dulles north industrial park contractor coord coordinate corr corridor cskw casework ct ceramic tile...
TRANSCRIPT
PROPERTY HIGHLIGHTS
OVERVIEW
• 2 High bay warehouse buildings totaling approximately 293,000 SF• Tilt-up concrete construction• Features a visually pleasing neutral palette with stone accent• The last and most northern industrial development site in the Dulles Corridor• Immediately accessible to all points in Northern VA and the DC region • 20 Acre site• PD-IP Zoning
BUILDING 1
• 154,125 SF • Divisible to 20,400 SF bays• 30’ Clear ceiling height• 224' - 230' Deep• 40’ x 40’ Column spacing• 50' Speed bay• 125’ Truck court• ESFR sprinkler system• T5 lighting
BUILDING 2
• 138,628 SF• Divisible to 23,000 SF bays• 30’ Clear ceiling height• 290' at its deepest and 226' at the end• 40’ x 40’ Column spacing• 50' Speed bay• 120’ Truck court• ESFR sprinkler system• T5 lightingCLASS A WAREHOUSE/DISTRIBUTION & DATA CENTER SPACE AVAILABLE
DULLES NORTH INDUSTRIAL PARK 45905 & 45781 MARIES ROAD | STERLING, VA | WWW.DULLES-NORTH.COM
Nokes Blvd
Gloucester Pkwy
Loud
oun C
ounty P
kwy
Cas
cade
s Pk
wy
7
28
28
Village at Potomac Falls
Dulles Town Center
Dulles Town Crossing
Walmart Supercenter Sams Club
Dulles Golf Center& Sports Park
Home Depot
Potomac RunPlaza
Cosco
Washington RedskinsTraining Facility
Loudoun Tech Center
1757 Golf Club
BUILDING 2
BUILDING 1
N
4600 Wedgewood Blvd, Suite A, Frederick, MD 21703(301) 694.9200 • www.mataninc.com
BRAD [email protected] www.mataninc.comJP MATAN
BUILDING 2
BUILDING 1
CC
SPRINKLERROOM
101
A A
EE
FF
GG
12345678910
DD
1112131415161718
40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 45' - 0"
B B
WAREHOUSE102
685' - 0"
230'
- 0"
16' -
0"
40' -
0"
40' -
0"
40' -
0"
40' -
0"
54' -
0"
3PLY THREE-PLY
A/E ARCHITECT/ENGINEERACT ACOUSTICAL CEILING TILEADA AMERICANS WITH
DISABILITIES ACTADH ADHESIVEADJ ADJACENTAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEAHU AIR HANDLING UNITALT ALTERNATEALUM ALUMINUMAPC ACOUSTICAL PANEL CEILINGAPPROX APPROXIMATEARCH ARCHITECTATTN ATTENTIONAVG AVERAGEAWI ARCHITECTURAL WOODWORKING
INSTITUTE
BD BOARDBITUM BITUMINOUSBLDG BUILDINGBLKG BLOCKINGBLW BELOWBRG BEARINGBSMT BASEMENTBTWN BETWEEN
C CARPETCAB CABINETCD CONSTRUCTION
DOCUMENTSCG CORNER GUARDCHEM CHEMICALCIR CIRCLE, CIRCULARCJ CONSTRUCTION JOINTCL CENTER LINECLG CEILINGCLO CLOSETCLR CLEARCMU CONCRETE MASONRY UNITCNR CORNERCOL COLUMNCOMM COMMUNICATIONCONC CONCRETECONF CONFERENCECONST CONSTRUCTIONCONTIN CONTINUOUSCONTR CONTRACTORCOORD COORDINATECORR CORRIDORCSKW CASEWORKCT CERAMIC TILECTR CENTERCUFT CUBIC FOOTCUYD CUBIC YARD
DBL DOUBLEDEG DEGREE
