7/30/2019 Dredging Tender Schedule
1/5
Sl.
No.Qty Description of work
TNBP
No.
Rate
(Both Figures and words)Unit Amount
1 98000 m
(Ninety eight
thousand cubic metre
only)
Dredging in front of existing / proposed quay and in
the entire harbour basin, entrance channel / inlet
from creek to sea from existing levels to specified
levels and slopes in the area marked in the drawing in
all types of soils, pebbles, soft rock etc., dredgable by
suction cutter / backhoe or any other suitable
method, carrying / transporting in hopper Barges /
pipelines and disposing by depositing either in the
marked reclamation area and/or in the dumping area
located at about 1.5km to 2.00km away from the work
spot and as per the directions and to the complete
satisfaction of EIC including all charges of
mobilization, demobilization of machineries /
equipments, men, materials etc., complete with all leadand lift including conveyance charges to a minimum of
1.5 km distance away from the work site and as
directed b the de artmental officers.
Spl
1 m3
Mainenance Dredging in the Channel and basin and provision of facilities in the fishing harbour at Spoil
Island Cuddalore Port in Cuddalore District
SCHEDULE-A
Contractor
No. of Correction in figures: ......
No. of Correction in words: .......
Chief Engineer,
FHPC, Chennai-6
-
7/30/2019 Dredging Tender Schedule
2/5
Sl.
No.Qty Description of work
TNBP
No.
Rate
(Both Figures and words)Unit Amount
2 8500 m(Eight thousand five
hundred cubic metre
only)
Reclamation with gravel / muram at the fishingharbour open area as shown by the departmental
officers including excavating the earth in the borrow
area conveying through tipper to a distance of 12km
including loading and unloading at the site to be
reclaimed spreading the gravel watering, consolidating
by power roller to achieve the required practordensity including all labour charges and the hire
charges of all machinery and tools and plants etc.,
complete complying with standard specification and as
directed by the departmental officers.
Spl
1 m3
3 100 m
(One hundred cubicmetre only)
Earthwork excavation for foundation to full depth as
per designed in all soils and sub soils except softdisintegrated rock not requiring blasting and hard
rock requiring blasting and bailing out water wherever
necessary. Refilling the sides of foundation with
excavated earth other than sand in layers of well
rammed and compacted and depositing the surplus
earth in places shown by the departmental officerswith an initial lead of 10m and initial lift of 2m and
clearing and leveling the site etc., complete complying
with standard specification as per the directed by the
departmental officers.
1 m3
Contractor
No. of Correction in figures: ......
No. of Correction in words: .......
Chief Engineer,
FHPC, Chennai-6
-
7/30/2019 Dredging Tender Schedule
3/5
Sl.
No.Qty Description of work
TNBP
No.
Rate
(Both Figures and words)Unit Amount
4 15 m(Fifteen cubic metre
only)
Plain Cement concrete 1:4:8 (one cement, four sandand eight broken machine crushed stone jelly) using
HBG of size 40mm gauge for foundation and basement
including de-watering if found necessary and laid in
layers of not more than 15 cm thick etc., complete
complying with standard specification and as directed
by the departmental officers.
1 m3
5 91 m
(Ninety one cubic
metre only)
Plain cement concrete 1:1:3 (one cement one and half
sand and three aggregates) using HBG Machine
crushed stone jelly of size 20mm gauge for foundation
and basement including de-watering if found necessary
and laid in layers of not more than 15cms thick etc.,
complete complying with standard specification and asdirected by the departmental officers.
1 m3
Contractor
No. of Correction in figures: ......
No. of Correction in words: .......
Chief Engineer,
FHPC, Chennai-6
-
7/30/2019 Dredging Tender Schedule
4/5
Sl.
No.Qty Description of work
TNBP
No.
Rate
(Both Figures and words)Unit Amount
6 390 m(Three hundred and
ninety square metre
only)
Providing form work for centering, shuttering etc., forall RCC works inclding strutting up to 3.29m in all
floors using mild steel sheets of size 90x60cm of B.G.
10 stiffened with mild steel angles of size
25x25x3mm laid over silver oak (country wood) joist
of size 10x6.5cm spaced at about 90cm c/c supported
by casurina props of 10 to 13 cm dia (spaced at 75cmcenter) complying with standard specification and as
directed by the departmental officers and removing
the same after specified period with out damaging the
concrete etc., complete.
1 m3
7 142 m
(One hundred andforty two cubic metre
only)
Supply and laying packing the Gravel for revetment
15cm thick to the required slope including watering,consolidation etc., complete and as directed by the
departmental officers.
1 m3
8 142 m
(One hundred and
forty two cubic metre
only)
Rough stone dry packing revetment for side of the
boat basin including cost of rough stone labour
charges for sectioning etc., complete and as directed
by the departmental officers.
1 m3
Contractor
No. of Correction in figures: ......
No. of Correction in words: .......
Chief Engineer,
FHPC, Chennai-6
-
7/30/2019 Dredging Tender Schedule
5/5
Sl.
No.Qty Description of work
TNBP
No.
Rate
(Both Figures and words)Unit Amount
9 130 Rm
(One hundred and
thirty running metre
only)
Providing Ring Bund using casurina piles and casurina
bullies on two sides and dumping the sand bags in
between the casurina piles and filling the gap with
earth etc., complete ring bund of size 1.5 metre width
and 2 metre height. Casurina poles of size 8cm to
10cm of length 3 metre of which 1 metre of casurina
poles are to be driven below the ground level and thecasurina poles are to be driven with 0.5 metre interval
on both sides and casurina bullies of size 4cm to 5cm
tied or fixed horizontally at 0.25m interval Diaphragm
wall area complying with standard specification and as
directed by the departmental officers.
1 Rm
Contractor
No. of Correction in figures: ......
No. of Correction in words: .......
Chief Engineer,
FHPC, Chennai-6