duct & fitting symbols hvac symbols & …
TRANSCRIPT
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N. 11, 2 0 0 5
RE
GIS
T ERED PROF ESSION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
This
docu
ment,
and t
he id
eas a
nd de
signs
inco
rpor
ated h
erein
, as a
n ins
trume
nt of
profe
ssion
al se
rvice
, is th
e pro
perty
of K
istler
Sma
ll + W
hite A
rchite
cts an
d is n
ot to
be us
ed, in
who
le or
in pa
rt, fo
r any
othe
r pro
ject w
ithou
t the
writt
en au
thoriz
ation
of Ki
stler
Sma
ll + W
hite A
rchite
cts.
Copy
write
2016
Kist
ler S
mall +
Whit
e Arch
itects
, LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
7/2
8/2
020
10:4
8:0
6 A
M
M1.0
02.13.2020
1905
PHASE 2BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
MECHANICALLEGEND AND
NOTES
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2
GENERAL SYMBOLSDUCT & FITTING SYMBOLS GENERAL NOTESHVAC SYMBOLS & ABBREVIATIONS HVAC ABBREVIATIONS
PIPE SYMBOLS
T
XXX
XX(F)
T
P
NATURAL GAS PIPING
CONDENSATE DRAIN PIPING
DIRECTION OF FLOW
CHANGE IN SIZE
PIPE UNION
GATE VALVE
BALL VALVE
PRESSURE GAUGE
TEMPERATURE GAUGE GAUGE
PRESSURE REDUCING VALVE
PRESSURE & TEMPERATURE GAUGE PORT
BALANCING VALVE
PUMP
CAP
TEE UP
TEE DOWN
PIPE UP
PIPE DOWN
CHECK VALVE
GLOBE VALVE
REFRIGERANT PIPING
SAFETY RELIEF VALVE
TWO WAY CONTROL VALVE
THREE WAY CONTROL VALVE
STRAINER
HOT WATER HEATING RETURN
HOT WATER HEATING SUPPLY
STEAM CONDENSATE TRAP
R
NG
CD
HWHS
HWHR
CHILLED WATER RETURN
CHILLED WATER SUPPLYCWS
CWR
KEYED NOTES
X
SHEET NUMBER
SECTION DESIGNATION
XX
XX
XXX
REMOVED
INDICATES ITEMS TO BE
ON DEMOLITION PLANS,
LINE BREAK
GENERAL BREAK
SHEET NUMBER
(NUMERICAL) DESIGNATIONSECTION (LETTER) OR DETAIL
REVISION NUMBER
POINT OF NEW CONNECTION
CAP FOR FUTURE
EXISTING
ES
SMOKE DETECTOR
CO₂
SP
SD
D
T
H
or
PARALLEL BLADE DAMPER
BD
M
AD
EMERGENCY SWITCH
CARBON DIOXIDE SENSOR
STATIC PRESSURE SENSOR
DUCT SMOKE DETECTOR
THERMOSTAT OR TEMP SENSOR
HUMIDITY SENSOR
HUMIDISTAT OR
REGISTER, OR DIFFUSER
A FIRE RATED GRILLE,
PREFIX (F) INDICATES
AIRFLOW, CFM
OUTLET / INLET TAG
LINEAR DIFFUSER
REGISTER OR GRILLE
WALL OR DUCT
EXHAUST GRILLE
RETURN GRILLE
SUPPLY DIFFUSER
DIRECTION OF AIRFLOW
FLEXIBLE DUCT CONNECTION
OPPOSED BLADE DAMPER
BACKDRAFT DAMPER
MOTORIZED DAMPER
VERTICAL FIRE DAMPER
FIRE DAMPER
COMBINATION FIRE / SMOKE DAMPER
VOLUME DAMPER
ACCESS DOOR
DUCT WITH INTERNAL ACOUSTICAL INSULATION
TEMPERATURE GAUGE
FILTER
PRESSURE RELIEF GRILLE
PRESSURE GAUGE
FUTURE
ADCEILING ACCESS DOOR
GPM X" PIPE SIZE AND FLOW TAG
NOTE : ABBREVIATIONS AND SYMBOLS ARE ARCSINE
ENGINEERING STANDARDIZED SYMBOL LEGENDS. AS
SUCH, ALL SYMBOLS SHOWN MAY NOT APPEAR ON OR
WITHIN THIS SET OF CONTRACT DOCUMENTS.
VD ON BRANCH DUCT
(E)
(F)
(C)
DIMENSIONS ARE INCHES.
R
D or W
R
W/ TURNING VANES
RECTANGULAR TEE -
90° MITERED ELBOWS
D
R
RNDSQR
48x18∅48x18∅
12"∅ 12"∅
12x1212x12
DOUBLE LINE SINGLE LINE DESCRIPTION
DUCT)
(ROUND OR RECTANGULAR
ELBOW, R=1.5 DIA OR WIDTH90° OR 45° LONG RADIUS
ELBOW W/ TURNING VANES
RECTANGULAR MITERED
END CAP
DUCT SLOPE DOWN (DROP)
DUCT SLOPE UP (RISE)
(ROUND / OVAL DUCT)
45° LATERAL TAKE-OFF
(ROUND / OVAL DUCT)
CONICAL 90° TAKE-OFF
FROM RECTANGULAR MAIN)(SQR TO RND TAKEOFF
TAKE-OFF FITTING W / VD
LATERAL HIGH EFFICIENCY
(RECTANGULAR DUCT)
FLANGED TAKEOFF
TRANSITION
SQUARE TO ROUND
TRANSITION
OR SECTION
EXHAUST DUCT DOWN
OR SECTION
EXHAUST DUCT UP
DUCT DOWN OR SECTIONRETURN OR OSA
DUCT UP OR SECTION
RETURN OR OSA
OR SECTION AWAYSUPPLY DUCT DOWN
OR SECTION
SUPPLY DUCT UP
FLAT OVAL DUCT
ROUND DUCT DIAMETER
HIDDEN DIMENSION. ALLSECOND NUMBER INDICATESVISIBLE DIMENSION ANDFIRST NUMBER INDICATESRECTANGULAR DUCT SIZE
SUPPLY AIR
RETURN AIR
EXHAUST AIR
OUTSIDE AIR
SA
RA
OSA
EA
ECONOMIZER RELIEF AIRERA
FD
FD
FSD
1
ACFM ACTUAL AIR - CUBIC FEET PER MINUTEACH AIR CHANGES PER HOURAD ACCESS DOORAFF ABOVE FINISH FLOORAHU AIR HANDLING UNITAL ALUMINUMAP ACCESS PANELARCH ARCHITECT OR ARCHITECTURALATD AIR TRANSFER DUCT
BD BACKDRAFT DAMPERBLDG BUILDINGBM BEAMBOD BOTTOM OF DUCTBOP BOTTOM OF PIPEBOS BOTTOM OF STEELBTU BRITISH THERMAL UNIT
CDV CLOTHES DRYER VENTCFH CUBIC FEET PER HOURCFM CUBIC FEET PER MINUTECLG CEILINGCONSTR CONSTRUCTIONCR CONDENSATE RETURN (STEAM)CWS CHILLED WATER SUPPLYCWR CHILLED WATER RETURNCV CONSTRAINT VOLUME
DB DRY BULBDIA DIAMETERDN DOWNDWG DRAWINGDX DIRECT EXPANSION (REFRIGERATION)
EA EXHAUST AIREAT ENTERING AIR TEMPERATUREEC ELECTRICAL CONTRACTORELEV ELEVATIONERA ECONOMIZER RELIEF AIRESP EXTERNAL STATIC PRESSUREEWT ENTERING WATER TEMPERATUREEXH EXHAUST
°F FAHRENHEITFC FLEXIBLE CONNECTIONFD FIRE DAMPERFLA FULL LOAD AMPSFLR FLOORFOB FLAT ON BOTTOMFOT FLAT ON TOPFPM FEET PER MINUTEFSD COMBINATION FIRE / SMOKE DAMPER
GALV GALVANIZED STEELGC GENERAL CONTRACTORGM GAS METERGPM GALLONS PER MINUTEGRD GRILLES, REGISTERS, DIFFUSERS
H HUMIDISTATHDPE HIGH-DENSITY POLYETHYLENEHEPA HIGH EFFICIENCY PARTICULATE AIRHP MOTOR HORSEPOWERHVAC HEATING, VENTING, AND CONDITIONINGHWHS HOT WATER HEATING SUPPLYHWHR HOT WATER HEATING RETURN
LB(S) POUND, POUNDSLAT LEAVING AIR TEMPERATURELWT LEAVING WATER TEMPERATURE
MA MIXED AIRMAX MAXIMUMMBH THOUSAND BTU PER HOURMC MECHANICAL CONTRACTORMCA MINIMUM CIRCUIT CAPACITYMECH MECHANICALMFR MANUFACTURERMFS MAXIMUM FUSE SIZEMIN MINIMUMMOCP MAXIMUM OVERCURRENT PROTECTION
NC NORMALLY CLOSEDNG NATURAL GASNIC NOT IN CONTRACTNO NORMALLY OPENNTS NOT TO SCALE
OBD OPPOSED BLADE DAMPEROC ON CENTEROA or OSA OUTSIDE AIROMSC 2014 OREGON MECHANICAL SPECIALTY CODEOSSC 2014 OREGON STRUCTURAL SPECIALTY CODE
PBD PARALLEL BLADE DAMPERPD PRESSURE DRIPPSI POUNDS PER SQUARE INCHPT PRESSURE / TEMPERATURE PLUGPVC POLYVINYL CHLORIDE
RA RETURN AIRRECT RECTANGULARRPM REVOLUTIONS PER MINUTEREQ'D REQUIRED
SA SUPPLY AIRSCFM STANDARD AIR - CUBIC FEET PER MINUTESEC SECTIONSF or SQ FT SQUARE FEETSIM SIMILARSM SHEET METALSMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATIONSP STATIC PRESSURESPEC SPECIFICATION OR SPECIFIEDSS STAINLESS STEELSTD STANDARDSTM STEAM
T THERMOSTATTA TRANSFER AIRTC TEMPERATURE CONTROLSTEMP TEMPERATURETOS TOP OF STEELTYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VAV VARIABLE AIR VOLUMEVD VOLUME DAMPERVFD VARIABLE FREQUENCY DRIVE
WB WET BULBW/ WITHWG WATER GAUGE
1. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO CONSTRUCT A COMPLETE, OPERATIONAL HVAC SYSTEM FOR THE ENTIRE PROJECT AS SHOWN ON THESE DRAWINGS, INCLUDING ALL NECESSARY FEES AND PERMITS.