DEMO DEMOLITIONDEPT DEPARTMENTDTL DETAILDEV DEVELOPMENTDF DRINKING FOUNTAINDIAG DIAGONALDIFF DIFFERENCE
DIM DIMENSIONDIST DISTANCEDIV DIVIDEDOC DOCUMENTDR DOORDS DOWNSPOUTDW DISHWASHERDWG DRAWING
E EASTEA EACHEIFS EXTERIOR INSULATION & FINISH SYSTEMEJ EXPANSION JOINTELEC ELECTRICEVTR ELEVATOREMER EMERGENCYENTR ENTRANCEENVIR ENVIRONMENTEQ EQUALEQUIP EQUIPMENTE/W EACH WAYEXC EXCAVATEEXH EXHAUSTEXIST EXISTINGEXP EXPANSIONEXT EXTERIOR
FD FLOOR DRAINFDN FOUNDATIONFE FIRE EXTINGUISHERFE/C FIRE EXTINGUISHER CABINETFF FACTORY FINISHFF&E FURNITURE, FIXTURE, AND
EQUIPMENTFHC FIRE HOSE CABINETFIN FINISHFLR FLOORFM FLOOR MATFOM FACE OF MASONRYFT FEET / FOOTFTG FOOTINGFURG FURRINGFURN FURNITUREFRP FIBERGLASS REINF. PANEL
GA GAUGEGALV GALVANIZEDGC GENERAL CONTRACTORGF GLAZING FILMGL GLASSGLZ GLAZINGGR GRADE
GWB GYPSUM WALL BOARDGYM GYPSUM
HC HANDICAPHDW HARDWAREHM HOLLOW METALHOR HORIZONTALHPC HIGH PRESSURE COATINGHT HEIGHTHVAC HEATING, VENTILATING, AND AIR
CONDITIONINGHW HOT WATER
ID IDENTIFICATIONIMP INSULATED METAL PANELINSTL INSTALLINSUL INSULATIONINT INTERIORISO ISOMETRICIWP IMPACT RESISTANT WALL
PROTECTIONIRGWB IMPACT RESISTANT GYPSUM
WALL BOARD
JAN JANITORJT JOINT
KD KNOCKED DOWNKIT KITCHEN
LAB LABORATORYLAM LAMINATELAV LAVATORYLF LINEAR FEET (FOOT)LIB LIBRARYLIN LINEARLKR LOCKER
MATL MATERIALMAX MAXIMUMMCT MODULAR CARPET TILEMECH MECHANICALMRF MANUFACTURERMIN MINIMUMMIRR MIRRORMISC MISCELLANEOUSMO MASONRY OPENINGMOD MODIFYMR GWB MOISTURE RESISTANT GYPSUM
BOARDMTD MOUNTEDMTG MEETINGMTL METALMULT MULTIPLEMUNIC MUNICIPAL
N NORTHNA NOT APPLICABLENIC NOT IN CONTRACTNOM NOMINALNTS NOT TO SCALE
O\ OVEROC ON CENTEROD OUTSIDE DIAMETEROH DR OVERHEAD (COILING) DOOROPH OPPOSITE HANDOPNG OPENINGOPP OPPOSITEORIG ORIGINAL
PAR PARALLELPAT PATTERNPERF PERFORATEDPLAM PLASTIC LAMINATEPLBG PLUMBINGPLYWD PLYWOODPNT PAINTPR PAIRPREFAB PREFABRICATEDPRKG PARKINGPROJ PROJECTPSF POUNDS PER SQUARE FOOTPTD PAINTEDPTN PARTITIONPWP PROTECTIVE WALL PADPWR POWER
QC QUALITY CONTROLQTY QUANTITY
R RISERRBC RESILIENT BASE COVERBS RESILIENT BASE STRAIGHTRBR RUBBERRCP REFLECTED CEILINGPLANRD ROOF DRAINREC RECESSEDREF REFRIGERATORREG REGULATIONREM REMOVABLEREQD REQUIREDRES RESILIENTREV REVISIONRF RESINOUS FLOORINGRFI REQUEST FOR INFORMATIONRFP REQUEST FOR PROPOSALRM ROOMRO ROUGH OPENINGRSF RUBBER SHEET FLOORINGRTU ROOF TOP UNIT
S SOUTHSALV SALVAGESAN SANITARYSC SOLID CORESCHED SCHEDULESCHEM SCHEMATICSF SQUARE FOOT (FEET)SIM SIMILARSLR SEALERSPEC SPECIFICATION
SPKLR SPRINKLERSQ SQUARESS STAINLESS STEELSSF SOLID SURFACE FABRICATIONSTD STANDARDSTL STEELSTN STAINSTOR STORAGESTRUCT STRUCTURALSUB FL SUBFLOORSUSP SUSPENDSYS SYSTEM
