    PROJECT: xxxxx ltd.

    Doc.No.

    Dt:

    1 of 4

    Ultratech Cement, Revision 0

    MTPA Cement Plant Date

    Penta Project ApprovedCoal Handling System by

    (Specification for Dust Suppression system atCoal unloading hopper)

    Description Units RequiredVendor'sProposal

    Bidder's information

    Company name Text

    Contact person Text

    Telephone number Text

    Fax number Text

    Email Text

    Proposal number Text

    Revision Text

    General Plant Conditions

    Temperature

    Maximum C

    Minimum C

    Altitude m aboveMSL

    Rainfall (Annual) mm

    Relative humidity %

    Seismic Zone Zone-II (as per IS :1893 part1 2002)

    Wind (at ground level) m/s As per IS:875 (part III) -1987

    Bidder's scope of Supply

    Water tank yes/noPump yes/no

    Electric motor yes/no

    Pipes incl. fittings yes/no

    Operating Conditions

    Wagon Capacity Tons ~60

    Type of Wagon Text BOX-NEW

    Wagon overall Dimension in L x W x H 3.273 x 3.25 x 10.6

  • 7/27/2019 Dust Suppression Sys _Coal Wagon Unloading

    2/4

    PROJECT: xxxxx ltd.

    Doc.No.

    Dt:

    2 of 4

    meters

    Size of Tippler hopper L x W x H 14 x 6 X 4.3

    Discharge time for Tippler Seconds 44

    Railway gauge MM 1676 (Broad Gauge)

    Angle of tip/rotation DEG 150Tipping Capacity

    Operating tips/Hr ~24

    Material Flow rate TPH 1500

    Material Properties

    Material Text Coal

    Size mm

    Bulk Density

    Volume T/m3 0.75

    Power T/m3 0.85

    Moisture % 10-12

    Angle of repose deg 38

    Abrasiveness Text Moderate

    Dust suppression system consistof

    Water Tank

    Type SINTEX /RCC

    Vendor to specify

    Capacity / Volume m3 Vendor to specify

    Ball valve Size mm Vendor to specify

    Solenoid valve size mm Vendor to specify

    Float valve size mm Vendor to specify

    Pumps

    Incl. mounting skid, inlet and outletfittings, NRV

    Discharge @ 9 kg pressure LPM Vendor to specify

    Delivery LPM Vendor to specify

    Head m Vendor to specify

    Electric motor kW / rpm(Incl. control panel + on / off start /provision for earth leakage + dry runprotection + overload relay.

    Vendor to specify

    Pressure gauge Vendor to specify

    for online sit pressure calibration >10 bar

    Vendor to specify

    Safety relief valve Vendor to specify

    With 1 end connection @ 15 barpressure

    Vendor to specify

    Y strainer end connection mm Vendor to specify

    MOC-MS with SS 250 meshcleanable filter insert

    Vendor to specify

  • 7/27/2019 Dust Suppression Sys _Coal Wagon Unloading

    3/4

    PROJECT: xxxxx ltd.

    Doc.No.

    Dt:

    3 of 4

    Sprinkler

    Incl. pipe , fitting , valve & supports Vendor to specify

    Guards

    Provided by Vendor yes/no yesCode used for design (e.g., OSHA,MSHA)

    Text

    Removal method (e.g., bolted) Text

    Locations Text

    Other

    Pipes included yes/no yes

    Fittings included yes/no yes

    Supports included yes/no yes

    Recommended spare parts yes/no yes

    Special tools yes/no yes

    Vendor to test operation of installedequipment

    yes/no yes

    INSTRUMENTATION ANDCONTROLS

    General Information

    Power supply

    Voltage / Frequency / Phases volts/Hz/Ph

    415 VAC 10% 50 Hz 2% / 3

    Load KVA

    Control Voltage

    Voltage / Frequency / Phases volts/Hz/Ph

    240; 50 Hz; 1 phase VAC forMCC and 24 VDC for PLCcontrol

    All control voltages internallyderived with suitable isolated 100%redundant control transformers

    yes/no yes

    Signal typesDiscrete

    Type Type Dry contact

    Rating 240 VAC / 5 Amps.

    Analog mA 4-20

    CONTROL SYSTEM - PLC

    Provided by Vendor yes/no Yes

    Software

    Provided by Vendor yes/no Yes

    Weights

  • 7/27/2019 Dust Suppression Sys _Coal Wagon Unloading

    4/4

    PROJECT: xxxxx ltd.

    Doc.No.

    Dt:

    4 of 4

    Water tank ton

    Pump (including electric motor) ton

    Miscellaneous ton

    Total weight of System Ton