draft minerals form - derbyshire · associated development (including processing) extraction 16....

27
Page 1 of 22 Application Form Minerals and Associated Waste Development Town and Country Planning Act 1990 1. Applicant Details Title First Name Last Name Company Premises/ No/Name Street Locality Town County Postcode Tel No Mobile No Fax No Email APPLICANTS SHOULD READ THE ACCOMPANYING GUIDANCE NOTES BEFORE COMPLETING THIS APPLICATION FORM.

Upload: others

Post on 02-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 1 of 22

Application FormMinerals and Associated Waste Development

Town and Country Planning Act 1990

1. Applicant Details

Title First Name

Last Name

Company

Premises/No/Name

Street

Locality

Town

County

Postcode

Tel No

Mobile No Fax No

Email

APPLICANTS SHOULD READ THE ACCOMPANYING GUIDANCE NOTES BEFORECOMPLETING THIS APPLICATION FORM.

Page 2: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 2 of 22

2. Agents Details

3. Description of the Proposed Development i) Please briefly describe the proposed development

ii) Has any part of the development already started? Yes No If yes, please state the date when development was started (DD/MM/YYYY)

Title First Name

Last Name

Company

Premises/No/Name

Street

Locality

Town

County

Postcode

Tel No

Mobile No Fax No

Email

Page 3: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 3 of 22

iii) Has any part of the development already been completed? Yes No

If yes, please state the date when development was completed (DD/MM/YYYY)

4. Pre-application Advice Has assistance or prior advice been sought from the local authority about this application? Yes No (If yes, please provide the details below) Officer Name Reference Date 5. Full Address of Proposed DevelopmentPremises/ No/Name

Street

Locality

Town

County

Postcode

Please provide a grid reference or description if the postcode is not known

Easting Northing

Description

Page 4: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 4 of 22

6. Existing/Last Known Land Use of Site

7. Applicant’s Interest in the Site and any Adjoining Land

8. Previous Mineral Permissions i) Please list any previous planning permissions for mineral operations on the site ii) Are you or anyone else with an interest in the land willing to consolidate or update existing permissions including associated development on the site? Yes No 9. Total Application AreaPlease state the total site area (the red line area) in hectares (ha)

10. Nature of Minerals Application

(Tick any that apply) a) New mineral extraction........................................................ b) Extension to an existing site................................................ c) Associated operations………...............................................

e) Other (please specify below)...............................................

d) Development already begun or carried out (section73A)....

Is this application for:

Page 5: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 5 of 22

11. Type of Development Does this application include:(Tick any that apply) Mineral exploration………………………………..

Mineral extraction…………………………………

Underground Mining………………………………

Mineral processing………………………………..

Surface disposal of mine and quarry wastes…..

Landfill or infill of mineral extraction sites……… 12. Plans, Drawings and Supporting Material. List here the plans and drawings submitted with the application. Refer to guidance notes for drawings which are required or would be advisable to accompany your application

13. Environmental Statement i) Is the application accompanied by an Environmental Statement? Yes No

(If yes, please complete parts ii to iv below)

ii)Please provide details of where additional copies of the Environmental Statement other application documents will be made available for public inspection other than the offices of the County or District Council?

and

iii) What is the price for a copy of the Environmental Statement?

iv) Please provide a contact address from which a copy of the Environmental Statementcan be purchased (if different from ii).

Page 6: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 6 of 22

14. Certification Which certificate has been completed as required by Article 12 of the Town and CountryPlanning (Development Management Procedure) Order 2010 (copies of the certificates areincluded at the end of this form).

The Mineral Planning Authority cannot entertain an application unless it is accompanied bythe appropriate certificates

15. Fees What fee accompanies this application? SPECIFIC QUESTIONS RELATING TO EXTRACTION AND WORKING OF MINERALS AND ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING)

Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted Type Quantity 17. Area of Excavation i) Please state the area of excavation in hectares (ha)

ii) Please state the highest existing ground level of theexcavation area expressed as metres above ordnancedatum (AOD)

iii) Please state maximum depth of excavationsexpressed as metres AOD

18. Proposed Duration of Mineral Extraction i) Proposed start date (dd/mm/yyyy)

ii) Proposed end date (dd/mm/yyyy)

iii) Duration of extraction operations

iv) Duration of all site operations if different from iii) above

Certificate A Certificate B Certificate C Certificate D

Page 7: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 7 of 22

Depth(mm)

3Volume (m )

(Average) (Ranges)

19. Proposed Method of Extraction

20. Soil and Overburden i) For surface mineral workings or deposit on land of mineral wastes, please provide thefollowing information relating to soils and overburden

Topsoil existing on site

Subsoil existing on site

Overburden tobe removed

ii) Summarise the provision to be made for the temporary or permanent storage of soils or overburden

21. Agricultural Land Please state the area (ha) and grades of agricultural land (under the Agricultural LandClassification) affected by extraction

22. Waste Resulting From Extraction

Please provide details (types and quantities) of wastes which will result fromextraction operations

