – ““Union Energy SystemsUnion Energy Systems““ GC, GC,““TSSTSS““GC, GC,

“Energy Holding“ LLC, CJSC “MPZ”, “VETZ-energy-systems”“Energy Holding“ LLC, CJSC “MPZ”, “VETZ-energy-systems”;; Existent annual capacity – 50 pcs per year;Existent annual capacity – 50 pcs per year; Available raw materials – Gasoline, Diesel Fuel, metal;Available raw materials – Gasoline, Diesel Fuel, metal; Required infrastructure - water, electricity, gas, canalization, Required infrastructure - water, electricity, gas, canalization,

automobile road, heat;automobile road, heat; Export volume – up to 30 % of total production capacity to Export volume – up to 30 % of total production capacity to ССIS IS

and other countries;and other countries; Number of new work places – 16 persons;Number of new work places – 16 persons; Equipment supplying countries – China, Korea and Japan.Equipment supplying countries – China, Korea and Japan.

33

Page 2: E-mail: info@chamber.uz info@chamber.uz  Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan Tel: (+998 71) 1506000

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

Block 6, Matbuotchilar str., TashkentBlock 6, Matbuotchilar str., Tashkent100047, Republic of Uzbekistan100047, Republic of Uzbekistan

TelTel:: (+998 71) 1506000 (+998 71) 1506000FaxFax: (+998 71) 2320903, 1506003: (+998 71) 2320903, 1506003

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

INVESTMENT PROJECT #15PRODUCTION OF TEXTILE PRODUCTS

Preliminary cost of the project – 35 mln USDPreliminary cost of the project – 35 mln USD (equipment, (equipment, construction, installation and others);construction, installation and others);

Project initiator – “Jizzak suntex” LLCProject initiator – “Jizzak suntex” LLC Possible annual production capacity – 8 500 tons per year;Possible annual production capacity – 8 500 tons per year; Annual domestic demand – 8 000 tons per year;Annual domestic demand – 8 000 tons per year; Current manufacturers –“Plastex”, “Fergana DEU textile”, Current manufacturers –“Plastex”, “Fergana DEU textile”,

“Horezm Alisher Textile”, “Kabul textile” (not functioning);“Horezm Alisher Textile”, “Kabul textile” (not functioning); Existent annual capacity – 8 000 tons per yearExistent annual capacity – 8 000 tons per year Available raw materials – cotton;Available raw materials – cotton; Required infrastructure- water, electricity, gas, canalization, Required infrastructure- water, electricity, gas, canalization,

automobile road, heat;automobile road, heat; Export volume- 70% per year to Export volume- 70% per year to ССIS countries and etc;IS countries and etc; Number of new work places – 600;Number of new work places – 600; Equipment supplying countries – Germany.Equipment supplying countries – Germany.

35

Page 3: E-mail: info@chamber.uz info@chamber.uz  Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan Tel: (+998 71) 1506000

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

Block 6, Matbuotchilar str., TashkentBlock 6, Matbuotchilar str., Tashkent100047, Republic of Uzbekistan100047, Republic of Uzbekistan

TelTel:: (+998 71) 1506000 (+998 71) 1506000FaxFax: (+998 71) 2320903, 1506003: (+998 71) 2320903, 1506003

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

INVESTMENT PROJECT #16PRODUCTION OF BRICKS

Preliminary cost of the project – 1.2 mlrd. sumPreliminary cost of the project – 1.2 mlrd. sum (equipment, (equipment, construction, installation and others);construction, installation and others);

Project initiator – Project initiator – ««Tovoqsoy Qurilish MollariTovoqsoy Qurilish Mollari»» PE; PE; Possible annual production capacity – 10 000 000 pcs per year;Possible annual production capacity – 10 000 000 pcs per year; Current manufacturers – “Zebo Business”, “Gazalkent Qurilish Current manufacturers – “Zebo Business”, “Gazalkent Qurilish

Mollari”, “Bostonliq Gisht zavodi”;Mollari”, “Bostonliq Gisht zavodi”; Existent annual capacity – 7 000 000 pcs per year;Existent annual capacity – 7 000 000 pcs per year; Required infrastructure - water, electricity, gas, canalization, Required infrastructure - water, electricity, gas, canalization,

automobile road, heat;automobile road, heat; Export volume- 50 % of the total value to Kirgizia and Kazakhstan;Export volume- 50 % of the total value to Kirgizia and Kazakhstan; Number of new work places – 12;Number of new work places – 12; Equipment supplying countries – Russia, China.Equipment supplying countries – Russia, China.

