DMCI GLOBAL, LTD
Palm Jumeirah Monorail
DMCI GLOBAL, LTD
Palm Jumeirah Monorail
DMCI GLOBAL, LTD
Aerial View of Palm Jumeirah
DMCI GLOBAL, LTD
Aerial View of Atlantis Station (Atlantis Hotel in the background)
DMCI GLOBAL, LTD
Aerial View of Atlantis Station (Atlantis Aquaventure water park at left)
DMCI GLOBAL, LTD
Atlantis Station
DMCI GLOBAL, LTD
Atlantis Station
DMCI GLOBAL, LTD
Atlantis Switch Bridge
DMCI GLOBAL, LTD
Village Center Station
DMCI GLOBAL, LTD
Village Center Station
DMCI GLOBAL, LTD
Trump Tower Station
DMCI GLOBAL, LTD
Trump Tower Station
DMCI GLOBAL, LTD
Rebar Fabrication
DMCI GLOBAL, LTD
Inner Form Fabrication
DMCI GLOBAL, LTD
Soffit Form Setting
DMCI GLOBAL, LTD
End Form Setting
DMCI GLOBAL, LTD
Rebar Assembly
DMCI GLOBAL, LTD
Rebar Assembly
DMCI GLOBAL, LTD
Inner Form and Sheath Installation
inner form
sheath
DMCI GLOBAL, LTD
Side Form Preparation before inserting rebar cage
DMCI GLOBAL, LTD
Side Form Setting
DMCI GLOBAL, LTD
Concrete Placing
DMCI GLOBAL, LTD
Concrete Placing
DMCI GLOBAL, LTD
Curing
DMCI GLOBAL, LTD
Stressing
DMCI GLOBAL, LTD
Lifting to Stock Area
DMCI GLOBAL, LTD
Retouching
DMCI GLOBAL, LTD
Stocking Area
DMCI GLOBAL, LTD
CHALLENGES Placing of Stitching Concrete
DMCI GLOBAL, LTD
DMCI GLOBAL, LTD
Palm Jumeirah Monorail Guideway Beam Production & Stitching Precasting of 428 beams each beam is 28m long x 1m wide x 2m high and weighs 80 tons
Joining of beams to columns at site beams are “stitched” to other beams and columns by concrete
Contract Amount: AED 11.3 Million
DMCI GLOBAL, LTD
Palm Jumeirah Monorail Atlantis Station 3 floors 2100 sq m Contract Amount (Structural): AED 3.6 Million Contract Amount (Finishing): AED 11.0 Million
DMCI GLOBAL, LTD
Palm Jumeirah Monorail Village Center Station 5 floors 2200 sq m Contract Amount (Structural): AED 3.9 Million Contract Amount (Finishing): AED 7.9 Million
DMCI GLOBAL, LTD
Palm Jumeirah Monorail Trump Tower Station 3 floors 1700 sq m Contract Amount (Structural): AED 2.6 Million Contract Amount (Finishing): AED 9.5 Million
DMCI GLOBAL, LTD
Project Features Monorail Guideway Beams 32 cu m concrete per beam (typical) 80 tons beam weight (typical) 2 beams per day average production Hollow section Pre-stressed, post-tensioned Vertically & horizontally curved and canted beams Curved soffit
Monorail Stations Structural: Concrete: 5900 cu m Rebar: 1160 tons Finishes: (1) Custom glass and aluminum external envelope (2) Spray tile finish to exterior concrete surfaces (3) Granite interior walls and floors (4) Perforated aluminum ceiling finish
Benefits Derived :
Profit realized
Retention of human resource
Capability enhancement – through this
experience the company was able to win
two more projects in the Philippines.