Page 1: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,

DuPont Design for Reliability Tactical Approach to Front End Loading

Alfred E. Ogden, MSRE, CMRP

DuPont Reliability Engineer

MARS Conference 2012 – Galveston, TX

Page 2: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,

AgendaDifferentiating between Quality and Reliability

Value Proposition

• “Live” Case Study

DF “X”: Front End Loading Tactical Approach

Page 3: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,

Distinction Between Reliability and Quality

Quality assures that the production line will work after assembly and as designed.

Reliability provides the probability that the production line will perform its intended function for a designated period of time without failure under specified conditions.

• Reliability looks at how long the equipment will work as designed, which is a very different objective than that of traditional quality control.

• Different tools and models apply to reliability that do not necessarily apply to quality and vice versa.

Page 4: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,

Reliability vs. Initial Cost

What is your Experience of what the shape of this curve would look like?

50

60

70

80

90

100

Low Cost Med Low Med High High Cost

Reliability vs Initial Cost

Reliability

Page 5: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,

Reliability vs. Initial Cost

Here is an example – What elements will effect its shape and slope

50

60

70

80

90

100

Low Cost Med Low Med High High Cost

Reliability vs Initial Cost

Reliability

Page 6: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,

Maintainability vs. Initial Cost

What is your Experience or “Gut Feel” of what the shape of this curve

50

60

70

80

90

100

Low Cost Med Low MedHigh

HighCost

Maintainability vs Initial Cost

Maintainability

Page 7: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,

Maintainability vs. Initial Cost

Here is an example – What would effect the shape and slope of this curve?

50

60

70

80

90

100

Low CostMed Low MedHigh

HighCost

Maintainability vs Initial Cost

Maintainability

Page 8: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,

Life Cycle Cost vs. Initial Cost

What is your Experience or “Gut Feel” of what the shape of this curve

50

60

70

80

90

100

LowCost

MedLow

MedHigh

HighCost

Life Cycle Cost vs Initial Cost

Life Cycle Cost

Page 9: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,

Life Cycle Cost vs. Initial Cost

Here is an example – What elements would effect the shape and slope of this curve?

50

60

70

80

90

100

LowCost

MedLow

MedHigh

HighCost

Life Cycle Cost vs Initial Cost

Life Cycle Cost

Page 10: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,

Front End Loading

FEL 1

• Determine the desired Maintenance Culture and Preliminary Maintenance Strategies

• Add a Maintenance Team Leader to the Project Team and Assign a Reliability Engineer too

• Include specific and realistic Reliability Goals in the Project Objectives

• Model the Preliminary design to determine equipment availability – Reliability Requirements & Possibilities

Page 11: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,

Front End Loading

FEL 2

• Add Reliability enhancing design elements into Project Design and Equipment Selection

• Assure that Maintainability is a significant consideration in the design process

• Develop the Maintenance Plan for the Equipment

• Upgrade the Model with the more complete design information – use results to guide refinements to design

Page 12: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,

Front End Loading

FEL 3

• Develop a Maintenance Materials Strategy

• Increase Maintenance Craft Specialist involvement in review and analysis of designs and equipment selection to assure Maintainability and Reliability

• Determine Maintenance Training needs

• Start Building the Equipment and Parts Master Data

• Develop the Bills of Material

Page 13: DuPont Design for Reliability Tactical Approach to Front End Loading Alfred E. Ogden, MSRE, CMRP DuPont Reliability Engineer MARS Conference 2012 – Galveston,