36

Page 4: E-mail: info@chamber.uz info@chamber.uz  Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan Tel: (+998 71) 1506000

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

Block 6, Matbuotchilar str., TashkentBlock 6, Matbuotchilar str., Tashkent100047, Republic of Uzbekistan100047, Republic of Uzbekistan

TelTel:: (+998 71) 1506000 (+998 71) 1506000FaxFax: (+998 71) 2320903, 1506003: (+998 71) 2320903, 1506003

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

INVESTMENT PROJECT #17PRODUCTION OF SPINNING

Preliminary cost of the project – 2.5 mln USDPreliminary cost of the project – 2.5 mln USD (equipment, (equipment, construction, installation and others);construction, installation and others);

Project initiator – “Rushantex”LLC;Project initiator – “Rushantex”LLC; Possible annual production capacity – 900 000 meters per year;Possible annual production capacity – 900 000 meters per year; Current manufacturers – JV “Textiles Spectrum Colors”, “Naksh Current manufacturers – JV “Textiles Spectrum Colors”, “Naksh

Oydin”LLC;Oydin”LLC; Required infrastructure- water, electricity, gas, canalization, Required infrastructure- water, electricity, gas, canalization,

automobile road, heat;automobile road, heat; Existent annual capacity – 700 000 meters per yearExistent annual capacity – 700 000 meters per year;; Available raw materials – cottonAvailable raw materials – cotton;; Export volume- 20-30% per year to Export volume- 20-30% per year to ССIS countries and etc;IS countries and etc; Number of new work places – 18; Number of new work places – 18; Equipment supplying countries – Germany, Switzerland. Equipment supplying countries – Germany, Switzerland.

37

Page 5: E-mail: info@chamber.uz info@chamber.uz  Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan Tel: (+998 71) 1506000

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

Block 6, Matbuotchilar str., TashkentBlock 6, Matbuotchilar str., Tashkent100047, Republic of Uzbekistan100047, Republic of Uzbekistan

TelTel:: (+998 71) 1506000 (+998 71) 1506000FaxFax: (+998 71) 2320903, 1506003: (+998 71) 2320903, 1506003

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

INVESTMENT PROJECT #18PRODUCTION OF GLASSWARE

Preliminary cost of the project – 6 mln USDPreliminary cost of the project – 6 mln USD (equipment, (equipment, installation and others);installation and others);

Project initiator – Project initiator – ««Horazm shisha idishlari Horazm shisha idishlari »»;; Possible annual production capacity – 200 mln items per year;Possible annual production capacity – 200 mln items per year; Annual domestic demand 650 mln items per year;Annual domestic demand 650 mln items per year; Current manufacturers – “Kvarz” Ltd, “Asyl Oina”, “Glasstid”;Current manufacturers – “Kvarz” Ltd, “Asyl Oina”, “Glasstid”; Existent annual capacity - 300 mln items per year;Existent annual capacity - 300 mln items per year; Required infrastructure- water, electricity, gas, canalization, Required infrastructure- water, electricity, gas, canalization,

automobile road, heat;automobile road, heat; Available raw materials – salpeterAvailable raw materials – salpeter, , potassium sodapotassium soda,, chalk-stone chalk-stone, ,

sodium sulfatesodium sulfate, , quartz sandquartz sand Export volume - 14 mln items per year to Export volume - 14 mln items per year to ССIS countries and IS countries and

Afghanistan;Afghanistan; Number of new work places – 25-30;Number of new work places – 25-30; Equipment supplying countries – China.Equipment supplying countries – China.