2. THE ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF THE MOST RECENTLY ADOPTED BUILDING CODE, MECHANICAL CODE, PLUMBING CODE, ELECTRICAL CODE, AND ALL OTHER APPLICABLE CITY, COUNTY, STATE, AND FEDERAL CODES AND REGULATIONS IN EFFECT AT THE DATE OF THE BID. WHEREVER THE REQUIREMENTS OF THE SPECIFICATIONS OR DRAWINGS EXCEED THOSE OF THE ITEMS ABOVE, THE REQUIREMENTS OF THE SPECIFICATIONS OR DRAWINGS SHALL GOVERN.
3. WHERE THE MECHANICAL WORK WILL BE INSTALLED IN CLOSE PROXIMITY TO, OR WILL INTERFERE WITH, WORK OF OTHER TRADES, THE CONTRACTOR SHALL ASSIST IN WORKING OUT SPACE CONDITIONS TO MAKE A SATISFACTORY ADJUSTMENT PRIOR TO COMMENCING WORK. IF THE CONTRACTOR INSTALLS HIS/HER WORK BEFORE COORDINATING WITH OTHER TRADES, SO AS TO CAUSE ANY INTERFERENCE WITH WORK OF OTHER TRADES, THE CONTRACTOR SHALL MAKE THE NECESSARY CHANGES IN HIS/HER WORK TO CORRECT THE CONDITION WITHOUT EXTRA CHARGE.
4. THE DRAWINGS SHOW THE GENERAL DESIGN, ARRANGEMENTS AND THE EXTENT OF THE SYSTEM. IT SHALL BE THE WORK OF THE CONTRACTOR TO MAKE SUCH ALTERATIONS AS MAY BE NECESSARY TO MAKE THE SYSTEM COMPLETE AND OPERATIONAL IN ACCORDANCE WITH THE DESIGN INTENT. MAJOR DEVIATIONS SUCH AS CHANGES IN COMPONENT SIZES, WEIGHTS, QUANTITIES, OR MATERIAL REQUIRE PRIOR APPROVAL BY THE CONSULTING ENGINEER.
5. CONTRACTORS AND SUB-CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY DETERMINED WITHOUT REFERENCE TO THE COMPLETE DOCUMENT SET.
6. THE WORKING DRAWINGS ARE DIAGRAMMATIC. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, THEY DO NOT SHOW EVERY OFFSET, BEND OR ELBOW NECESSARY FOR THE COMPLETE INSTALLATION IN THE SPACE PROVIDED. ALL LOCATIONS FOR HVAC EQUIPMENT AND PIPING SHALL BE CHECKED AND COORDINATED WITH THE ARCHITECTURAL, MECHANICAL, STRUCTURAL AND ELECTRICAL DRAWINGS.
7. SPACE ABOVE ALL CEILINGS IS EXTREMELY LIMITED. CONTRACTORS SHOULD EXPECT AN EXTRA-ORDINARY NUMBER OF OFFSETS, TRANSTIONS, ETC. (WHICH MAY OR MAY NOT BE SHOWN ON THE DRAWINGS) WILL BE REQUIRED. CAREFUL COORDINATION IS REQUIRED WITH ALL TRADES BEFORE ANY PIPE, DUCT, OR EQUIPMENT IS ORDERED, FABRICATED, AND/OR INSTALLED. ANY CONFLICTS AND/OR CHANGES FOUND DURING INSTALLATION THAT RESULT FROM LACK OF COORDINATION BY THE CONTRACTORS DURING THE SHOP DRAWING PROCESS ARE THE RESPONSIBILITY OF THE CONTRACTOR.
8. THE DRAWINGS AND SPECIFICATIONS HAVE BEEN PREPARED TO SUPPLEMENT EACH OTHER AND THEY SHALL BE INTERPRETED AS AN INTEGRAL UNIT WITH THE ITEMS SHOWN ON ONE AND NOT THE OTHER BEING FURNISHED AND INSTALLED AS THOUGH SHOWN AND CALLED OUT IN BOTH.
9. DETAILS: THE CONTRACTOR IS RESPONSIBLE TO REVIEW AND USE WHERE APPROPRIATE ALL OF THE MECHANICAL DETAILS SHOWN ON THE DRAWINGS. DETAILS MAY OR MAY NOT BE CALLED OUT ON THE DRAWINGS WITH SYMBOLS OR KEYED NOTES. ANY CHANGES RESULTING FROM FAILURE TO INSTALL THE MECHANICAL SYSTEM WITHOUT USING THE INCLUDED DETAILS IS THE RESPONSIBILITY OF THE CONTRACTOR.
10. PIPING SCHEMATICS: THE CONTRACTOR IS RESPONSIBLE TO REVIEW THE PIPING SCHEMATICS INCLUDED WITH THE DRAWINGS FOR PIPING CONNECTIONS TO ALL MECHANICAL EQUIPMENT. THE PIPING SCHEMATICS SHOW DETAILED CONNECTIONS INCLUDING NECESSARY VALVES, FITTINGS, PRESSURE AND TEMPERATURE GAUGES, ETC., THAT ARE NOT SHOWN ON THE PIPING PLANS. ANY CHANGES RESULTING FROM FAILURE TO INSTALL THE MECHANICAL SYSTEM WITHOUT USING THE INCLUDED PIPING SCHEMATICS IS THE RESPONSIBILITY OF THE CONTRACTOR.
11. ALL DUCTWORK SHALL BE GALVANIZED STEEL, ROUND OR RECTANGULAR. GAUGE, REINFORCEMENT, AND SUPPORT SHALL BE PER SMACNA DUCT CONSTRUCTION STANDARDS. UNLESS NOTED OTHERWISE, SUPPLY AIR DUCTS SHALL BE CONSTRUCTED TO +2” PRESSURE STANDARD, RETURN DUCTS SHALL BE CONSTRUCTED TO -1” PRESSURE STANDARD. SEAL ALL DUCTS TO SMACNA CLASS “B” STANDARDS. INSTALL IN CONFORMANCE TO MECHANICAL CODES. FLEXIBLE DUCTS SHALL BE INSULATED NONMETALLIC, FORM "NM-IL", MAXIMUM LENGTH OF 5'-0" AT DIFFUSER OR GRILLE CONNECTION. PROVIDE BUTTERFLY BALANCING DAMPERS WHERE SHOWN OR REQUIRED, ROUND OR RECTANGULAR, GALVANIZED SHEET METAL, WITH EXTERNAL INDICATING QUADRANT AND SETSCREW. PROVIDE TURNING VANES FOR ALL RECTANGULAR ELBOWS.
12. SHEET METAL DUCT SIZES SHOWN ARE NET CLEAR INSIDE DIMENSIONS. WHEN INTERNAL INSULATION IS REQUIRED, DUCT SIZE SHALL BE INCREASED TO PROVIDE NET CLEAR DIMENSIONS INDICATED.
13. CONTRACTOR SHALL INSTALL EXPOSED DUCTWORK IN A NEAT AND CLEAN MANNER AND UTILIZE SPIRAL DUCTWORK WHERE POSSIBLE. SCRATCHED OR DENTED DUCTWORK SHALL BE REPLACED. THE ARCHITECT AND/OR ENGINEER SHALL BE THE FINAL JUDGE OF ACCEPTANCE.
14. ALL PIPING SERVING AS PART OF A HEATING OR COOLING SYSTEM SHALL BE INSULATED PER SECTION 503.2.8 OF THE OEESC.
15. DUCTWORK INSULATION:A. ALL SUPPLY AIR DUCTS IN UNCONDITIONED SPACES AND PLENUMS (ABOVE CEILINGS, WITHIN CHASES, SHAFTS, OR MECHANICAL ROOMS) AND WITHIN THE BUILDING ENVELOPE SHALL BE INSULATED WITH 2"
THICK FIBERGLASS DUCT WRAP FACED WITH OUTER FOIL BLANKET, OR LINED WITH 1-1/2" THICK, COATED FIBERGLASS INSULATION, MINIMUM INSTALLED R-VALUE OF 5.B. ALL OUTSIDE AIR DUCTS IN UNCONDITIONED SPACES AND PLENUMS (ABOVE CEILINGS, WITHIN CHASES, SHAFTS, OR MECHANICAL ROOMS) AND WITHIN THE BUILDING ENVELOPE SHALL BE INSULATED WITH
1-1/2" THICK, 3/4 LB. DENSITY, FIBERGLASS DUCT WRAP FACED WITH OUTER FOIL BLANKET, OR LINED WITH 1/2" THICK, COATED FIBERGLASS INSULATION, MINIMUM INSTALLED R-VALUE OF 1.9.C. ALL OUTSIDE AIR DUCTS WITHIN FULLY CONDITIONED SPACES SHALL BE INSULATED WITH 1-1/2" THICK, 3/4 LB. DENSITY, FIBERGLASS DUCT WRAP FACED WITH OUTER FOIL BLANKET, OR LINED WITH 1" THICK,
COATED FIBERGLASS INSULATION, MINIMUM INSTALLED R-VALUE OF 3.5.D. ALL EXHAUST AIR DUCTWORK SHALL BE INSULATED BETWEEN THE FAN OUTLET AND WALL/ROOF OUTLET WITH 1-1/2" THICK, 3/4 LB. DENSITY, FIBERGLASS DUCT WRAP FACED WITH OUTER FOIL BLANKET,
MIN. INSTALLED R-VALUE OF 3.5.E. EXPOSED SUPPLY AND RETURN AIR DUCTWORK WITHIN CONDITIONED SPACES NEED NOT BE INSULATED UNLESS NOTED OTHERWISE.
16. PROVIDE FLEXIBLE DUCT CONNECTORS WHERE DUCTS CONNECT TO AIR HANDLING EQUIPMENT.
17. DUCT SMOKE DETECTORS:A. UPON ACTIVATION, THE SMOKE DETECTORS SHALL SHUT DOWN ALL OPERATIONAL CAPABILITIES OF THE AIR DISTRIBUTION SYSTEM IN ACCORDANCE WITH THE LISTING AND LABELING OF APPLIANCES USED
IN THE SYSTEM.B. WHEN A FIRE ALARM SYSTEM IS PROVIDED THE DUCT SMOKE DETECTORS SHALL BE CONNECTED TO THE BUILDING'S FIRE ALARM CONTROL PANEL. C. PROVIDE REMOTE TEST AND RESET CAPABILITIES FOR ALL DUCT DETECTORS.
