Overview
Strategic Planning
Dredging Project Design
Dredging Project Execution
Operations & Maintenance
Port Management System
Strategic PlanningStrategic Planning
Identifies:Identifies:–– Broad Port GoalsBroad Port Goals–– Key Market OpportunitiesKey Market Opportunities–– Port Development ObjectivesPort Development Objectives–– Environmental Policy and Environmental Policy and
ObjectivesObjectives
Strategic Planning (Concept Design)
Scoping
Dredging
(& Dredged Material Disposal)
Project Design
Return on Investment
Analysis
Environmental Analysis
Mitigation Planning
Partners Approval Expert Review
Dredging Project Execution
Dredging Project DesignDredging Project Design
Specify Design VesselSpecify Design VesselCommercial RequirementsCommercial RequirementsPhysical/Environmental DataPhysical/Environmental DataExisting Traffic AnalysisExisting Traffic Analysis
Channel Alignment, Widths, Channel Alignment, Widths, DepthsDepths
Maritime Risk (Safety) Maritime Risk (Safety) AnalysisAnalysis
Dredging Project DesignDredging Project Design
Design for Reduced ShoalingDesign for Reduced Shoaling–– Keep Sediment OutKeep Sediment Out–– Keep Sediment Moving Keep Sediment Moving
Key Design ToolsKey Design Tools–– Hydrodynamic and Hydrodynamic and
Sedimentation ModelsSedimentation Models–– Ship Handling SimulationsShip Handling Simulations–– Traffic PlanningTraffic Planning
Strategic Planning (Concept Design)
Scoping
Dredging
(& Dredged Material Disposal)
Project Design
Return on Investment
Analysis
Environmental Analysis
Mitigation Planning
Partners Approval Expert Review
Dredging Project Execution
Dredging Project ExecutionDredging Project Execution
Project Management PlanProject Management PlanMonitoring PlanMonitoring PlanCommunicationCommunication–– Project TeamProject Team–– PublicPublic
EvaluationEvaluation–– Project GoalsProject Goals–– Environmental EffectsEnvironmental Effects
ReferencesReferencesApproach Channels Approach Channels –– A Guide for DesignA Guide for Design, PIANC , PIANC PTC IIPTC II--30; June 199730; June 1997Minimizing Harbor SedimentationMinimizing Harbor Sedimentation, PIANC WG 43; , PIANC WG 43; January 2005 (draft)January 2005 (draft)Guidelines for Sustainable Inland Waterways and Guidelines for Sustainable Inland Waterways and NavigationNavigation, PIANC EnviCom Rpt of WG 6; 2003, PIANC EnviCom Rpt of WG 6; 2003Ecological and Engineering Guidelines for Ecological and Engineering Guidelines for Wetlands Restoration in Relation to the Wetlands Restoration in Relation to the Development, Operation and Maintenance of Development, Operation and Maintenance of Navigation InfrastructuresNavigation Infrastructures, PIANC EnviCom Rpt of , PIANC EnviCom Rpt of WG 7; 2003WG 7; 2003