e eers - sut.org
TRANSCRIPT
ain en erson Senior Electrical Engineer
ecom
le auntt Founder and MD Water to Water
Ewan Brown naly i anager
Oceaneering
ngeli a rohmann rle Team Leader Large Projects Offshore
ennet
Elisabeth Gjølmesli Senior Principal Engineer DNVGL
le ealElectrical Engineer Uniper
Moya Cahill PresidentPanGeo Subsea
rian O ee e Senior Consultant Engineer
oo
e e ers
Dr. Chas Spradbery Manager-Special Projects Petrofac
ul it Singh BD Manager O taSense
Daniele Petrone General Manager Subsea Schlumberger
Participants Companies Including
Media Partners
Conference e essions
ANNUAL GLOBAL FORUM ON SUBSEA POWER CABLES FOR
THE O&G, ENERGY AND RENEWABLE INDUSTRY
L O N D O N ,U N I T E D K I N G D O M
19th - 20th of November 2018
-Reduce O&M costs with SMART Sensing Optics distributed Acoustic-Sensing Technology.-Get Familiar with Ultra Light-weight design cables for optimum performance-Application of 66kv cables for O&G / Energy Markets-Explore Advancements, Trends and Challenges in Subsea Projects (Oil&Gas/Renewables) -Implement Risk-based approach and complete strategies for offshore support Vehicle and Wind projects-Exchange ideas and opinions to advance scientific and technical knowledge for offshore resources and environmental aspects.
John Davies Director - Seabed Intervention Canyon Offshore
Keed de Ruiter Regional Project ManagerVan Oord Offshore Wind Projects
Andrew PageHead Of Energy Intertek Energy & Water
David Brookes DirectorSt Jules(Rtd. BP)
ANNUAL GLOBAL FORUM ON SUBSEA POWER CABLES FOR
THE O&G, ENERGY AND RENEWABLE INDUSTRY
L O N D O N ,U N I T E D K I N G D O M
19th - 20th of November 2018
un h i e
Case tudy
Chair an s pening e ar s
egistration and orning Coffee
Chair an s pening e ar
u sea ro e ts ast and uture Challengesd an ed Ca le esign e hnology and uture ppli ations for nergy
ndustry
n o nnalysis anager
e nee n
pening ddress Case tudy
C Corrosion re ention on u sea o er U ili als
ntegrating po er in su sea u ili als pro es to e an attra ti e solution in
any s enarios here po er for su sea pu ping and pro essing is re uired
he addition of a les ithin the u ili al undle rings ultiple design
hallenges i e higher te perature ele tri al interferen e ethe ris of C orrosion on pipelines is ell no n and do u ented ut
had ne er een o ser ed in su sea u ili als tu es re ent failure in a su sea u ili al has een asso iated ith the C orrosion pheno ena
eaneering has een tas ed y a usto er to assess and itigate this ris in a re ent ro e t his or sho s the pro ess follo ed and the solution e e uted
Case tudy
orning Coffee and et or ing
Case tudy
Case tudy
fternoon ea and et or ing
anel is ussion
u of 1o n e f o the h n n of ne
u ne et o n nne 1 00 - 22 00
Case tudy
Fax: +44 203 0311 467 OPEX GROUP tel. + 44 203 6083 505
n en e on
enior le tri al ngineer rans ission and istri ution nergy
Aecom
he ono i n iron ental and o ial pa t of
rote ting u arine istri ution Ca les
ra e or to anage the o peting e ono i en iron ental and so ial de ands pla ed on otland s natural arine en iron ent C tool to assess the holisti i pa ts of a le prote tion in onetary ter s
ele tion of the est alue prote tion ethod for indi idual a les Case tudy on ottish and outhern le tri ity et or s
e untt Founder and managing Director Water to Water
edu ing ris during the installation of array a les in offshore ind far sessons learnt fro years of a le installationedu ing eather do nti e hile in reasing effi ien y and safety
Overview
Case tudy
Typical challenges in design of a global configurationCritical issues to consider in design of cables and accessoriesAcceptance criteriaQualification of cable system
Design and qualification of Dynamic Power cables
Andrew PageHead Of Energy Intertek Energy & Water
Interteks Experience with Projects (Onshore/Offshore) Example and Best Practices
New trends and innovations towards setting up large windfarm project