18. THE STRUCTURE SHOWN ON ALL DETAILS MAY OR MAY NOT PERTAIN TO A PORTION OR ANY PORTION OF THE BUILDING. COORDINATE MOUNTING REQUIREMENTS WITH ARCHITECTURAL AND STRUCTURALDRAWINGS.
19. ALL EQUIPMENT SHALL PROVIDE THE SCHEDULED PERFORMANCE AT THE SITE ALTITUDE OF 1950 FT. ALL MANUFACTURERS’ SUBMITTAL DATA SHEETS SHALL SHOW PERFORMANCE AT SITE ALTITUDE.
20. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL FITTINGS, TRANSITIONS, VALVES, DAMPERS, AND OTHER DEVICES AND ACCESSORIES REQUIRED FOR A COMPLETE, WORKABLE INSTALLATION.
21. ALL MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING MUST BE SEISMICALLY BRACED FOR THE SITE SPECIFIC SEISMIC DESIGN CATEGORY AND SEISMIC USE GROUP, IN ACCORDANCE WITH THE LATESTADOPTED EDITIONS OF THE OSSC, OMSC, ASHRAE, AND SMACNA. COORDINATE SITE SPECIFIC SEISMIC REQUIREMENTS WITH STRUCTURAL ENGINEER AND/OR ARCHITECT.
22. THE MECHANICAL CONTRACTOR SHALL FURNISH ALL REQUIRED MOTORS AND STARTERS. DISCONNECTS, WHEN NOT A PART OF THE EQUIPMENT, WILL BE FURNISHED BY THE ELECTRICAL CONTRACTOR.
23. EXISTING INTERIOR PIPING, EQUIPMENT, AND DUCTWORK HAS BEEN LOCATED IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL VERIFY LOCATIONS AND POINTS OF CONNECTION AND PIPE ROUTINGTHROUGH EXISTING CONDITIONS PRIOR TO COMMENCING WORK.
24. IF CONTRACTOR ENCOUNTERS MATERIAL WHICH MAY CONTAIN ASBESTOS, IMMEDIATELY STOP WORK IN THIS AREA AND NOTIFY THE OWNER.
25. THE CONTRACTOR IS RESPONSIBLE FOR HVAC EQUIPMENT CHECK-IN, SAFEKEEPING, AND DAMAGE.
26. DO NOT ROUTE DUCTS AND PIPES ABOVE ELECTRICAL PANELS. ALL ELECTRICAL PANELS MUST HAVE CLEAR ACCESS SPACE IN FRONT OF PANEL 4'-0" DEEP AND 6'-6" HIGH. DO NOT ROUTE DUCT AND PIPES IN ELECTRICAL ROOMS, EXCEPT DUCTS AND PIPES SERVING THE ROOM.
27. COORDINATE EXACT LOCATIONS OF CEILING DIFFUSERS AND GRILLES WITH ARCHITECTURAL REFLECTED CEILING PLAN.
28. ALL FIRE DAMPERS SHOWN ARE 1-1/2 HOUR UNLESS OTHERWISE NOTED. INSTALL IN COMPLIANCE WITH MANUFACTURER’S U.L. LISTING.
29. PROVIDE CEILING ACCESS PANELS AS REQUIRED WHERE MECHANICAL EQUIPMENT, VALVES, VAV BOXES, FIRE DAMPERS, ETC. ARE LOCATED ABOVE INACCESSIBLE CEILINGS. MINIMUM ACCESS PANEL SIZE IS 24”x24” UNLESS OTHERWISE NOTED.
30. TWO OPERATING AND MAINTENANCE MANUALS SHALL BE PROVIDED IN HARD BACK LOOSE LEAF BINDERS. MANUALS SHALL CONTAIN PRODUCT CUT SHEETS AND OPERATING AND MAINTENANCE INSTRUCTIONS ON ALL EQUIPMENT, ACCESSORIES, FIXTURES, VALVES, ETC., PROVIDED FOR THE PROJECT. PROVIDE LIST OF EQUIPMENT WITH ALL NAMEPLATE DATA INCLUDING TAG #, MODEL NUMBER, SERIAL NUMBER, AND NAME OF LOCAL REPLACEMENT PARTS SUPPLIER.
31. UPON COMPLETION OF THE WORK, REMOVE ALL SURPLUS MATERIALS AND RUBBISH. MAKE ALL REQUIRED PATCHING AND REPAIRS OF OTHER TRADES' WORK DAMAGED BY THE MECHANICAL CONTRACTOR, AND LEAVE THE PREMISES IN A CLEAN, ORDERLY CONDITION.
32. THE MECHANICAL CONTRACTOR SHALL OPERATE THE SYSTEM AND DEMONSTRATE ALL ASPECTS TO THE ENGINEER AND/OR OWNER, TO PROVE ITS OPERATION. ALL FILTERS USED DURING CONSTRUCTION SHALL BE REPLACED PRIOR TO THE TEST RUN PERIOD.
33. THE CONTRACTOR SHALL, DURING CONSTRUCTION, MAINTAIN A SET OF AS-BUILT REDLINED RECORD DRAWINGS AT THE PROJECT SITE. ALL CHANGES IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, AND ACCESSORIES SHALL BE RECORDED.
SHEET LIST
M1.0 MECHANICAL LEGEND AND NOTES
M1.1 MECHANICAL SCHEDULES
M2.1 BASEMENT MECHANICAL DEMOLITION PLAN
M2.2 LEVEL 1 MECHANICAL DEMOLITION PLAN
M2.3 LEVEL 2 MECHANICAL DEMOLITION PLAN
M3.1 BASEMENT MECHANICAL PLAN - NORTH
M3.2 BASEMENT MECHANICAL PLAN - SOUTH
M3.3 BASEMENT MECHANICAL PIPING PLAN
M3.4 LEVEL 1 MECHANICAL PLAN
M3.5 LEVEL 2 MECHANICAL PLAN
M3.6 LEVEL 2 MECHANICAL PIPING PLAN AND SECTIONS
M4.1 MECHANICAL PIPING SCHEMATIC
M4.2 MECHANICAL DETAILS
DEMOLISH
REPLACE
2
2 IB-1 07.24.2020
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N. 11, 2 0 0 5
RE
GIS
T ERED PROF ESSION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
This
docu
ment,
and t
he id
eas a
nd de
signs
inco
rpor
ated h
erein
, as a
n ins
trume
nt of
profe
ssion
al se
rvice
, is th
e pro
perty
of K
istler
Sma
ll + W
hite A
rchite
cts an
d is n
ot to
be us
ed, in
who
le or
in pa
rt, fo
r any
othe
r pro
ject w
ithou
t the
writt
en au
thoriz
ation
of Ki
stler
Sma
ll + W
hite A
rchite
cts.
Copy
write
2016
Kist
ler S
mall +
Whit
e Arch
itects
, LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
7/2
8/2
020
10:4
8:0
7 A
M
M1.1
02.13.2020
1905
PHASE 2BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
MECHANICALSCHEDULES
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2
3
3
2 IB-1 07.24.20203 IB-2 07.24.2020
2
2
FD
FD
1
D
2 1195 6 7 843
C
A
E
F
G
H
I
10 12
J
BDEMO STM & CR FROM FLOOR LEVEL TO 2ND LEVEL ATTIC
FLOOR MOUNTED STEAM HEATERS WERE REMOVED IN THE PREVIOUS PHASE. REMOVE ALL REMAINING EXPOSED PIPING AND CAP BELOW FLOOR LEVEL. TYPICAL, 13 PLACES.
STM AND CR OFFSET IN CEILING
CWS, CWR, STM, AND CR UP
CWS & CWR UP TO ROOF TO REMAIN
(E) 4” STM (NEAR FLR) AND 1-1/2” PUMPED CR TO REMAIN
(E) 4" CWS & CWR TO REMAIN
(E) STM & CR TO REMAIN
1 1/2" PUMPED CR TO REMAIN
2
M2.1
REMOVE AND REPLACE 4" STM AND 1-1/2" PUMPED CR IN THIS AREA AS REQUIRED FOR INSTALLATION OF SHOTCRETE
DEMO STEAM MANIFOLD
DEMO STM AND CR TO ROOF
2
3
1-1/2" PUMPED CR TO REMAIN
REPLACE TRAP AND STRAINER OFF STEAM MAIN DRIP LEG
STEAM MAIN DRIP LEG TO REMAIN
STEAM MAIN FROM ADJACENT MECHANICAL SUPPORT ROOM
DEMOLISH STEAM MANIFOLD
DEMO GRAVITY CONDENSATE FROM (E) AC-1
DUCTWORK DEMO'D IN 1ST PHASE
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N. 11, 2 0 0 5
RE
GIS
T ERED PROF ESSION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
This
docu
ment,
and t
he id
eas a
nd de
signs
inco
rpor
ated h
erein
, as a
n ins
trume
nt of
profe
ssion
al se
rvice
, is th
e pro
perty
of K
istler
Sma
ll + W
hite A
rchite
cts an
d is n
ot to
be us
ed, in
who
le or
in pa
rt, fo
r any
othe
r pro
ject w
ithou
t the
writt
en au
thoriz
ation
of Ki
stler
Sma
ll + W
hite A
rchite
cts.
Copy
write
2016
Kist
ler S
mall +
Whit
e Arch
itects
, LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
7/2
8/2
020
10:4
8:0
9 A
M
M2.1
02.13.2020
1905
PHASE 2BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
BASEMENTMECHANICAL
DEMOLITION PLAN
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2
1/8" = 1'-0"1
BASEMENT MECHANICAL DEMOLITION PLAN
SHEET NOTES
A. EXISTING INTERIOR PIPING, EQUIPMENT, AND DUCTWORK HAS BEEN LOCATED IN AN APPROXIMATE WAY ONLY. FIELD VERIFY LOCATION AND SIZE OF ALL EXISTING DUCTWORK, PIPING AND EQUIPMENT.
B. ABBREVIATIONS:STM STEAMCR STEAM CONDENSATE RETURNCWS CHILLED WATER SUPPLYCWR CHILLED WATER RETURN
POINT OF DEMOLITION. REMOVE PIPE FROM THIS POINT.
