drakenstein municipality within cape winelands...

14
2015/06/24 1 Presented by: André Kowalewski Presented by: André Kowalewski Presented by: André Kowalewski Presented by: André Kowalewski Drakenstein Municipality within Cape Winelands Area Drakenstein Municipality within Cape Winelands Area

Upload: vuongxuyen

Post on 11-Apr-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

2015/06/24

1

Presented by: André KowalewskiPresented by: André KowalewskiPresented by: André KowalewskiPresented by: André Kowalewski

Drakenstein Municipality within Cape Winelands Area

Drakenstein Municipality within Cape Winelands Area

2015/06/24

2

Drakenstein Municipal AreaDrakenstein Municipal Area

WDM/WCM Interventions WDM/WCM Interventions

The following Water Demand Management and Conservat ion interventions where established.

- Hydraulic Modeling of water reticulation network for all towns.

- Introduction of a five step rising block tariff scheme.

- Pressure Management Imitative was implemented.

- Metering of all unmetered water connections and metering of all fire

fighting water connections.

- Increased public awareness and promotion of water saving devices.

- Refurbishment/replacement of existing water network (10.3km/2014/2015).

The following Water Demand Management and Conservat ion interventions where established.

- Hydraulic Modeling of water reticulation network for all towns.

- Introduction of a five step rising block tariff scheme.

- Pressure Management Imitative was implemented.

- Metering of all unmetered water connections and metering of all fire

fighting water connections.

- Increased public awareness and promotion of water saving devices.

- Refurbishment/replacement of existing water network (10.3km/2014/2015).

2015/06/24

3

Results and Successes Results and Successes

4 444 100

17 818 930

12 521 000

0.000

2000.000

4000.000

6000.000

8000.000

10000.000

12000.000

14000.000

16000.000

18000.000

20000.000

1959

1962

1965

1968

1971

1974

1977

1980

1983

1986

1989

1992

1995

1998

2001

2004

2007

2010

2013

Years

Paarl Water Demand 1959 - 2014

Total Water Demand

Ann

ual D

eman

d(M

egal

itres

)

0

5000

10000

15000

20000

25000

30000

35000

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

Wa

ter

De

ma

nd

(M

l/y

ea

r)

Time (Years)

Paarl Water Demand 1989 to 2014

Actual Demand

Projected Demand @ 3.5 %

Theoretical SavingsTheoretical Savings

Saving of 174 460 000 000 litres

Saving of R872 Million @ R5/kl

2015/06/24

4

Non Revenue water since 1999Non Revenue water since 1999

0

10

20

30

40

50

60

70

80

90

100

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

% N

on

-Re

ve

nu

e

Wa

ter

TIme (Years)

Paarl Non-Revenue Water 1999 - 2014

34.8% NRW

10.6% NRW

Non-Revenue Water StatisticsNon-Revenue Water Statistics

Table C 5.2: Non-revenue water for the various dist ribution systems

Description Unit 13/14

Record : Prior (Ml/a)

12/13 11/12 10/11 09/10 08/09

Paarl and Wellington

Volume 2 395.480 2 031.439 1 839.764 1 818.452 1 624.675 2 129.013

Percentage 14.00% 12.08% 11.05% 10.81% 10.20% 13.75%

ILI 2.30 2.17Paarl 2.39

W el 1.14

Paarl 1.84

W el 2.52

Paarl 2.14

W el 0.74

Saron

Volume 183.080 60.456 63.060 148.941 163.005 136.935

Percentage 32.23% 10.87% 10.72% 25.06% 28.50% 22.94%

ILI 5.63 1.87 1.97 4.61 5.46

Gouda

Volume 60.212 34.809 30.885 26.965 22.791 17.222

Percentage 32.07% 19.98% 19.95% 16.86% 15.65% 11.64%

ILI 4.59 2.62 2.50 2.01 1.64

Hermon

Volume -17.173 1.958 16.885 18.365 13.562 19.953

Percentage -48.64% 5.24% 35.20% 43.80% 39.97% 59.10%

ILI - 0.35 3.72 3.78 3.38

Bainskloof

Volume 1.646 0.671 1.649 0.579 0.452

Percentage 37.36% 17.41% 40.65% 12.30% 11.93%

TOTAL

Volume 2 623.245 2 129.333 1 952.243 2 013.302 1 824.485 2 303.123

Percentage 14.65% 12.11% 11.19% 11.43% 10.94% 14.15%

ILI 2.34 2.11 1.98 2.02 1.21

2015/06/24

5

Facts-Facts-

Drakenstein Municipality – upgrading of services before 2000.

Shift to conserve and save water in 1999.

Water losses of 33.8% @ 1999

Water losses of 14.1% @ January 2015

Drakenstein Municipality – upgrading of services before 2000.