38

Page 6: E-mail: info@chamber.uz info@chamber.uz  Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan Tel: (+998 71) 1506000

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

Block 6, Matbuotchilar str., TashkentBlock 6, Matbuotchilar str., Tashkent100047, Republic of Uzbekistan100047, Republic of Uzbekistan

TelTel:: (+998 71) 1506000 (+998 71) 1506000FaxFax: (+998 71) 2320903, 1506003: (+998 71) 2320903, 1506003

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

INVESTMENT PROJECT #19PRODUCTION OF MOHAIR PRODUCTS

Preliminary cost of the project – 300 mln USDPreliminary cost of the project – 300 mln USD (equipment, (equipment, installation and others);installation and others);

Project initiator – Project initiator – ООО “ООО “Onorzor Umbir AhmadOnorzor Umbir Ahmad””;; Possible annual production capacity – 750 000 square meters of Possible annual production capacity – 750 000 square meters of

mohair towels, 200 000 pcs of mohair blankets and 200 000 pcs of mohair towels, 200 000 pcs of mohair blankets and 200 000 pcs of mohair robes per year;mohair robes per year;

Current manufacturers – “Namangan momiq”, “BF Textile”;Current manufacturers – “Namangan momiq”, “BF Textile”; Existent annual capacity – 650 000 square meters of mohair Existent annual capacity – 650 000 square meters of mohair

towels, 100 000 pcs of mohair blanket and 100 000 pcs of mophair towels, 100 000 pcs of mohair blanket and 100 000 pcs of mophair robes per year;robes per year;

Available raw materials – Yarn;Available raw materials – Yarn; Required infrastructure - water, electricity, gas, canalization, Required infrastructure - water, electricity, gas, canalization,

automobile road, heat;automobile road, heat; Export volume- Export volume- 62% 62% items per year to items per year to ССIS countries;IS countries; Number of new work places – 40;Number of new work places – 40; Equipment supplying countries – China.Equipment supplying countries – China.

39

Page 7: E-mail: info@chamber.uz info@chamber.uz  Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan Tel: (+998 71) 1506000

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

Block 6, Matbuotchilar str., TashkentBlock 6, Matbuotchilar str., Tashkent100047, Republic of Uzbekistan100047, Republic of Uzbekistan

TelTel:: (+998 71) 1506000 (+998 71) 1506000FaxFax: (+998 71) 2320903, 1506003: (+998 71) 2320903, 1506003

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

INVESTMENT PROJECT #20PRODUCTION OF CONSTRUCTION MATERIALS

Preliminary cost of the project – 100 000 – 200 000 USDPreliminary cost of the project – 100 000 – 200 000 USD (equipment, installation and others);(equipment, installation and others);

Project initiator – “Namuna” Ltd;Project initiator – “Namuna” Ltd; Possible annual production capacity – 5872 items per year;Possible annual production capacity – 5872 items per year; Current manufacturers – AS “Kvarz”, “Andpolic” JV;Current manufacturers – AS “Kvarz”, “Andpolic” JV; Available raw materials – cement;Available raw materials – cement; Required infrastructure - water, electricity, gas, canalization, Required infrastructure - water, electricity, gas, canalization,

automobile road, heat;automobile road, heat; Export volume- 2 000 items per year to Export volume- 2 000 items per year to ССIS countries;IS countries; Number of new work places – 25;Number of new work places – 25; Equipment supplying countries – China.Equipment supplying countries – China.

40

Page 8: E-mail: info@chamber.uz info@chamber.uz  Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan Tel: (+998 71) 1506000

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

Block 6, Matbuotchilar str., TashkentBlock 6, Matbuotchilar str., Tashkent100047, Republic of Uzbekistan100047, Republic of Uzbekistan

TelTel:: (+998 71) 1506000 (+998 71) 1506000FaxFax: (+998 71) 2320903, 1506003: (+998 71) 2320903, 1506003

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

INVESTMENT PROJECT #21PRODUCTION CARBON DIOXIDE AND LIME

Preliminary cost of the project – 1,5 mln USDPreliminary cost of the project – 1,5 mln USD (equipment, (equipment, installation and others);installation and others);

Project initiator – “Dioksid Biznes”LLC;Project initiator – “Dioksid Biznes”LLC; Possible annual production capacity – 1 500 tons carbon dioxide Possible annual production capacity – 1 500 tons carbon dioxide

and 540 tons lime per year;and 540 tons lime per year; Current manufacturers – “Chirchik-Maksan”JV, “Bektimir Current manufacturers – “Chirchik-Maksan”JV, “Bektimir

spirt”LLC;spirt”LLC; Existent annual capacity – 750 tons of carbon dioxide per year;Existent annual capacity – 750 tons of carbon dioxide per year; Required infrastructure - water, electricity, gas, canalization, Required infrastructure - water, electricity, gas, canalization,

automobile road;automobile road; Export volume- 25-30% of total volume per year to Export volume- 25-30% of total volume per year to ССIS countries;IS countries; Number of new work places – 40-50;Number of new work places – 40-50; Equipment supplying countries – Uzbekistan.Equipment supplying countries – Uzbekistan.