NOT TO SCALE2
STEAM MANIFOLD
2 IB-1 07.24.20203 IB-2 07.24.2020
1
D
2 1195 6 7 843
C
E
F
G
H
I
10 12
J
K
B
1 2 3 4 5 6 7 8 9 10 11 12
B
C
D
E
F
G
H
I
J
K
DEMOLISH EXHAUST DUCT AND FAN ON ROOF ABOVE
DEMOLISH EXHAUST DUCT AND FAN ON ROOF ABOVE
DEMO STM & CR
DEMO STM & CR
(E)CWS & CWR TO REMAIN
(E)1-1/2" CWS & CWR TO REMAIN
REMOVE ALL DUCTWORK IN THIS AREA.
REMOVE BRANCH DUCT INTO LOBBY FROM AHU-4. CAP DUCT.
2
3
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N. 11, 2 0 0 5
RE
GIS
T ERED PROF ESSION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
This
docu
ment,
and t
he id
eas a
nd de
signs
inco
rpor
ated h
erein
, as a
n ins
trume
nt of
profe
ssion
al se
rvice
, is th
e pro
perty
of K
istler
Sma
ll + W
hite A
rchite
cts an
d is n
ot to
be us
ed, in
who
le or
in pa
rt, fo
r any
othe
r pro
ject w
ithou
t the
writt
en au
thoriz
ation
of Ki
stler
Sma
ll + W
hite A
rchite
cts.
Copy
write
2016
Kist
ler S
mall +
Whit
e Arch
itects
, LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
7/2
8/2
020
10:4
8:1
1 A
M
M2.2
02.13.2020
1905
PHASE 2BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
LEVEL 1MECHANICAL
DEMOLITION PLAN
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2
1/8" = 1'-0"1
LEVEL 1 MECHANICAL DEMOLITION PLAN
SHEET NOTES
A. EXISTING INTERIOR PIPING, EQUIPMENT, AND DUCTWORK HAS BEEN LOCATED IN AN APPROXIMATE WAY ONLY. FIELD VERIFY LOCATION AND SIZE OF ALL EXISTING DUCTWORK, PIPING AND EQUIPMENT.
B. ABBREVIATIONS:STM STEAMCR STEAM CONDENSATE RETURNCWS CHILLED WATER SUPPLYCWR CHILLED WATER RETURN
POINT OF DEMOLITION. REMOVE PIPE OR DUCT FROM THIS POINT.
2 IB-1 07.24.20203 IB-2 07.24.2020
D
5 6 7 843
C
B
3 4 5 6 7 8
B
C
D
BASE BID. REMOVE (E) EXH FANAND CAP CURB.
BASE BID. REMOVE (E) EXH FANAND REPLACE WITH NEW.SEE M3.5.
60x20 DEMO ALL HATCHED
DUCTWORK
36x30
36x18
DEMO SIDEWALL RETURN GRILLE AND BRANCH DUCT ON BACK WALL OF STAGE,
TYP OF 2.
DEMO RETURN FAN AND DUCTWORK
DEMO FAN COIL.
DEMO DUCT MOUNTED COOLING COIL.
DEMO FAN COIL AND DUCTWORK
(E) LOUVER TO REMAIN, DEMO ALL CONNECTED DUCTWORK IN ATTIC
(E) LOUVER TO REMAIN. DEMO RELIEF DUCTWORK IN ATTIC. LOWER EXHAUST DUCTWORK TO REMAIN.(E) EXH FAN (F-10) AND
DUCTWORK TO REMAIN
DEMO (E) FAN COIL, BRANCH PIPING AND ALL ASSOCIATED DUCTWORK. (PREVIOUSLY ABANDONED IN PLACE)
DEMO ALL STEAM AND CONDENSATE PIPING FROM BASEMENT TO COIL CONNECTIONS IN ATTIC
DEMO DUCT MNT COOLING COIL.
DEMO SUPPLY AND EXHAUST GRILLES IN RESTROOMS, TYP.
DEMO BRANCH EA DUCT AND GRILLE
2
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N. 11, 2 0 0 5
RE
GIS
T ERED PROF ESSION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
This
docu
ment,
and t
he id
eas a
nd de
signs
inco
rpor
ated h
erein
, as a
n ins
trume
nt of
profe
ssion
al se
rvice
, is th
e pro
perty
of K
istler
Sma
ll + W
hite A
rchite
cts an
d is n
ot to
be us
ed, in
who
le or
in pa
rt, fo
r any
othe
r pro
ject w
ithou
t the
writt
en au
thoriz
ation
of Ki
stler
Sma
ll + W
hite A
rchite
cts.
Copy
write
2016
Kist
ler S
mall +
Whit
e Arch
itects
, LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
7/2
8/2
020
10:4
8:1
2 A
M
M2.3
02.13.2020
1905
PHASE 2BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
LEVEL 2MECHANICAL
DEMOLITION PLAN
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2
1/4" = 1'-0"1
LEVEL 2 MECHANICAL DEMOLITION PLAN
SHEET NOTES
A. FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING DUCTWORK, PIPING AND EQUIPMENT.
B. DEMOLISH ALL HATCHED DUCTWORK AND EQUIPMENT. SEE SHEET M3.5 FOR NEW WORK.
2 IB-1 07.24.2020
1
D
2 1195 6 7 843
C
A
E
F
G
10 12
B
2
M3.1
6
M3.2
2
M3.3
FRESH AIR INTAKE LOUVER IN PLACE OF WINDOW
36x34 RELIEF LOUVER
40x14
32x16
32x34 RELIEF LOUVER INSAME LOCATION AS(E) 32x12 INTAKE LOUVER20x20
BOD: 8' - 0"
VV-21
VV-22
AH-2
VV-23
(F)VV
VV-11
VV-12
VV-14
VV-15
VV-16
VV-32
VV-31
(F)VV
(F)VV
AH-3
20x12
28x12
20x8
16x10
15x10
10"ø
24x16
22x18
14x10
16x10
10x8
14x10
12x10
20x24
20x22
20x22
10x10 1
4x12
8x8
12x1010"ø
10x8
6"ø
4"ø
12x10
L-2
L-4
20x12
14x10
(E) 10x8 DUCT
DEBRIEF
038
OFFICE
003
DEBRIEF
004
LOBBY
001
SKILLS LAB
021
HALL
032
LARGE
CLASSROOM
036CHRNC SIM.
THEATER
031
CONTROL
ROOM
030
PROVIDER'S
OFFICE
029
ACTOR STOR.
/ CHANGE
025
SKILLS
STORAGE
026
WOMEN'S RR
010
MEN'S RR
009
FACULTY
LOUNGE
008
STUDENT
LOUNGE
007
JAN.
005
HALL
002
OFFICE
040
OFFICE
039
SIM. PREP. /
STOR.
020
MANQ'N.
STOR.
019
4" DN TO CLOTHES DRYER
IDF
037
AC-1
16"ø
7"ø
7"ø
7"ø
8x12
7"ø
7"ø
7"ø
6"ø
10x8
7"ø
10x8
6"ø
SG-1
80
SG-1
130
14x8
18x8
6"ø
SG-2
220
SG-2
220
SG-2
160
SG-1
100
SG-2
220SG-2
220
SG-2
220
SG-2
220
SG-1
155
SG-2
215
RG-6
350
(E)RG
350
SG-1
145
SG-1
120
6x10
6x10
6x10
SG-2
210
16x9
6"ø
4"ø
4"ø
8x6
15x6
SG-4
200
SG-4
200
SG-1
120
6"ø
10"ø
10x10
20x16
12x18
12x8
12x8
6"ø
20x20
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
RG-3
VV-13
32x16
ACUTE SIM. THEATER
014
AC
UT
E S
IM. T
HE
AT
ER
016
CONTROL ROOM
015
(2)
6"ø
20x8
10x10
16x10
14x14
5
M3.2
4
M3.2
ALTERNATE 2: VV-16 AND ALL DOWNSTREAM SUPPLY DUCT
AND DIFFUSERS
RG-4 RG-4
ALTERNATE 3
20x12
7"ø
NEW SHOTCRETE WALL. COORDINATE PENETRATIONS WITH
STRUCTURAL DRAWINGS.
NEW SHOTCRETE WALL, TYP. COORDINATE PENETRATIONS
WITH STRUCTURAL DRAWINGS.
3
M3.1
9x8
8"ø
6"ø
6"ø
14x8
9x8
8"ø
8x10
8x6
8x6
VV-33
14x8 RA CAPPED
RG-2
RG-1
RG-1
RG-1 10x10
18x10
RG-1
RG-3
RG-1
RG-1
RG-1
RG-3
RG-1
RG-1
RG-7
RG-6
RG-4
RG-4
RG-4
CAP FOR FUTURE
CAP FOR FUTURE
UP BETWEEN FLR JOISTS, TYP
UP BETWEEN FLR JOISTS, TYP
ENLARGE (E) OPENING FOR NEW DUCT
22x10
SG-14
400
12x10
SUPPLY GRILLE ON SIDE OF EXPOSED DUCT
20"ø
20"ø
12"ø
12x12
10x4
ø6
8"ø
10x12
8"ø
18x18
HEAT EXCHANGER AND PUMPS
SEE MECH PIPING PLAN
SIDEWALL RETURN FOR FUTURE T.I., TYP.
L-1
RG-5SG-11
295(2)
FC-1
SG-10
200
SG-10
200
10"ø
SG-9
30
EG-1
50
5"ø
8"ø
10x10
EG-3
210
EG-3
210
SG-6
100
SG-6
100
SG-10
110
18x6
16x6
10x10
10"ø
(2)
SG-5
265(2)
SG-5
265
12"ø
SG-3
575
6"ø
6"ø
8"ø
8"ø
6"ø
6"ø
6"ø
6"ø CAP FOR FUTURE
DEF-1
10"ø
SG-16
210
SG-16
125
RG-1
(2)ROUND MITERED ELBOWS
(2)
SG-9
60
SG-10
120
SG-9
30
SG-15
50
6"ø
16x10
12x1018x6
6"ø FRESH AIR DUCT TO SEIHO MODEL SFX 6
WALL CAP
5"ø
8"ø
6"ø
8"ø
7"ø
6"ø
6"øSG-6
50
SG-6
50
MEDS
017
CLN SPL
018
SG-12
90
SG-12
95
SG-12
95
10x6
26x14
22x22
18x10
8"ø
6x8
6x8
SG-10
270
RG-4
16x106"ø
12x10
RG-6
18x10
16x10
10x8RG-4
SG-17
530
SG-17
530
VV-24
8"ø
18x10
30x12 DN TO LOW RETURN
6x10
14x12
15x10
8x8
8x6
6"ø
SG-12
110
1
2
3
4
5
6
7
2
3
8
8
3
9
7
10
2
11
2 2
/1 M3.2
BASE BID
ALTERNATE 1
9 5678 4 33456789
3
M3.1
20x1012x10 20x16
7"ø
18x8
10x12
12x12
6"ø 8"ø 6"ø 18x8 10x48"ø 10x1220"ø 20"ø
RG-3 RG-3
1-1/2" HWHS & HWHR
3/4" HWHS & HWHR
3/4" HWHS & HWHR 1-1/2" HWHS & HWHR
16x618x6 12x10
CB
2
M3.1
B C
VV-32
10"ø6x1812"ø
SG-16
2101-1/2" HWHS & HWHR
OFFSET DUCT DN TO RUN THRU OPENING. OFFSET ADJACENT RETURN DUCT SIMILARLY.