Understanding the site survey and complex instalation challenges Survey and Sediment Analysis techniques.Hazard risk assessment – natural and manmade hazards The importance of spatial planning for windfarm layout and cable design. Cable installation techniques – ploughing, jetting and ROV trenching. Conclusion and Future Outlook
Keed de Ruiter Regional Project Manager Van Oord Offshore Wind Projects
Elisabeth Gjølmesli Senior Principal Engineer DNVGL
Seabed Power Systems - Experience sharing between the Oil/Gas and the Renewables Energy sectors
The roles of the operator and contractors in systems design and specificationsComplexity v SimplicityInstallation Techniques and the drive for lower costsGoing deeper – the floating wind challengesIMR for the future
David Brookes Director St Jules (Rtd. BP)
ANNUAL GLOBAL FORUM ON SUBSEA POWER CABLES FOR L O N D O N , U N I T E D K I N D O M
egistration and orning Coffee
Case tudy
Case tudy
pening ddress
Chair an s pening e ar s
atest esear h and e elop ent in us ea o er yste s
orning Coffee and et or ing
ra ti al Case tudies u sea o er Ca les ro nstallation to aintenan e and epair
u t n husiness e elop ent anager
t en e
John DaviesDirector Seabed Intervention,
Canyon Offshore
edu ing ost ith nline ntegrated ensing using i re pti s istri uted ousti ensing e hnology
Trenching Subsea Power Cables - Bringing years of R&D expertise
d an ed ngineering for Ca le rote tion
Case tudy
enne perien e ith ational and ransnational
rid Conne tions
Who is Canyon OffshoreWhat have we done in cables in and outside O&GWhat are the seabed conditions that are encounteredWhat equipment is there to burial cablesWho sets and how do you achieve the DOB requiredWhat happens if you don’t
his session is an open dis ussion here delegates ill e di ided into groups ea h group ill in lude representati es fro o eCo panies Cs ser i e pro iders and the su it s spea ers and
ill get to e hange their thoughts dis uss and as uestions in regards as on lusion of the onferen e and e t teps
Case tudy
Case tudy
fternoon ea and et or ing
pen roup is ussion
Closing e ar s fro the Chair and nd of ay o
19th - 20th of November 2018
un h e
offee n et o n
Fax: +44 203 0311 467 OPEX GROUP tel. + 44 203 6083 505
he uropean ar et e ti ese hni al e iure entsulti ultural pro e t and per it anage ent
ddressing offshore hallenges hort ir uit dete tion and lo alisation n hor drags uried and un uried Ca le onitoring a e height onitoring using e hnology
enefiting operators and the opportunity for ost sa ings y edu ing the ost plus insuran e further pro ing the lifeti e of operation
Case tudy
u of 2
Mitigate risk in offshore installations using Acoustic Technology
n eeffe enior Consultant ngineer oo
Power Cable Challenges & Solutions
Exposing Power Cable to Dynamic Environments Whats are the Design Challenges involved?Proposed Solutions Best Practices.
h e anager pe ial pro e ts
et of
perations anage ent of u sea Ca les Using i er
pti e hnologies
he opti al a elength has any features that an pro ide i portant operating status infor ation
esigning the easure ent to apture the pheno enaata supports ontinuous and instant dyna i e ent dete tion and asset
status hangea age identifi ation a ility assists ith effi ient fault lo ation and repair
pro eduresn e e et one
eneral anager u sea ne u e
er itting ra e ore hni al Conse uen es olutions
onitoring and aintenan e e uire ents
n e oh nn- eea anager arge ro e ts/Licensing ffshore enne
THE O&G, ENERGY AND RENEWABLE INDUSTRY
How to improve poroject efficiency -Importance of identifying geohazards in the seabed De-risking offshore foundation installationUsing HD stratigraphic imaging and mapping as a toolfor Cable setup-layout
Moya CahillPresidentPan Geo Subsea
REGISTRATION DETAILSPLEASE COMPLETE THE FORM USING BLOCK CAPITAL
LETTERS AND FAX BACK TO +44 203 031 1467
pleasecompleteaseparateregistrationFormforeachdelegate.youcanmakephotocopiesofthisformifnecessary.
