Dredging of Gold Tailings Dam (WA) (HDPE Lined Pond) Material Pumped Gold Tailings Depth Pumped 1-5 m Pump Capacity 4000 L/min (clear water) Slurry Ratio 15% Slurry Pumping Flow Rate 202 m 3 / hr Average slurry extraction 1617 m 3 /day* Average wet solid extraction 242 m 3 /day* Pumping Distance 180 m

Upload: others

Post on 21-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Dredging of Gold Tailings Dam (WA) (HDPE Lined …...Dredging of Gold Tailings Dam (WA) (HDPE Lined Pond) Material Pumped Gold Tailings Depth Pumped 1-5 m Pump Capacity 4000 L/min

DredgingofGoldTailingsDam(WA)(HDPELinedPond)

Material Pumped Gold Tailings

Depth Pumped 1-5 m

Pump Capacity 4000 L/min (clear water)

Slurry Ratio 15%

Slurry Pumping Flow Rate

202 m3/ hr

Average slurry extraction

1617 m3/day*

Average wet solid extraction

242 m3/day*

Pumping Distance 180 m