41

Page 9: E-mail: info@chamber.uz info@chamber.uz  Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan Tel: (+998 71) 1506000

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

Block 6, Matbuotchilar str., TashkentBlock 6, Matbuotchilar str., Tashkent100047, Republic of Uzbekistan100047, Republic of Uzbekistan

TelTel:: (+998 71) 1506000 (+998 71) 1506000FaxFax: (+998 71) 2320903, 1506003: (+998 71) 2320903, 1506003

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

INVESTMENT PROJECT #22PRODUCTION OF FRESH AND CANNED MUSHROOMS

Preliminary cost of the project – 350 thousand USD(equipment, Preliminary cost of the project – 350 thousand USD(equipment, installation and others);installation and others);

Project initiator – “For Creot Development”SD;Project initiator – “For Creot Development”SD; Possible annual production capacity – 300 tons of fresh Possible annual production capacity – 300 tons of fresh

mushrooms and 250 tons of canned mushrooms per year;mushrooms and 250 tons of canned mushrooms per year; Annual domestic demand – Annual domestic demand – (after domestic producers products)(after domestic producers products)

items per year;items per year; Available raw materials – cotton shell, glass containers, twist cap;Available raw materials – cotton shell, glass containers, twist cap; Required infrastructure - water, electricity, gas, canalization, Required infrastructure - water, electricity, gas, canalization,

automobile road, heat;automobile road, heat; Existent annual capacity – 240 tons of fresh mushrooms and 200 Existent annual capacity – 240 tons of fresh mushrooms and 200

tons of canned mushrooms per yeartons of canned mushrooms per year;; Export volume- 50% of canned mushrooms per year to Export volume- 50% of canned mushrooms per year to ССIS IS

countries;countries; Number of new work places – 20;Number of new work places – 20; Equipment supplying countries – Uzbekistan.Equipment supplying countries – Uzbekistan.

42

Page 10: E-mail: info@chamber.uz info@chamber.uz  Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan Tel: (+998 71) 1506000

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

Block 6, Matbuotchilar str., TashkentBlock 6, Matbuotchilar str., Tashkent100047, Republic of Uzbekistan100047, Republic of Uzbekistan

TelTel:: (+998 71) 1506000 (+998 71) 1506000FaxFax: (+998 71) 2320903, 1506003: (+998 71) 2320903, 1506003

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

INVESTMENT PROJECT #23PRODUCTION OF HOUSEHOLD

Preliminary cost of the project – 800 thousand USD(equipment, Preliminary cost of the project – 800 thousand USD(equipment, installation and others);installation and others);

Project initiator – “Adana Production Group”LLC;Project initiator – “Adana Production Group”LLC; Possible annual production capacity – 10 000 tons of laundry detergent Possible annual production capacity – 10 000 tons of laundry detergent

for hand washing, 15 000 tons of laundry detergent for machine washing for hand washing, 15 000 tons of laundry detergent for machine washing and 5 000 tons of universal detergents per year;and 5 000 tons of universal detergents per year;

Annual domestic demand – 20% Annual domestic demand – 20% (after domestic producers products)(after domestic producers products) items per year;items per year;

Available raw materials – sodium sulfate, sodium metasilicate, soda ash Available raw materials – sodium sulfate, sodium metasilicate, soda ash and etc;and etc;

Required infrastructure - water, electricity, gas, canalization, automobile Required infrastructure - water, electricity, gas, canalization, automobile road, heat;road, heat;

Existent annual capacity – 6 000 tons of laundry detergent for hand Existent annual capacity – 6 000 tons of laundry detergent for hand washing , 10 000 tons of laundry detergent for machine washing and 2 000 washing , 10 000 tons of laundry detergent for machine washing and 2 000 tons of universal detergents per year tons of universal detergents per year ;;

Export volume- 30% per year to Export volume- 30% per year to ССIS countries;IS countries; Number of new work places – 100;Number of new work places – 100; Equipment supplying countries – China, Turkey.Equipment supplying countries – China, Turkey.