10x10
DEBRIEF
004
HALL
002
(E) 4" STM AND COND IN THIS AREA
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N . 11, 2 0 0 5
RE
GIS
T ERED PROF ESS ION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
Thi
s do
cum
ent,
and
the
idea
s an
d de
sign
s in
corp
orat
ed h
erei
n, a
s an
inst
rum
ent o
f pr
ofes
sion
al s
ervi
ce, i
s th
e pr
oper
ty o
f Kis
tler
Sm
all +
Whi
te A
rchi
tect
s an
d is
not
to
be u
sed,
in w
hole
or
in p
art,
for
any
othe
r pr
ojec
t w
ithou
t th
e w
ritte
n au
thor
izat
ion
of K
istle
r S
mal
l + W
hite
Arc
hite
cts.
Cop
ywrit
e 20
16 K
istle
r S
mal
l + W
hite
Arc
hite
cts,
LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
2/1
9/2
020
3:3
3:1
9 P
M
M3.1
02.13.2020
1905
BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
BASEMENTMECHANICAL PLAN -
NORTH
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2
3/16" = 1'-0"1
BASEMENT MECHANICAL PLAN - NORTH
KEYED NOTES
3/16" = 1'-0"2
BASEMENT SECTION - GRIDLINE C (ALTERNATE 1) 3/16" = 1'-0"3
VV-32 SECTION (ALTERNATE 1)
1 SIDEWALL DUCTLESS SPLIT SYSTEM FAN COIL. CONNECT TO CONDENSING UNITON LEVEL 1 ROOF. COORDINATE LOCATION WITH SOU I.T. DEPARTMENT.COORDINATE INSTALL OF REFRIGERANT LINES WITH STRUCTURAL WORK ONFLOOR ABOVE.
2 EXPOSED DUCT.
3 DUCT IN SOFFIT.
4 DUCT RUNS BETWEEN WIDE FLANGE (WF) BEAMS.BRANCH DUCTS TO DIFFUSERSOFF TOP OF 14x12, OVER WF BEAMS AND BETWEEN FLOOR JOISTS.
5 DUCT UP TO RUN BETWEEN FLOOR JOISTS, TYP.
6 PROVIDE 4"ø DRYER EXHAUST DUCT OUT THROUGH WALL TO CAP. COORDINATELOCATION WITH ARCHITECT.
7 SUPPLY AIR GRILLE ON SIDE OF EXPOSED DUCT, TYP.
8 SUPPLY GRILLE IN SIDEWALL OF SOFFIT, TYP.
9 EXHAUST DUCT UP TO FAN ON ROOF.
10 POINT OF CONNECTION, TYP. FIELD VERIFY SIZE AND LOCATION OF EXISTINGDUCT/PIPE.
11 TRANSITION TO 20x16, DROP IN EXISTING OPENING, AND OFFSET INTO CHASE.SEE 6/M3.2.
SHEET NOTES
A. WITH THE EXCEPTION OF RESTROOMS 009 AND 010, ALL WORK ON THIS SHEET IS PART OF ALTERNATES 1, 2, OR 3. EXTEND SUPPLY DUCTS FROM RESTROOM DIFFUSERS OUT INTO HALLWAY FOR FUTURE CONNECTION.
1 2 1195 6 7 843
G
H
I
10 12
J
6
M3.2
2
M3.2
32x30 FRESH AIRINTAKE LOUVER
20x20 10
' -
0"
(F)VV(F)VV
20x16
20x26
RF-1
AH-1
(E) 52x36 FRESH AIR DUCT OUT TO LOUVER
(E)66x36 RELIEF DUCT OUT TO LOUVER
DUCT UP TO 1ST FLR, TYP OF 4 PLACES
SIDEWALL RETURN FOR FUTURE T.I., TYP.
L-3
L-4
12x8
16x16
26x26
16x16
24x24
1 2 3 4 5 6 7 8 9 10 11 12
G
H
I
J
3
M3.2
8x6
RG-4
RG-4
NEW SHOTCRETE WALL. COORDINATE PENETRATIONS WITH
STRUCTURAL DRAWINGS.
MIN
. B
ET
WE
EN
LO
UV
ER
S
SG-13
100
1 1
2
40x18 RA UP
18x14 SA UP
16x16 SA UP
/1 M3.1
3
3
ALTERNATE 1
ALTERNATE 1
BASE BID
HH
RF-1
42x42
42x42
34x34
16x16
26x26
24x24
40x18 RA DN FROM LVL 1
MOTORIZED DAMPER
RELIEF AIR
TO AH-1SAME SIZE AS AH-1 RA OPENINGINSTALL MOTORIZED DAMPER
HI
31x33 16x20
30x20
16x16
16x16
AH-1
SUPPLY FAN SECTION (FRONT AND TOP DISCHARGE)
COOLING COIL
ACCESS SECTION
MIXING SECTION WITH FILTERS (OA TOP, RA SIDE)
HEATING COIL(S)
ACCESS SECTION
UP THRU (E) FLOOR OPENINGS
OA
SA
RA
SA
BASE BID ALTERNATE 1
DC E
2
M3.3
C D E
AH-2
14x26
30x12
26x18
28x14
16x32
18x26
16x10 BEYOND
TO 30x30 RETURN GRILLE
40x146x8 8x8
10x15
8"øVV-22
14x12
VV-21
ø6 8"ø VV-24
TO 18x10 SUPPLY GRILLE
TO 18x10 SUPPLY GRILLE
22x22
SG-12
110
10x10
SUPPLY FAN SECTIONTOP DISCHARGE
ACCESS SECTION
COOLING COIL
RETURN FAN SECTIONBACK RETURN, TOP RELIEF
MIXING SECTION WITH FILTERSTOP OAHEATING COIL
STORAGE
034
COPY / WORK / MED.
PREP.
033
HALL-1
032-1
FF
14x14
16x20
24x16
20x20
22x22
16"ø10x14
AH-3
RETURN FAN SECTION (BACK RA, TOP RELIEF)
MIXING BOX WITH FILTERS (TOP OA)
HEATING COIL
COOLING COIL
SUPPLY FANTOP DISCHARGE
ACCESS SECTION
DC E F G H I2
M3.1
2
M3.3
C D E F G H I
AH-116x20
30x2026x20
16x16
24x2022x20
6"ø
12"ø
20x22
7"ø
20"ø
16x2
0
12x107"ø 22x10 6"ø 12x8 12x8 12x8 12x8 12x818x18
8x12
12x18
16x1624x24
OFFSET DOWN IN (E) OPENING
10x20
1-1/2" HWHS & HWHR
1-1/4" CWS & CWR
2" HWHS & 1" HWHR
2" HWHR3/4" HWHS & HWHR
OA
FROM RF-1
BASE BIDALTERNATE 1
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N . 11, 2 0 0 5
RE
GIS
T ERED PROF ESS ION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
Thi
s do
cum
ent,
and
the
idea
s an
d de
sign
s in
corp
orat
ed h
erei
n, a
s an
inst
rum
ent o
f pr
ofes
sion
al s
ervi
ce, i
s th
e pr
oper
ty o
f Kis
tler
Sm
all +
Whi
te A
rchi
tect
s an
d is
not
to
be u
sed,
in w
hole
or
in p
art,
for
any
othe
r pr
ojec
t w
ithou
t th
e w
ritte
n au
thor
izat
ion
of K
istle
r S
mal
l + W
hite
Arc
hite
cts.
Cop
ywrit
e 20
16 K
istle
r S
mal
l + W
hite
Arc
hite
cts,
LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
2/1
9/2
020
9:2
6:2
8 A
M
M3.2
02.13.2020
1905
BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
BASEMENTMECHANICAL PLAN -
SOUTH
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2
3/16" = 1'-0"1
BASEMENT MECHANICAL PLAN - SOUTH
1/4" = 1'-0"3
RF-1 SECTION1/4" = 1'-0"
2AH-1 SECTION
1/4" = 1'-0"4
AH-2 SECTION (ALTERNATE 1)1/4" = 1'-0"
5AH-3 SECTION (ALTERNATE 1)
3/16" = 1'-0"6
BASEMENT SECTION - NORTH/SOUTH
KEYED NOTES
1 POINT OF CONNECTION, TYP. FIELD VERIFY SIZE AND LOCATION OF EXISTINGDUCT/PIPE.
2 SUPPLY GRILLE ON END OF EXPOSED DUCT.
3 INSTALL MODULATING CONTROL DAMPERS IN RELIEF AIR AND RETURN AIR DUCTS
T
T
T
T
T
T
T
T
T
T
T
T
T
1
D
2 1195 6 7 843
C
A
E
F
G
H
I
10 12
J
B2
M3.1
6
M3.2
2
M3.3
AH-3
AH-2
(F)VV(F)VV
VV-31
VV-32
VV-14VV-12
VV-11
VV-22
VV-21
VV-23
(F)VV
VV-16
VV-15
AH-1
PROVIDE NEW FLOW METERS IN (E) 4" CWS, 4" STM, AND 1-1/2" PUMPED CR LINES.