T TOILETT&G TONGUE AND GROOVETD TRENCH DRAINTEMP TEMPORARYTHERM THERMALTHK THICKNESSTHRU THROUGHTLT TOILETTMPD TEMPEREDTO FDN TOP OF FOUNDATINTOC TOP OF CONCRETETOM TOP OF MASONRYTOS TOP OF STEELTOW TOP OF WALLTR TREADTV TELEVISIONTYP TYPICAL
UL UNDERWRITERS LABORATORIESUNEX UNEXCAVATEDUNFIN UNFINISHEDUNO UNLESS NOTED OTHERWISEUTIL UTILITY
VAC VACUUMVB VINYL BASEVBC VINYL BASE COVEVBS VINYL BASE STRAIGHTVCT VINYL COMPOSITION TILEVERT VERTICALVEST VESTIBULEVIF VERIFY IN FIELDVSF VINYL SHEET FLOORINGVTR VENT THROUGH ROOFVWC VINYL WALL COVERING
W WESTW/O WITHOUTWB WOOD BASEWC WALL COVERINGWD WOODWDW WINDOWWM WIRE MESHWP WORKING POINTWSF WELDED SHEET FLOORINGWWF WELDED WIRE FABRICWWM WELDED WIRE MESH
YD YARD
ABBREVIATIONS
NOTIFY THE ARCHITECT, IN WRITING, OF ANY DISCREPANCIES FOUND WITHIN THE CONSTRUCTION DOCUMENTS PRIOR TO BEGINNING THE WORK. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, ALL DIMENSIONS, FLOOR TO FLOOR HEIGHTS, TOP OF STEEL ELEVATIONS, MASONRY OPENING LOCATIONS AND SIZES, COLUMN LOCATIONS AND SIZES, AND SIMILAR CONDITIONS. FIELD VERIFY ALL EXISTING CONDITIONS OF EXISTING CONSTRUCTION WHERE NEW WORK IS REQUIRED TO TIE IN. THIS INCLUDES ALL DIMENSIONS AND CONSTRUCTION CONDITIONS WHETHER SHOWN ON PLANS OR NOT. IF DISCREPANCIES ARE FOUND, NOTIFY ARCHITECT AND PROVIDE VERIFIED FIELD CONDITIONS.
COMPLY WITH, AND PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE LAWS, STATUTES, ORDINANCES, LAWFUL ORDERS OF GOVERNMENTAL AUTHORITIES, BUILDING CODES, RULES AND REGULATIONS, UNLESS CONTRACT DOCUMENTS REQUIRE A HIGHER OR GREATER STANDARD TO BE CONFORMED TO. IF PORTIONS OF THE CONTRACT DOCUMENTS ARE RECOGNIZED AS NOT MEETING THE STANDARD ESTABLISHED THEREBY, PROMPTLY NOTIFY ARCHITECT IN WRITING BEFORE PROCEEDING WITH WORK.
BE ACQUAINTED WITH WORK TO BE DONE, MATERIALS AND EQUIPMENT TO BE INSTALLED AND COORDINATE IN ADVANCE PRIOR TO INSTALLING ANY SYSTEM OR PORTION THEREOF.
EACH CONTRACTOR WHO FAILS TO COORDINATE INSTALLATION OF HIS WORK WITH OTHER TRADES SHALL BEAR ALL COSTS OF EACH TRADE FOR DISCONNECTING, REMOVAL AND RE-INSTALLATION OF AFFECTED SYSTEMS, EQUIPMENT OR PORTION THEREOF.
UNLESS NOTED OTHERWISE, GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING FOR ALL STRUCTURAL STEEL, MISCELLANEOUS STEEL, AND LOOSE LINTELS NECESSARY TO SUPPORT ALL ROOF TOP MOUNTED EQUIPMENT, MASONRY OPENINGS, PASSAGES, WINDOWS AND FRAME ALL ROOF OPENINGS. GENERAL CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL DRAWINGS OF ALL CONTRACTS TO DETERMINE QUANTITY, SIZE AND LOCATIONS OF ALL ROOF TOP EQUIPMENT, MASONRY OPENINGS AND ALL ROOF AND FLOOR OPENINGS.