DELEGATE DETAILS
Fullname:..............................................................................
jobtitle:.................................................................................
company:...............................................................................
directtel.:...............................................................................
Mobile:....................................................................................
Fax:.........................................................................................
email:......................................................................................
signature&date:...................................................................
COMPANY DETAILS
Address: .......................................................................................................
City: .........................................................Post Code: ..................................
Country: .......................................................................................................
VAT Reg. Number: .......................................................................................
CONFIRMATIONonceaconferencespacehasbeenallocatedtoyou,wewillwritetoconfirmthedateandreceiptofyourpayment.
date& signature:............................................
ACCommodATIoNhotel accommodatIon and travel expenses are not Included In the regIstratIon fee.
OPEX GROUP
Fax: +44 203 0311 467 OPEX GROUP tel. + 44 203 6083 505
Full PACK 1995 £
2 Days of conference On Demand ( unlimited access to conference HD full recorded video ) Documentation (access to all the conference presentations )
STANDARD PACK 1795 £
2 Days of conference Online Documentation (access to all the conference presentations only PDF )
Online
Documentation 599 £ Access to all the conference presentations with recorded questions and answers during the panel discussion )
Conference Fee
ANNUAL GLOBAL FORUM ON SUBSEA POWER CABLES FOR L O N D O N , U N I T E D K I N G D O M
19th - 20th of Nov 2018THE O&G, ENERGY AND RENEWABLE INDUSTRY
TERMS & CONDITIONS
PAYMENT:
Fees are inclusive of program materials and refreshments. Payment prior to conference is mandatory for attendance.
Your registration will not be confirmed until payment is received and may be subject to cancellation.Following completion and return of the registration form, full pay-ment is required within
5 days from receipt of invoice.PLEASE NOTE: payment must be received prior to the conference date. A receipt will be issued on payment.Due to limited conference space, we advise early registration to avoid disappointment. We reserve the right to refuse admission if payment is not received on time.
CANCELLATION, POSTPONEMENT AND SUBSTITUTION POLICY:
You may substitute delegates at any time by providing reasonable advance notice to OPEX Group
For any cancellations received in writing not less than eight (8) days prior to the conference, you will receive a 90% credit to be used at another OPEX Group conference which must occur within one year from the date of issuance of such credit. An administration fee of 10%of the contract fee will be retained by OPEX Group for all permitted cancellations. No credit will be issued for any cancellations occurring within seven (7) days (inclusive) of the conference.
In the event that OPEX Group cancels an event for any reason, you will receive a credit for 100% of the contract fee paid. You may use thiscredit for another OPEX Group event to be mutually agreed with OPEX Group , which must occur within one year from the date of cancellation.
In the event that OPEX Group postpones an event for any reason and the delegate is unable or unwilling to attend on the rescheduled date, you will receive a credit for 100% of the contract fee paid. You may use this credit for another OPEX Group event to be mutually agreed with OPEX Group , which must occur within one year from the date of postponement.
Except as specified above, no credits will be issued for cancellations. There are no refunds given under any circumstances.
OPEX Group is not responsible for any loss or damage as a result of a substitution, alteration or cancellation/postponement of an event. OPEX Group shall assume no liability whatsoever in the event this conference is cancelled, rescheduled or postponed due to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders performance of this conference impracticable, illegal or impossible. For purposes of this clause, a fortuitous event shall include, but not be limited to: war, fire, labour strike, extreme weather or other