VV-13
1-1/4" CWS/CWR
(E) CWS/CWR
ALTERNATE 3
ALTERNATE 2
CAP
CONNECT TO (E) CWS/CWR
2"ø 3"ø
2"ø
3/4"ø
2"ø
1"ø
2"ø
2"ø
1"ø
1 1/2"ø
1 1/2"ø
1 1/2"ø
1 1/4"ø
1 1/2"ø
1"ø
1 1/2"ø1 1/4"ø
3/4"ø
2"ø
2"ø
1-1/4" CWS & CWR AND 1" HWHS & HWHR TO AH-2
NO REHEAT COIL AT VV-24
1 1/2"ø
1 1/4"ø
1"ø
3/4"ø
3/4"ø
VV-33
3/4"ø3/4"ø
1 1/2"ø1 1/2"ø
1 1/2"ø1 1/4"ø
1 1/2"ø
DN TO BELOW SA DUCT
OFFICE
003
LOBBY
001
OFFICE
040
OFFICE
039DEBRIEF
038
LARGE
CLASSROOM
036
IDF
037
HALL
032
CHRNC SIM.
THEATER
031
DEBRIEF
004
JAN.
005
HALL
002
STUDENT
LOUNGE
007FACULTY
LOUNGE
008
MEN'S RR
009
WOMEN'S RR
010
ACUTE SIM.
THEATER
016
CONTROL
ROOM
015
ACUTE SIM.
THEATER
014
PROVIDER'S
OFFICE
029
MECH.
035
STAIR 1
041
HALL
006
MEDS
017
CLN SPL
018
PIPING DROPS TO RUN BELOW DUCTWORK
CAP FOR FUTURE
1 1/4"ø
PIPES CROSS OVER BEAM
PIPES BETWEEN FLOOR JOISTS
3"ø INSTALL NEW 4" STM & 1-1/2" CR AFTER SHOTCRETE IS INSTALLED.OFFSET AS REQUIRED.
1-1/2" TO AH-1 HEATING COIL
FC-1
3/4" HWHS & HWHR
3/4" CWS & CWR
HW
HS
HW
HR
HW
HS
HW
HR
HW
HR
CWSCWR
HWHRHWHS
HW
HS
HW
HR
VV-24HWHS, HWHR, CWS, & CWR PIPING TO FC-1 IS PART OF ALTERNATE 3
HX-1
4"ø
1 1/4"ø2"ø
ET-1
P-1
P-2
(F)P-3
1
2
3
BASE BIDALTERNATE 1
ALT
ER
NA
TE
1B
AS
E B
ID
CAP STM AND CR
3
1 2 536
M3.21 2 3 4 5 6 7
4
M3.2
22x20
14x40
L-1
AH-2
16x108"ø 10"ø
12x8
20x1212x1832x16 18x10 10x1012x8 18x18 TO 20"ø
18x12 TO 20"ø
12"ø
20x22
14x10
1-1/4" CHS & CHR1" HWHS2" HWHR
1-1/4" CHS & CHR
3/4" HWHS& HWHR
CONNECT TO (E) 2" CHS/CHR IN CORRIDOR
18x26
32x16
10x16 BEYOND
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N. 11, 2 0 0 5
RE
GIS
T ERED PROF ESSION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
This
docu
ment,
and t
he id
eas a
nd de
signs
inco
rpor
ated h
erein
, as a
n ins
trume
nt of
profe
ssion
al se
rvice
, is th
e pro
perty
of K
istler
Sma
ll + W
hite A
rchite
cts an
d is n
ot to
be us
ed, in
who
le or
in pa
rt, fo
r any
othe
r pro
ject w
ithou
t the
writt
en au
thoriz
ation
of Ki
stler
Sma
ll + W
hite A
rchite
cts.
Copy
write
2016
Kist
ler S
mall +
Whit
e Arch
itects
, LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
7/2
8/2
020
10:4
8:1
6 A
M
M3.3
02.13.2020
1905
PHASE 2BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
BASEMENTMECHANICALPIPING PLAN
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2
1/8" = 1'-0"1
BASEMENT MECHANICAL PIPING PLAN
3/16" = 1'-0"2
BASEMENT SECTION - GRIDLINE E (ALTERNATE 1)
SHEET NOTES
KEYED NOTES
A. OTHER THAN THE LOWER RIGHT HAND CORNER, ALL WORK ON THIS SHEET IS PART ALTERNATES 1, 2, OR 3.
B. SEE PIPING SCHEMATIC ON SHEET M4.1 FOR PIPING CONNECTION DETAILS FOR HEAT EXCHANGER, PUMPS, EXPANSION TANK, AIR SEPARATOR, HEATING AND COOLIING COILS, ETC.
C. COORDINATE CONDENSATE DRAIN PIPING WITH PLUMBING CONTRACTOR.
D. NEW STEAM, PUMPED CONDENSATE, AND CHILLED WATER FLOW METERS SHALL BE PROVIDED BY THE CONTROLS CONTRACTOR (SEE SECTION 23 09 23)AND INSTALLED BY THE MECHANICAL CONTRACTOR. INSTALL PER MANUFACTURER'S INSTRUCTIONS WITH RECOMMENDED UP AND DOWN STREAM CLEARANCES, ECCENTRIC REDUCERS, FLOW STRAIGHTENERS, ETC. AS REQUIRED. CONTRACTOR TO FIELD VERIFY EXACT LOCATIONS FOR NEW METERS.
1 CONNECT CONDENSATE FROM HX-1 TO EXISTING BELOW GRADE CONDENSATERETURN TANK.
2 AIR SEPARATOR IN THIS AREA. SEE EXPANSION TANK SCHEDULE FOR SIZE.
3 3" HWHS & HWHR UP IN (E) CHASE. PROVIDE ISOLATION VALVES ON PIPING RISINGTO LEVEL 1. PROVIDE DRAIN DOWN VALVES WITH HOSE CONNECTIONS.
3 IB-2 07.24.2020
FD
FD
T
T
T
T
1
D
2 1195 6 7 843
C
E
F
G
H
I
10 12
J
K
B
VV-17
VV-18
3" HWS/HWR REHEAT PIPING DN TO MECH ROOM
16"ø
1 2 3 4 5 6 7 8 9 10 11 12
B
C
D
E
F
G
H
I
J
K
16x16 SA DUCT DN TO BASEMENT.
CAP DUCT FOR FUTURE.
16x16 SA DUCT DN TO BASEMENT.
14x18 SA DN TO BASEMENT
40x18 RA DN TO BASEMENT
20x15
20x15
20x15
20x15
SG-8
500(4)
SG-8
400(4)
DIFFUSER ON BOTTOM OF EXPOSED DUCT, TYP.
(E) 14x14 14x8
6"ø
8"ø
8"ø
EG-3
210
EG-3
210
EG-2
709x6
SG-7
200
3/4"ø
2 1/2"ø
2"ø
2"ø
2"ø
3/4"ø
CAP FOR FUTURE
3/4" CAPPED TEES FOR FUTURE
2"ø
3/4" CAPPED TEES FOR FUTURE
CAP
UP TO (E)F-4
(E) SA FROM MZ-3
CAP
UNFINISHED
ROOM
150
WOMEN RR
123
MEN RR
121
HALL
104
8x10
12"ø 1
6"ø
SG-7
400
10x10 EA FROM BASEMENT RESTROOMS CONTINUES UP THROUGH ROOF TO NEW EXH FAN F-8
CAP
BRANCH OFF TOP OF MAIN TO RUN BETWEEN FLOOR JOISTS, TYP.
SG-10
200
CAP
CEILINGS IN THIS AREA TO BE REMOVED AND REPLACED. SEE SHEET NOTES.
CEILINGS IN THIS AREA TO BE REMOVED AND REPLACED. SEE SHEET NOTES.
HW
HR
HW
HS
HWHRHWHS
HWHR
HWHS
(E)SG
335
(E)SG
335
(E)SG
335
(E)SG
280
(E)SG
175
(E)SG
210
(E)SG
225
(E)SG
225
(E)SG
225
(E)SG
225
(E)SG
315
(E)SG
200
(E)SG
275
(E)SG
275
(E)SG
250
(E)SG
250
(E)SG
250
(E)SG
165
(E)SG
105
(E)SG
165
(E)SG
165
(E)SG
400(E)SG
100
(E)SG
275
(E)SG
275
(E)SG
300
(E)SG
300
(E)SG
200
(E)SG
200
(E)SG
300
(E)SG
300
(E)SG
300
(E)SG
100
(E)SG
300
(E)SG
300
(E)SG
300
(E)SG
100
(E)SG
400
(E)SG
400
(E)SG
300
(E)SG
300
2"ø
2"ø
BALL VALVE, TYP.
SG-10
200
(E)10x6
RG-4
EG-3
CONNECT SIDEWALL GRILLE IN CORRIDOR WITH CEILING GRILLE IN TOILET ROOM FOR TRANSFER AIR, TYP OF 2 PLACES
RG-4 EG-3
OPEN END RETURN AT BOTTOM OF STRUCTURE
OFFICE
141 OFFICE
140
HALL
145
OFFICE
139
OFFICE
138
OFFICE
142
WORK ROOM
143
OFFICE
137
OFFICE
136WAITING
144
LOBBY
103
HALL
102
SG-18
400
SG-2
205SG-1
140
SG-1
150
SG-1
85
SG-2
210
SG-18
300
SG-2
200
SG-18
300
SG-2
225
SG-1
85
SG-1
90
SG-6
115
SG-6
115
RG-1
RG-1
RG-1
RG-1
RG-1
RG-1
RG-1
RG-1
RG-1
RG-1
24x14 18x14
14x14
12"ø
28x10
24x10
16x12
18x14
14x14
14x12
12"ø
12"ø
12x10
14"ø
12"ø
10"ø
8"ø
6"ø
6"ø
8"ø
6"ø
6"ø6"
ø
6"ø
8"ø
8"ø
14x10
10"ø
6"ø
7"ø
10"ø
12x8
8"ø
UP TO LEVEL 2
NEW SHOTCRETE WALL, TYP.
UP INTO CLOSET ON LEVEL 2.CORE DRILL WALL AT GRID LINE 8 TO
ACCESS ATTIC ABOVE THE EAST WINGVV-52
VV-53
VV-51
VV-54
12"ø
10"ø
8"ø
6"ø
6"ø
8"ø
10"ø
8"ø
10"ø
8"ø
9"ø
8"ø
8"ø
12x8
1
2
3
4
3
2
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N. 11, 2 0 0 5
RE
GIS
T ERED PROF ESSION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
This
docu
ment,
and t
he id
eas a
nd de
signs
inco
rpor
ated h
erein
, as a
n ins
trume
nt of
profe
ssion
al se
rvice
, is th
e pro
perty
of K
istler
Sma
ll + W
hite A
rchite
cts an
d is n
ot to
be us
ed, in
who
le or
in pa
rt, fo
r any
othe
r pro
ject w
ithou
t the
writt
en au
thoriz
ation
of Ki
stler
Sma
ll + W
hite A
rchite
cts.
