Dublin City CouncilThe North East Inner City Greening Strategy Update on Draft to Area CommitteePeter Leonard
September 2018
North East Inner City Greening Strategy
Fig. 2.6.1 Existing green spaces
Existing trees by approximate size
NEIC Tree Canopy Cover Study
Fig. 2.5.1 Estimated tree canopy cover across DCC managed land. Dublin Tree Canopy Study, University College Dublin, 2017. NEIC study area boundary outlined in black.
Community Workshops
North East Inner City Greening Strategy – Stage (i) Public Workshop, Charleville Mall Library, North Strand,7th March
Community Workshops
North East Inner City Greening Strategy – Stage (i) Public Workshop, Charleville Mall Library, North Strand,7th March
Community Workshops
North East Inner City Greening Strategy – Stage (i) Public Workshop, Charleville Mall Library, North Strand, 20th, 21st, 22nd April
-
L E G E N D
I I Hi:gh local biodiversity value
Moderate local biodiversityI I value
I I Low local biodiversity value
Existing urbam ecological11111 linking corridors
11111
11111
Existing aquatic ecological linking corridor
Potential urban ecological linking corridors
Liberty Park
2.0m buffer planting
Lawn / kickabout area ······•··•··•··································· •····
� - (!Cb)
/-- ---- lo c -
171 I 0(
,7
•
7 I
North East Inner City Greening Strategy
L
----rr-----n �-L .
..........................................................
...................................
�-··· _./ 0 '.___ ----
�.---
3.0m wide concrete
panel pathway
Skate bowl
Park lighting
13
Fig. 3.6.1 Key arterial routes and wide streets for proposed tree planting projects
Proposed street trees in buildouts with herbaceous planting understorey
Number of parking spaces reduced to allow for street tree buildouts
All plans shown in this document are preliminary and for the purposes of discussion only and are not fixed, all plans will be subject to further consultation
North East Inner City Greening StrategySean MacDermott Street
Fig. 3.6.2 Small scale streets for proposed tree planting projects
Street tree buid-out
Street treebuid-out
Footpath
Private garden
Private garden
Street parking
Residential roadFootpath
3.7.6 Small scale residential street: Caledon Road, East Wall
Section E-E: Existing
Section E-E: Possible Greening Intervention
Location of section on Caledon Road
Existing view of Caledon Road
Precedents: Residential street with tree planting in build-outs (left); example of small species tree Field Maple(right)
E
E
Forth Road possible greening intervention: tree planting with grass lawn
3.8.5 Forth Street, East Wall
Located in the north of the East Wall residential area, the large area of hard- standing pavement at the intersection of Forth Road and Bargy Road pre-sents at opportunity for street greening. Possible greening interventions could comprise of planting of medium-scale tree species with grass lawn.
Phase 3 . 2023 - 2026MARINERS PORT PARK (feasibility)ROYAL CANAL LINEAR PARK TREE PLANTING PROJECTSCHARLES STREET GREATEAST WALL AREA (RESIDENTAIL STREET PLANTING STAGE III)NORTH STRAND AREA (RESIDENTAIL STREET PLANTING STAGE III)MINOR PROJECTSSEAN O’CASEY PLAZAFROTH STREET COMMUNITY PLANTING PROJECT (Area Wide Stage III)
Phase 1. 2018 - 2021MOUNTJOY SQUAREDAIMOND PARKLIBERTY PARKTREE PLANTING PROJECTSKILLARNEY STREET SUMMERHILLSEAN MC DERMOT STREETDORSET STREET phase I (median refurbishment)EAST WALL AREA (RESIDENTAIL STREET PLANTING STAGE I)NORTH STRAND AREA (RESIDENTAIL STREET PLANTING STAGE I)MINOR PROJECTSBELVEDERE PLACE PLAZA GUILD STREET PLAZAGUILD STREET CANAL WALK (Harlequin Gardens)CITY FARM (Feasibility)COMMUNITY PLANTING PROJECT (Area Wide Stage I)
Phase 2 . 2021 - 2023EAST WALL RECREATIONAL SPACEROYAL CANAL LINEAR PARK (FEASIBILITY)TREE PLANTING PROJECTSFITZGIBBON STREETBELVEDERE PLACEDORSET STREET PHASE II (EXTENSION FO MEDIAN - FEASIBILITY)EAST WALL AREA (RESIDENTAIL STREET PLANTING STAGE II)NORTH STRAND AREA (RESIDENTAIL STREET PLANTING STAGE II)MINOR PROJECTSWEST ROAD PLANTINGIRVINE COURT POCKET PARKORIEL STREET PLAZACOMMUNITY PLANTING PROJECT (Area Wide Stage II)
PROJECT PHASING
Next Steps;
Further consultation - Draft avai lable on l ine for
s ix weeks for further review.