42

Page 11: E-mail: info@chamber.uz info@chamber.uz  Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan Tel: (+998 71) 1506000

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

Block 6, Matbuotchilar str., TashkentBlock 6, Matbuotchilar str., Tashkent100047, Republic of Uzbekistan100047, Republic of Uzbekistan

TelTel:: (+998 71) 1506000 (+998 71) 1506000FaxFax: (+998 71) 2320903, 1506003: (+998 71) 2320903, 1506003

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

INVESTMENT PROJECT #24PRODUCTION OF PIGMENTS AND DYES FOR THE

TEXTILE INDUSTRY Preliminary cost of the project – 800 thousand USD(equipment, Preliminary cost of the project – 800 thousand USD(equipment,

installation and others);installation and others); Project initiator – “Delvita Trade”LLC;Project initiator – “Delvita Trade”LLC; Possible annual production capacity – 1 000 tons of pigments and Possible annual production capacity – 1 000 tons of pigments and

dyes for the textile industry per year;dyes for the textile industry per year; Annual domestic demand – 500 tons Annual domestic demand – 500 tons (after domestic producers (after domestic producers

products)products) per year; per year; Current manufacturers – “Pigment”, “Bersa group”, “Basf group”Current manufacturers – “Pigment”, “Bersa group”, “Basf group”;; Available raw materials –Available raw materials – technical ammonia, glycerin, sulfuric technical ammonia, glycerin, sulfuric

acid, acetic acid, water ;acid, acetic acid, water ; Required infrastructure - water, electricity, gas, canalization, Required infrastructure - water, electricity, gas, canalization,

automobile road, heat;automobile road, heat; Existent annual capacity – 500 tons of pigments and dyes for the Existent annual capacity – 500 tons of pigments and dyes for the

textile industry per yeartextile industry per year;; Export volume- 50% tons per year to Export volume- 50% tons per year to ССIS countries;IS countries; Number of new work places – 30;Number of new work places – 30; Equipment supplying countries – India, Germany.Equipment supplying countries – India, Germany.

42

Page 12: E-mail: info@chamber.uz info@chamber.uz  Block 6, Matbuotchilar str., Tashkent 100047, Republic of Uzbekistan Tel: (+998 71) 1506000

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

Block 6, Matbuotchilar str., TashkentBlock 6, Matbuotchilar str., Tashkent100047, Republic of Uzbekistan100047, Republic of Uzbekistan

TelTel:: (+998 71) 1506000 (+998 71) 1506000FaxFax: (+998 71) 2320903, 1506003: (+998 71) 2320903, 1506003

e-mail: e-mail: [email protected] [email protected] http://www.chamber.uz http://www.chamber.uz

INVESTMENT PROJECT #25PRODUCTION, STORAGE OF FRUITS AND VEGETABLES

Preliminary cost of the project – 498 thousand Euro(equipment, Preliminary cost of the project – 498 thousand Euro(equipment, installation and others);installation and others);

Project initiator – “Nagohon Auto Texservis”PE;Project initiator – “Nagohon Auto Texservis”PE; Possible annual production capacity – 1 000 tons of apples, 500 tons Possible annual production capacity – 1 000 tons of apples, 500 tons

of grapes, 500 tons of pears, 500 tons grenades, 150 tons of plums of grapes, 500 tons of pears, 500 tons grenades, 150 tons of plums per year;per year;

Annual domestic demand – 500 tons of apples, 250 tons of grapes, Annual domestic demand – 500 tons of apples, 250 tons of grapes, 100 tons of pears, 100 tons grenades, 50 tons of plums 100 tons of pears, 100 tons grenades, 50 tons of plums (after (after domestic producers products)domestic producers products) per year; per year;

Available raw materials – apples, grapes, pears, grenade and plums;Available raw materials – apples, grapes, pears, grenade and plums; Required infrastructure - water, electricity, gas, canalization, Required infrastructure - water, electricity, gas, canalization,

automobile road, heat;automobile road, heat; Existent annual capacity – 500 tons of apples, 250 tons of grapes, 100 Existent annual capacity – 500 tons of apples, 250 tons of grapes, 100

tons of pears, 100 tons grenades, 50 tons of plums tons of pears, 100 tons grenades, 50 tons of plums ;; Export volume- 70% tons per year to Export volume- 70% tons per year to ССIS countries;IS countries; Number of new work places – 30;Number of new work places – 30; Equipment supplying countries – Holland, Belgium.Equipment supplying countries – Holland, Belgium.

42