REFER TO M/E/P DRAWINGS FOR RECESSED OR SEMI-RECESSED PLUMBING AND HEATING EQUIPMENT AND GRILLE LOCATIONS NOT SHOWN ON BUILDING PLANS. VERIFY EXACT LOCATION WITH ENGINEER PRIOR TO CONSTRUCTING WALLS.
PROVIDE CONTINUOUS INSULATION ENVELOPE AND THERMAL BREAKS AT ALL AREAS OF BUILDINGS,. INSTALL INSULATION WITH VAPOR BARRIER TO WARM SIDE. COORDINATE INSULATION INSTALLATION WITH M/E/P DRAWINGS FOR PLENUM SPACES.
PROVIDE BOND BREAKER SEPARATION AT ALL LOCATIONS OF DISSIMILAR MATERIALS.
PROVIDE WOOD BLOCKING OR STRAPPING AS REQUIRED IN WALLS TO SUPPORT WALL-MOUNTED ITEMS.
GENERAL NOTES1.
2.
3.
4.
5.
6.
7.
8.
9.
SYMBOLS LEGEND
NORTH ARROWOFFICE
101
101A DOOR TAG
A101 1 ELEVATION TAG
2A401
2A301
W1
1
1' - 0"
S3A
2ENLARGED PLAN OR SECTION
SECTION TAG
WINDOW TAG
ROOM TAG
PARTITION TAG
DEMOLITION TAG
REVISION TAG
LEVEL TAG
MATERIALS LEGENDCONCRETE
MASONRY
EARTH
GYPSUM BOARD
RIGID INSULATION
BATT INSULATION
PLYWOOD
WOOD
WOOD BLOCKING
STEEL
N
N
CONTACT:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SEAL:
PROJECT:
PROJECT NUMBER:
DATE:
DRAWING TITLE:
DRAWING NUMBER:
COPYRIGHT c 2016
KEYPLANSCALE: NONE
AREA A
AREA B
AREA C
1
A
G
AREA D
18
AREA E
AREA F
7
D
12
INCOMPLETE DRAWING,SUBJECT TO FURTHER
DEVELOPMENT AND OR CHANGES
PROGRESS PRINT
DATEOCT 28, 2016
10/2
8/20
16 8
:19:
19 A
MC
:\Use
rs\d
avec
\Doc
umen
ts\H
F16-
ARC
H-C
EN
TRA
L_R
17_d
chob
anof
f@nu
tecg
roup
.com
.rvt
D.S.M.
D.R.C.
D.S.M.
A101
OVERALL FLOORPLAN AND GENERAL
INFORMATION
DULLES NORTHBUILDING
4589 MARIES ROADLOUNDOUN COUNTY
STERLING, VIRGINA 20166
M.N.O.
SCALE: 1" = 30'-0"OVERALL FLOOR PLAN1N
REVISIONS
21 3 4 5 6 7 8 9 10 11 12 13
A
C
D
E
F
G
H
I
14
3' - 0"
3' - 0
"
-
-
N
CONTACT:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SEAL:
PROJECT:
PROJECT NUMBER:
DATE:
DRAWING TITLE:
DRAWING NUMBER:
COPYRIGHT c 2017
KEYPLANSCALE: NONE
AREA A
AREA B
AREA C
1
A
AREA D
INCOMPLETE DRAWING,SUBJECT TO FURTHER
DEVELOPMENT AND OR CHANGES
PROGRESS PRINT
DATEMAY 31, 2017
7 11 14
E
I
5/31
/201
7 8:
07:2
0 AM
P:\p
roje
cts\
899
Proj
ects
\Mat
an -
Dul
les
Nor
th 4
\Des
ign\
Cen
tral
File
\089
9-AR
CH-C
ENTR
AL-R
17.rv
t
D.R.C.
D.R.C.
D.S.M.
-
A101
OVERALL PLAN ANDGENERAL
INFORMATION
DULLES NORTHBUILDING LOT 4
-
4589 MARIES ROADLOUNDOUN COUNTY
STERLING, VIRGINA 20166
D.S.M.
SCALE: 1/16" = 1'-0" OVERALL LIFE SAFETY PLAN1
REVISIONS
BUILDING 1 - 154,125 SF
BUILDING 2 - 138,628 SF
UP TO 50 MEGA WATTS OF POWER AVAILABLE8 - 10 MEGA WATTS WITHIN 12 MONTHS