Courtyard 27500 Jefferson St. NEAlbuquerque, NM87109-4335www.bhinc.comvoice: 505.823.1000facsimile: 505.798.7988
TO: Patrick Chavez, PEStorm Water Quality Engineer
DATE: 7/27/2020
REPORT NUMBER: 143
PROJECT NUMBER: 20190447
PROJECT: AMAFCA Lower Bear Tributary Water QualityImprovements
LOCATION: Wyoming Blvd. to Spain. North of Arroyo DelOso Park
OWNER: AMAFCA
PRIME CONTRACTOR:
SUB-CONTRACTORS:
AUI Inc.
None
PROJECT MANAGER:OBSERVER:
David PerkoRobert Carr
DATE: Monday 7/27/2020 WEATHER: High: 85°F, Low: 64°F, Overcast.Wind Speed: 5mph, Gusts: 7 mph
CONTRACTOR HOURS:7:00am - 4:00pmFIELD OBSERVATIONS:7:00am to 1:00pm
VISITORS ON SITE: None reported
SUB-CONTRACTORS ON SITE:
EQUIPMENT ON SITE:AUI Inc.
1 Golden G700 Blade1 John Deere 644K Loader1 Kenworth 2500 Gallon Water Truck1 Kubota SVL 75-2 Skidster1 Volvo 45D Compactor Smooth DrumVibratory
PERSONNEL ON SITE:AUI Inc.
1 Superintendent5 Laborer2 Operator3 Carpenter1 Foreman
WORK DESCRIPTION:
Car-5 Area
Temporary berm still diverting water into east box culvert.
Tract out
Tract out completed by cul de sac.No other work going on today, due to rain water running down the channel.
IMAGES:
Tract out by the cul de sac completed.
Car-5 area temporary berm still diverting water into east box culvert.
Courtyard 27500 Jefferson St. NEAlbuquerque, NM87109-4335www.bhinc.comvoice: 505.823.1000facsimile: 505.798.7988
TO: Patrick Chavez, PEStorm Water Quality Engineer
DATE: 7/28/2020
REPORT NUMBER: 144
PROJECT NUMBER: 20190447
PROJECT: AMAFCA Lower Bear Tributary Water QualityImprovements
LOCATION: Wyoming Blvd. to Spain. North of Arroyo DelOso Park
OWNER: AMAFCA
PRIME CONTRACTOR:
SUB-CONTRACTORS:
AUI Inc.
None
PROJECT MANAGER:OBSERVER:
David PerkoRobert Carr
DATE: Tuesday 7/28/2020 WEATHER: High: 84°F, Low: 63°F, PartlyCloudy. Wind Speed: 5mph, Gusts: 7 mph
CONTRACTOR HOURS:7:00am - 4:00pmFIELD OBSERVATIONS:7:00am to 1:00pm
VISITORS ON SITE: None reported
SUB-CONTRACTORS ON SITE:
EQUIPMENT ON SITE:AUI Inc.
1 Golden G700 Blade1 John Deere 644K Loader1 Kenworth 2500 Gallon Water Truck1 Kubota SVL 75-2 Skidster1 Volvo 45D Compactor Smooth DrumVibratory
PERSONNEL ON SITE:AUI Inc.
1 Superintendent5 Laborer2 Operator3 Carpenter1 Foreman
WORK DESCRIPTION:
Car-5 Area
Low flow trench was cleaned out of water and saturated soil. A plan to fill the void below concrete slab was not received fromthe contractors PM. How ever the contractors PM received a verbal ok to use a lean flowable fill from AMAFCA.
IMAGES:
Car area 5 low flow trench west side.
Car 5 area low flow trench east side.
Car 5 area flowable lean fill for undermining of low flow trench.
COPIES [email protected]@[email protected]
REVIEWED7/28/2020
FIELD REPORT SIGNED7/28/2020
Courtyard 27500 Jefferson St. NEAlbuquerque, NM87109-4335www.bhinc.comvoice: 505.823.1000facsimile: 505.798.7988
TO: Patrick Chavez, PEStorm Water Quality Engineer
DATE: 7/29/2020
REPORT NUMBER: 145
PROJECT NUMBER: 20190447
PROJECT: AMAFCA Lower Bear Tributary Water QualityImprovements
LOCATION: Wyoming Blvd. to Spain. North of Arroyo DelOso Park
OWNER: AMAFCA
PRIME CONTRACTOR:
SUB-CONTRACTORS:
AUI Inc.
None
PROJECT MANAGER:OBSERVER:
David PerkoRobert Carr
DATE: Wednesday 7/29/2020 WEATHER: High: 88°F, Low: 63°F, Clear. WindSpeed: 6mph, Gusts: 9 mph
CONTRACTOR HOURS:7:00am - 4:00pmFIELD OBSERVATIONS:7:00am to 1:00pm
VISITORS ON SITE: None reported
SUB-CONTRACTORS ON SITE:
EQUIPMENT ON SITE:AUI Inc.