Copy
write
2016
Kist
ler S
mall +
Whit
e Arch
itects
, LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
7/2
8/2
020
10:4
8:2
0 A
M
M3.4
02.13.2020
1905
PHASE 2BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
LEVEL 1MECHANICAL PLAN
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2
3/16" = 1'-0"1
LEVEL 1 MECHANICAL PLAN
SHEET NOTES
A. THE CEILINGS IN THE EAST AND WEST WINGS WERE REMOVED DURING PHASE 1 AND WILL BE REPLACED IN PHASE 2. THE CONTRACTOR SHALL RE-INSTALL THE GRILLES, REGISTERS, AND DIFFUSERS (GRD) IN THE NEW CEILING. PROVIDE NEW FLEXIBLE DUCT TO CONNECT TO THE (E) DUCTWORK. PROVIDE NEW MANUAL BALANCING DAMPERS WHERE (E) DUCT MOUNTED OR DIFFUSER MOUNTED DAMPERS ARE NOT PRESENT.
B. TEST AND BALANCE THE EXISTING HVAC SYSTEMS TO THE LISTED SUPPLY AIR VOLUMES (COPIED FROM THE EXISTING DRAWINGS).
C. COPIES OF THE EXISTING DRAWINGS ARE AVAILABLE FROM THE SOU FACILITIES PROJECT MANAGER.
KEYED NOTES
1 1-1/4" CWS & CWR AND 3/4" HWHS & HWHR UP TOAH-5.
2 3/4" HWHS & HWHR TO REHEAT COILS. INSTALL 3/4"TO EACH COIL.
3 CAP 2" HWHS & HWHR FOR FUTURE.
4 CONNECT TO (E) 1-1/2" CWS & CWR RISING UP FROMBASEMENT. FIELD VERIFY LOCATION.
2 IB-1 07.24.20203 IB-2 07.24.2020
FD
FD
1
D
2 1195 6 7 843
C
E
F
G
H
I
10 12
B
(E)EF-10
36x14
34x34
34x34
34x34
AH-4
FC-2
14x10
(E)RG
3750
(E)RG
3750
(E)6
0x20
RG-9
850
RG-8
750RG-8
750
(E)SG
150
(E)SG
150
(E)SG
150
AC-1ALTERNATE 1:
CONDENSING UNIT FOR BASEMENT IDF ROOM.COORDINATE INSTALLATION OF REFRIGERANT
LINESET WITH STRUCTURAL WORK ON FLOORSBELOW. 36x16
12x12
F-8
12x12
BASE BID.NEW EXH FAN FOR BASEMENT RESTROOMS. DEMO (E) FAN IN THIS LOCATION AND REPLACE WITH NEW.
SG-6
150
EG-3
250
SG-7
250
(E)EG
150
(E)EG
150
(E)EG
75CAP (E)
BRANCH
INSTALL FC-2 ON TOP OF SOUND LINED RETURN AIR PLENUM
1
(E)AHU-4
AH-5
EG-3
250
(E)EG
75
(E)EG
150
(E)EG
200
CONNECT DUCT TO EXISTING LOUVER
(E)SG
230
(E)SG
50
(E)SG
100
(E)SG
25
(E)SG
25
(E)SG
100
(E)SG
50
TYPICAL FOR HIGH CEILING AREAS
3
2
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N. 11, 2 0 0 5
RE
GIS
T ERED PROF ESSION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
This
docu
ment,
and t
he id
eas a
nd de
signs
inco
rpor
ated h
erein
, as a
n ins
trume
nt of
profe
ssion
al se
rvice
, is th
e pro
perty
of K
istler
Sma
ll + W
hite A
rchite
cts an
d is n
ot to
be us
ed, in
who
le or
in pa
rt, fo
r any
othe
r pro
ject w
ithou
t the
writt
en au
thoriz
ation
of Ki
stler
Sma
ll + W
hite A
rchite
cts.
Copy
write
2016
Kist
ler S
mall +
Whit
e Arch
itects
, LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
7/2
8/2
020
10:4
8:2
2 A
M
M3.5
02.13.2020
1905
PHASE 2BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
LEVEL 2MECHANICAL PLAN
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2
3/16" = 1'-0"1
LEVEL 2 MECHANICAL PLAN
SHEET NOTES
A. SEE SHEET M2.3 FOR 2ND LEVEL MECHANICAL DEMOLITION.
B. SEE SHEET M3.6 FOR 2ND LEVEL MECHANICAL PIPING AND SECTIONS.
C. TEST AND BALANCE ALL NEW AND EXISTING DIFFUSERS AND GRILLES SERVED BY (E)EF-10, AH-4 AND FC-2.
D. TEST AND BALANCE (E)EF-10 TO 1,300 CFM.
2
1 REVISION 1 02.07.20202 IB-1 07.24.20203 IB-2 07.24.2020
FD
FD
D
5 6 7 843
C
3 4 5 6 7 8
C
D
AH-4
FC-2
3/4" TO HEATINGAND COOLING COILS
2" HWS & HWR DN TO LEVEL 1
CONNECT TO (E) 2-1/2" CWS & CWR IN ATTIC
2"ø2"ø
(E) 2-1/2" CWS & CWR DN TO BASEMENT
3/4"ø3/4"ø
2"ø2"ø
CW
S
CW
R
5 644 5 6
AH-4
FC-2
34x34
34x34
34x34
14x36
24x41
14x10
20x2020x53
60x20
3
M3.6
12x12
12x12
RETURN AIR PLENUM BELOW FC-1
D CCD2
M3.6
AH-4
FC-2
10x14
41x24
34x34
12x12
20x60CONNECT TO (E) LOUVER
RG-8
750
RG-9
850
INSTALL FC-2 ON TOP OF SOUND LINED RETURN AIR PLENUM
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N. 11, 2 0 0 5
RE
GIS
T ERED PROF ESSION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
This
docu
ment,
and t
he id
eas a
nd de
signs
inco
rpor
ated h
erein
, as a
n ins
trume
nt of
profe
ssion
al se
rvice
, is th
e pro
perty
of K
istler
Sma
ll + W
hite A
rchite
cts an
d is n
ot to
be us
ed, in
who
le or
in pa
rt, fo
r any
othe
r pro
ject w
ithou
t the
writt
en au
thoriz
ation
of Ki
stler
Sma
ll + W
hite A
rchite
cts.
Copy
write
2016
Kist
ler S
mall +
Whit
e Arch
itects
, LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
7/2
8/2
020
10:4
8:2
4 A
M
M3.6
02.13.2020
1905
PHASE 2BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
LEVEL 2MECHANICAL
PIPING PLAN ANDSECTIONS
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2
1/4" = 1'-0"1
LEVEL 2 MECHANICAL PIPING PLAN
SHEET NOTES
1/4" = 1'-0"2
AH-4 SECTION1/4" = 1'-0"
3AH-4 CROSS SECTION
A. ALL WORK ON THIS SHEET IS ALTERNATE 3.
B. SEE SHEET M2.3 FOR LEVEL 2 MECH DEMOLITION.
C. SEE SHEET M3.5 FOR LEVEL 2 DUCTWORK.
2 IB-1 07.24.2020
2
NONE NONE
2-1/2"
PROVIDE 2-WAY VALVES ON ALL COILS EXCEPT THOSE NOTED ONSCHEDULE.
R
S
REDUCER, IF REQUIRED
WATER COIL
R
S
WATER COIL
PIPE HANGER SHALLSUPPORT PIPINGINDEPENDENT OFCOIL
TEST PLUG(TYP.)
2-WAY AUTOMATIC VALVE
AUTOMATIC BALANCEVALVE WITH TWO QUICKDISCONNECT FITTINGS
STRAINER WITHVALVE AND HOSECONNECTION
COIL WITH 2-WAY CONTROL VALVE
DRAIN WITHVALVE ANDHOSECONNECTION
UNION(TYP.)
PIPE HANGER SHALLSUPPORT PIPINGINDEPENDENT OFCOIL
TEST PLUG(TYP.)
UNION(TYP.)
AUTOMATIC BALANCEVALVE WITH TWO QUICKDISCONNECT FITTINGS
AUTOMATIC 3-WAY VALVE,SEE TERMINAL BOXSCHEDULE FOR GPM
DRAIN WITHVALVE AND HOSECONNECTION
STRAINER WITHVALVE AND HOSECONNECTION
COIL WITH 3-WAY CONTROL VALVE
2COIL PIPING CONNECTIONS
C
NO
NC
MANUAL AIR VENT AT ALLHIGH POINTS (TYP.).
BUTTERFLY VALVES, TYP. 2" AND SMALLER
USE BALL VALVES
MANUAL AIR VENT AT ALLHIGH POINTS (TYP.).
BUTTERFLY VALVES, TYP. 2" AND SMALLER
USE BALL VALVES
1PIPING SCHEMATIC
TO DRAIN
3/4" COLD WATERFILL LINE.
RPBFP W/DRAIN PAN
PRV
EXTEND LINE TO NEAREST DRAIN
3/4"
WATER METER.
12 PSIG STEAMFROM TUNNEL
M
ET
1
HEX
1
P
1P
2
P
3
TANK SADDLE
AIR CONTROL TANK FITTING
1" CONNECTOR PIPE
GAUGE GLASS
HANGER ROD SUPPORTS
EXPANSION TANK
FUNNEL
CONCRETE BASE
DRAIN
PUMP
MOTOR
TANK DRAINER-AIR CHARGER
3" HWS
3" HWR
1"
BALL VALVE (TYP.)3" HWS
0-200°F THERMOMETER (TYP.)
4"
3" HWS
HWS
HW
S
SEE PIPING DRAWINGS FORDETAILED PIPE ROUTING ANDSIZING TO HEATING COILS.
PITCH UP 1.6%SLOPE (MIN.)
NORMALLY OPENBALL VALVE INVERTICAL (REMOVEHANDLE)
CHEMICALPOT FEEDER
TO NEARESTFLOOR DRAIN
BLOW DOWN VALVE.EXTEND LINE TODRAIN
0-100 PSIG PRESSURE GAUGE WITHPIGTAIL & GAUGE COCK (TYP.)