Shift to conserve and save water in 1999.

Water losses of 33.8% @ 1999

Water losses of 14.1% @ January 2015

Measures requiredMeasures required

To sustain the Water Demand Management efforts obtained by Drakenstein Municipality the following strategy were followed, namely:

Proper record keeping of data and information regarding the infrastructure (including flow measurements)Historical information of the whole reticulation systems. Training for personal and using the correct equipment for all day to day operations

To sustain the Water Demand Management efforts obtained by Drakenstein Municipality the following strategy were followed, namely:

Proper record keeping of data and information regarding the infrastructure (including flow measurements)Historical information of the whole reticulation systems. Training for personal and using the correct equipment for all day to day operations

2015/06/24

6

Measures requiredMeasures required

Refurbish reticulation system using quality materials Preventative maintenance program (maintaining of valves, pumps and equipment before it become problem)Reduce pipe repair reaction time (attend to water burst pipe incidents, i.e. 1 hour of less)

Refurbish reticulation system using quality materials Preventative maintenance program (maintaining of valves, pumps and equipment before it become problem)Reduce pipe repair reaction time (attend to water burst pipe incidents, i.e. 1 hour of less)

Pressure Management

Upgrading & Replacement

of Infrastructure

Meter Replacement

Program

Public Awareness

Water Tariff

Structure

Preventative Maintenance

Hydraulic Modelling

Water Saving Devices

?

2015/06/24

7

Economic Level of Leakage

Meter Errors

Active LeakageControl

Water

Accounting

Errors

Speed and quality

of repairs

Meter

Under

Registration

Pipe Materials Management:

selection,installation,

maintenance,renewal,

replacement

Water

TheftExisting Commercial Losses

Economic TargetFor Commercial

Losses

2015/06/24

8

Current Annual Real Losses

Potentially Recoverable Real Losses

Economic Level of Real Losses

Unavoidable Annual Real

Losses

Pressure Management

Pressure

Management

Active LeakageControl

Speed and Quality of Repairs

Speed and quality

of repairs

Active Leakage Control

Pipe Materials Management:

selection,installation,

maintenance,renewal,

replacement

Active LeakageControl

Speed and Quality of Repairs

Potentially Recoverable Real Losses

Economic Level of Real Losses

Unavoidable Annual Real

Losses

Pressure Management

Pressure

Management

Speed and quality

of repairs

Active Leakage Control

Pipe Materials Management:

selection,installation,

maintenance,renewal,

replacement

Pipeline and Assets

Management: Selection, Installation, Maintenance, Renewal,

Replacement

100% of reported leaks repaired within 48 Hours

2015/06/24

9

Active LeakageControl

Speed and Quality of Repairs

Potentially Recoverable Real Losses

Economic Level of Real Losses

Unavoidable Annual Real

Losses

Pressure Management

Pressure

Management

Speed and quality

of repairs

Active Leakage Control

Pipe Materials Management:

selection,installation,

maintenance,renewal,

replacement

Pipeline and Assets

Management: Selection, Installation, Maintenance, Renewal,

Replacement

50% of reported leaks repaired within 48 Hours

Telemetric SystemTelemetric System

2015/06/24

10

Refurbishment of Welvanpas Booster Pump Station October 2014

Refurbishment of Welvanpas Booster Pump Station October 2014

Valve Chamber (700mmØ) –Van der Stel Street, Paarl 2013

Valve Chamber (700mmØ) –Van der Stel Street, Paarl 2013

2015/06/24

11

Valve Control Chamber- Newton Reservoir, Wellington - April 2015Valve Control Chamber- Newton Reservoir, Wellington - April 2015

PRV installation –Denneburg, PaarlPRV installation –Denneburg, Paarl

2015/06/24

12

PRV & pressure/flow controller installation- Van der Stel Street, Paarl

PRV & pressure/flow controller installation- Van der Stel Street, Paarl

Pressure Reducing Valve

Controller Pressure

Isolating Valve

Pearl Valley Bulk Water Meter – October 2014Pearl Valley Bulk Water Meter – October 2014

2015/06/24

13

Refurbishment of pipework at Van BlerkReservoir, Wellington –September 2014

Refurbishment of pipework at Van BlerkReservoir, Wellington –September 2014

Water Burst pipe – Thom Street, Paarl (30 Oct 2014)

Water Burst pipe – Thom Street, Paarl (30 Oct 2014)

2015/06/24

14

ChallengesChallenges

Funding of projects (operational and capital funding)

Shortage of qualified Technical personal

Vandalism/theft of infrastructure

Funding of projects (operational and capital funding)

Shortage of qualified Technical personal

Vandalism/theft of infrastructure

Thank YouThank You