1 Golden G700 Blade1 John Deere 644K Loader1 Kenworth 2500 Gallon Water Truck1 Kubota SVL 75-2 Skidster1 Volvo 45D Compactor Smooth DrumVibratory
PERSONNEL ON SITE:AUI Inc.
1 Superintendent5 Laborer2 Operator3 Carpenter1 Foreman
WORK DESCRIPTION:
Car-5 Area
Low flow trench, lean fill was excavated to proper elevation and dowels were epoxy in the slab.
Car-2 Area
Loader started mixing on site soil material with import. Took a sample in to lab to start gradations.
IMAGES:
Low flow trench at Car 5 area. Flowable lean fill placed yesterday.
Low flow trench Car 5 area, lean fill excavated. Dowels epoxy into slab.
Low flow trench Car 5 area west side.
COPIES [email protected]@[email protected]
REVIEWED7/30/2020
FIELD REPORT SIGNED7/29/2020
Courtyard 27500 Jefferson St. NEAlbuquerque, NM87109-4335www.bhinc.comvoice: 505.823.1000facsimile: 505.798.7988
TO: Patrick Chavez, PEStorm Water Quality Engineer
DATE: 7/30/2020
REPORT NUMBER: 146
PROJECT NUMBER: 20190447
PROJECT: AMAFCA Lower Bear Tributary Water QualityImprovements
LOCATION: Wyoming Blvd. to Spain. North of Arroyo DelOso Park
OWNER: AMAFCA
PRIME CONTRACTOR:
SUB-CONTRACTORS:
AUI Inc.
None
PROJECT MANAGER:OBSERVER:
David PerkoRobert Carr
DATE: Thursday 7/30/2020 WEATHER: High: 95°F, Low: 66°F, Clear. WindSpeed: 6mph, Gusts: 9 mph
CONTRACTOR HOURS:7:00am - 4:00pmFIELD OBSERVATIONS:7:00am to 1:00pm
VISITORS ON SITE: None reported
SUB-CONTRACTORS ON SITE:
EQUIPMENT ON SITE:AUI Inc.
1 Golden G700 Blade1 John Deere 644K Loader1 Kenworth 2500 Gallon Water Truck1 Kubota SVL 75-2 Skidster1 Volvo 45D Compactor Smooth DrumVibratory
PERSONNEL ON SITE:AUI Inc.
1 Superintendent5 Laborer2 Operator3 Carpenter1 Foreman
WORK DESCRIPTION:
Car-5 Area
Set forms for low flow notch this morning, placed concrete at 1:30 pm.Backfilled under apron area where they over excavated unsatisfactory soil.
IMAGES:
Setting forms for low flow notch Area 5.
Backfilling Car-5 area.
Car 5 area low flow notch, ready for concrete.
Car 5 area, placing concrete.
Courtyard 27500 Jefferson St. NEAlbuquerque, NM87109-4335www.bhinc.comvoice: 505.823.1000facsimile: 505.798.7988
TO: Patrick Chavez, PEStorm Water Quality Engineer
DATE: 7/31/2020
REPORT NUMBER: 147
PROJECT NUMBER: 20190447
PROJECT: AMAFCA Lower Bear Tributary Water QualityImprovements
LOCATION: Wyoming Blvd. to Spain. North of Arroyo DelOso Park
OWNER: AMAFCA
PRIME CONTRACTOR:
SUB-CONTRACTORS:
AUI Inc.
None
PROJECT MANAGER:OBSERVER:
David PerkoRobert Carr
DATE: Friday 7/31/2020 WEATHER: High: 100°F, Low: 64°F, Clear. WindSpeed: 9mph, Gusts: 15 mph
CONTRACTOR HOURS:7:00am - 4:00pmFIELD OBSERVATIONS:7:00am to 1:00pm
VISITORS ON SITE: None reported
SUB-CONTRACTORS ON SITE:
EQUIPMENT ON SITE:AUI Inc.
1 Golden G700 Blade1 John Deere 644K Loader1 Kenworth 2500 Gallon Water Truck1 Kubota SVL 75-2 Skidster1 Volvo 45D Compactor Smooth DrumVibratory
PERSONNEL ON SITE:AUI Inc.
1 Superintendent5 Laborer2 Operator3 Carpenter1 Foreman
WORK DESCRIPTION:
Car-5 Area
Backfill operations continued at bottom of channel north side of area 5.Also backfill continued behind wing wall LT. of area 5.Forms were stripped on the low flow notch.
IMAGES:
Back fill behind wing wall LT. Car 5 area.
Area 5 bottom of channel back fill.
Low flow notch area5.
COPIES [email protected]@[email protected]
REVIEWED8/3/2020
FIELD REPORT SIGNED7/31/2020