SUCTION DIFFUSER WITHBUILT-IN STRAINER (TYP.)
FLEXIBLE CONNECTION (TYP.)
BUTTERFLY VALVE (TYP.)
BALANCING VALVE (TYP.)
HOSE CONNECTION (TYP.)
1" MIN. DIA. PIPE STAND (TYP.)
3/4"
3/4"
2-1/2"
3/4"
ECCENTRIC REDUCER(WHERE REQ'D.)
9" INDUSTRIAL THERMOMETERW/ COPPER WELL
STEAM TO WATER HEAT EXCHANGER(SHELL & U-TUBE TYPE)
GRAVITY RETURN TOVENTED RECEIVER
6" MINIMUMDIRT LEG
TO DRAIN
STRUCTURAL STEEL SUPPORT -FIELD FABRICATED
BLOWDOWN ASSEMBLY
TEST & PRESSURERELIEF SYSTEM
MINIMUM 2'STATIC HEAD
VACUUMBREAKER
HOSE-ENDED DRAINVALVE W/ CAP
1/2" TEST & PRESSURERELIEF SYSTEM
SWING CHECK VALVE
TODRAIN
HIGH CAPACITYF & T TRAP
TO DRAIN
TEMPERATURE SENSING POINT
MINIMUM 18"
6" MINIMUMDIRT LEG
GATE VALVE
2/3 VALVE
"H" STYLE F & T TRAP
TO DRAIN
GLOBE VALVE
CONTROL VALVE
1/3 VALVE
TO DRAINUNION
PRESSURE ANDTEMPERATURE PORT
10PIPEDIA.
TO DRAIN
2/3 LTUBE BUNDLE
REMOVAL AREA
TO DRAIN
MANUAL AIR VENT
P/T RELIEF VALVE
PRESSUREGAUGE
PIGTAIL SYPHON
NEEDLE VALVESTEAM RELIEF VALVE
3" HWS
4" STM
AIR SEPARATOR.SEE EXP TANKSCHEDULE FOR SIZE
2-1/2"
FUTURE. SEE SHEET NOTE A
L
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N . 11, 2 0 0 5
RE
GIS
T ERED PROF ESS ION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
Thi
s do
cum
ent,
and
the
idea
s an
d de
sign
s in
corp
orat
ed h
erei
n, a
s an
inst
rum
ent o
f pr
ofes
sion
al s
ervi
ce, i
s th
e pr
oper
ty o
f Kis
tler
Sm
all +
Whi
te A
rchi
tect
s an
d is
not
to
be u
sed,
in w
hole
or
in p
art,
for
any
othe
r pr
ojec
t w
ithou
t th
e w
ritte
n au
thor
izat
ion
of K
istle
r S
mal
l + W
hite
Arc
hite
cts.
Cop
ywrit
e 20
16 K
istle
r S
mal
l + W
hite
Arc
hite
cts,
LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
2/1
9/2
020
9:2
6:3
6 A
M
M4.1
02.13.2020
1905
BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
MECHANICALPIPING SCHEMATIC
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2
SHEET NOTES
A. PUMP SIZING / DESGIN INTENT: THE TWO PUMPS SHALL OPERATE IN A LEAD / STANDBY MODE WITH 100% REDUNDANCY. WHEN THE REMAINING STEAM HEAT AIR HANDLERS ARE CONVERTED TO HOT WATER HEATING, A THIRD PUMP WILL BE ADDED AND THE PUMPS WILL OPERATE IN A LEAD/LAG/STANDBY MODE WITH 50% REDUNDANCY.
B. THE STEAM TO HOT WATER CONVERTOR IS SIZED TO PROVIDE HEATING HOT WATER TO THE ENTIRE BUILDING. iT INCLUDES CAPACITY FOR THE FUTURE CONVERSION OF THE REMAINING STEAM AIR HANDLERS TO HOT WATER HEAT.
C. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE FIRST 2 HANGERS FOR EACH PIPE SHALL BE SPRING & NEOPRENE TYPE.
D. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE OF ACCESS DOORS OR PANELS: NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS, VALVES, OR EQUIPMENT.
E. SEE EXPANSION TANK SYSTEM SCHEDULE FOR COMPONENT SIZES.
F. PROVIDE UNIONS FOR THE REMOVAL OF VALVES WITH SCREWED CONNECTIONS.
MANUAL BALANCING DAMPER
NTS
NTS NTS
NTS
NTS
NTS
6LOW PRESSURE DUCT CONSTRUCTION DETAILS
5RADIUS ELBOWS
4DUCT TRANSITIONS
1ROOF MOUNTED EXHAUST FAN
2OUTDOOR HEAT PUMP UNIT
3CONDENSATE TRAP DETAIL
W
H
90° MITERED ELBOW
ASHRAE #CR3-9 ASHRAE #SD5-10
CONICAL 90° TEE
45° TAPER
3/8" FLANGE
D45° TEE
ASHRAE #SD5-1
D
15° MAX.
REDUCER
ASHRAE #SD4-1
H
15° MAX.
REDUCER
W
15° MAX.H
D
RECT. TO ROUND TRANSITION
ASHRAE #SD4-3
90° 3-GORE ELBOW
ASHRAE #CD3-12
45° - 90° TEE
15° MAX.
ASHRAE #SD4-2
ROUND TO RECT. TRANSITION
W
H
D
RECTANGULAR TEE
H
2WW
W
W
H
SINGLE THICKNESSTURNING VANES
W/2
45° MAX
ASHRAE #SR5-1
BRANCH TAKE-OFF
W
H
30° MAXH
L
RECT. MITERED OFFSET
L
15° MAX
H
W
RECT. ANGLED OFFSET
D
W=0.75D 2
H
30°
H
30°
90°
AIR FLOW
BRANCH DUCT
ROUND DUCT
45°
SEAL ALL AROUND
90° ROUND COMBINATION TEE
SINGLE THICKNESSTURNING VANES
R/D=1.5 UNO
ROUND-RECTANGULAR-ROUNDTRANSITION
D
D
SHORT RADIUS ELBOW WITH TWO VANES
SHORT RADIUS ELBOW WITH ONE VANE
STANDARD RADIUS ELBOW
VANE
W
R
2/3 W
1/3 W
R
W
VANE
1/2 W
1/6 W
1/3 W
R
W
CENTERLINE R=3W/2
R SHALL EQUAL ORBE GREATER THAN1/6 W.
R SHALL EQUAL ORBE GREATER THAN1/3 W.
NOTES:
1. THIS DETAIL APPLIES TO RECTANGULAR DUCT ONLY.
2. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
3. ALL STANDARD RADIUS ELBOWS SHOWN ON DRAWINGS MAY BE MADE SHORT RADIUS
ELBOWS. ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
ECCENTRIC TRANSITION : MAX. 30° ANGLE
EXCEPT 45° IS PERMITTED AT ROUND TO FLAT OVAL
L (MIN.) = (W 2-W1)/0.58 FOR 30°
L (MIN.) = W 2-W1 FOR 45°
X°
CONVERGING CONCENTRIC TRANSITION :
X° = 60° MAX.
L (MIN.) = (W 2 - W1) / 1.15
DIVERGING CONCENTRIC TRANSITION :
X° = 45° MAX.
L (MIN.) = (W 2 - W1) / 2
L
W1
W2
L
W2 W1
W2 X°
L
W1
NOTE:
1. UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM
ANGLES SHOWN SHALL APPLY.
AIR FLOW
AIR FLOW
FAN BASE
MOTORIZED DAMPER
CANT STRIP
ANCHOR FAN TOCURB AND SEALALL AROUND
INSULATED FACTORY CURB,SECURE TO ROOF
COUNTER FLASHINGUNDER FAN BASE
SEE ARCH. FOR INFO. ONROOF CONSTRUCTION
DUCTTRANSITION ASREQUIRED
CAP & FLASHING
TYPICAL OF 4 CORNERS1/4" x 2 1/2" LAG BOLT
1/4" THICK
NEOPRENE
PAD
PRESSURE TREATED 4x4ANCHOR TO ROOF STRUCTURE
ROOFING
REFRIGERATIONLINE SET
PIPE SAME SIZE ASUNIT'S CONDENSATEDRAIN CONNECTIONSIZE
INDO0RS - ROUTE CONDENSATE PIPE TOACCEPTABLE DISPERSAL SITE
ROOFMOUNTED - ROUTE CONDENSATE PIPE TO
CLOSEST ROOF DRAIN
CLEAN OUTPLUGS
HVAC UNITCONDENSATE
DRAIN PAN
OPEN VENT
W
18" MIN.
2"
2"
1"
75561
OREGON
EXPIRES: 06/30/21
E
N G I N E E R
J A N . 11, 2 0 0 5
RE
GIS
T ERED PROF ESS ION
AL
J O H N M . K E L L E R
ISSUE DATE:
PROJECT NO.:
SHEET:
REVISIONS
Thi
s do
cum
ent,
and
the
idea
s an
d de
sign
s in
corp
orat
ed h
erei
n, a
s an
inst
rum
ent o
f pr
ofes
sion
al s
ervi
ce, i
s th
e pr
oper
ty o
f Kis
tler
Sm
all +
Whi
te A
rchi
tect
s an
d is
not
to
be u
sed,
in w
hole
or
in p
art,
for
any
othe
r pr
ojec
t w
ithou
t th
e w
ritte
n au
thor
izat
ion
of K
istle
r S
mal
l + W
hite
Arc
hite
cts.
Cop
ywrit
e 20
16 K
istle
r S
mal
l + W
hite
Arc
hite
cts,
LLC
66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200
SO
UT
HE
RN
OR
EG
ON
UN
IVE
RS
ITY
SIS
KIY
OU
BO
ULE
VA
RD
, A
SH
LA
ND
OR
EG
ON
, 97520
THESE DRAWINGS SHALLBE USED FOR:
CONSTRUCTIONBIDDING
RECORDATIONCONVEYANCE
ISSUANCE OF A PERMIT
2/1
9/2
020
9:2
6:3
6 A
M
M4.2
02.13.2020
1905
BID SET
B R
I T
T H
A L
L -
R E
N O
V A
T I O
N
MECHANICALDETAILS
SE
ISM
IC U
PG
RA
DE
/ O
HS
U R
EN
OV
AT
ION
-P
HA
SE
2