Page 8: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 8 of 22

Type of Waste Quantity Produced

23. Quality Assessment Please provide details of the evaluation procedures which will be undertaken to assess the quality of the minerals and the results

24. Ancillary Operations Would any ancillary operations last beyond the period of mineral extraction?

Yes No (If yes, please state the operation(s) and anticipated duration below)

Mineral Processing 25. Materials to be Processed Please provide details (types and quantities) of material to be processed on site

Page 9: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 9 of 22

26. Imported Materials Will any of the processes to be carried out require the importation of any other materialsonto the site? Yes No (If yes, please provide details including type and quantity below)

27. Plant and Machinery

i) Please provide details of any plant and machinery used for processing materials

ii) Maximum height of plant as measured from existing ground level (metres)

28. Plant Capacity

Tonnes Per Hour Tonnes Per Year

Estimated normal capacityof processing plant

Estimated maximumcapacity or processingplant

Type of Material Quantity to be Processed

Page 10: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 10 of 22

29. Water Source Please provide details of the source of water (if any) to be used in processing

30. StockpilesMaximum height of stockpiles or storage facilities for processed materialas measured from existing ground level

31. Processed Materials Please provide details (types and quantities) of the material(s) which will result fromprocessing

Type of Material Quantity to be Produced

32. Off-Site Processing Please provide the location of any off-site processing plant if applicable

33. End Use of Processed Material Please provide details of the end use and immediate proposed destination of mineral products

Page 11: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 11 of 22

34. Waste Arising from Processing i) Nature and quantity of waste

Nature of Waste Estimated Annual Quantity Produced

ii) Maximum height of any waste/tip(s) as measured from existing groundlevel (metres)

iii) Is it proposed for any waste tips to be located within any excavation?

Yes No (If yes, please ensure these are clearly marked on a plan)

iv) Would the mineral processing involve tailing lagoons?

Yes No (If yes, please ensure these are clearly marked on a plan)

Transportation of Waste (Extraction and Processing) 35. Waste TransportationIs it proposed to dispose of any waste at a separate site? Yes No (If yes, please complete questions i and ii below)

i) Location of off-site waste disposal

ii) Methods to be used to transport waste (e.g. Pipeline)

Page 12: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 12 of 22

Other Buildings, Plant or Structures 36. Buildings, Plant and Structures Please briefly describe the number and purpose of any buildings, plant or other structures to be erected and provide plan references which show size and appearance

Traffic and Transport 37. Proposed Method(s) of Transportation of Processed Materials

38. Site Access i) Is it proposed to use an existing access to the application site?

Yes (go to ii) No (go to iii)

ii) Will any alterations be made to the existing access to the site?

Yes No (if yes, please provide details below)

iii) Are new access arrangements to be constructed?

Yes No (if yes, please provide details below)

Page 13: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 13 of 22

39. Vehicle Movements

Average Maximum

In Out In Out

Estimated number of haulagevehicles likely to enter or leavethe site daily

Estimated capacity of loadedvehicles

Estimated number ofprivate/service/other vehicleslikely to enter or leave site daily

40. Vehicle RoutingPlease state routes to be used to the primary road network on leaving the application siteand summarise proposed methods to be used to control traffic impacts

Environmental Effects of Development

41. Statutory Designations Is any part of the application site or any adjoining land covered by statutory designationsincluding habitats of protected species? Yes No (If yes, please provide details below)

Page 14: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 14 of 22

Mineral processing

Servicing/maintenance of plant

Vehicular movements

Other (please specify below)

43. Noise i) Please state existing background noise levels and predicted noise levels at site boundariesand/or nearest properties, where measured

Location

Existing Background Noise

Predicted Noise Level

ii) Please summarise proposed measures for controlling noise and methods for noise monitoring(as relevant)

42. Hours of Operation

Time period Days of the week

Soil stripping and overburden removal Mineral working

Page 15: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 15 of 22

44. Dust Please summarise proposed measures for controlling and suppressing dust (including treatmentof storage heaps) and minimising the spread of any minerals and waste onto the public highway 45. Blasting i) Will mineral extraction require blasting? Yes No (If yes, please answer parts ii to v below) ii) Please provide details of proposed methods for monitoring vibration from blasting iii) Please state maximum anticipated vibration levels at nearby properties

Property Predicted Vibration Level

iv) Please provide details of anticipated methods, frequency and hours of blasting

Page 16: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 16 of 22

v) Indicate the proposed methods to provide public warnings of blasting 46. Hazardous Substances i) Will any hazardous materials be imported used or stored on site? Yes No (If yes, please specify type and storage method below) ii) Please state the measures to be taken to prevent the spillage or seepage of fuel oilsduring delivery, storage and handling on site

47. Wateri) Outline any proposed measures to control water pollution and drainage/flood control

ii) If Working is to take place below the natural water table, is the working to be wet or dry?

Wet Dry Not Applicable

Page 17: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 17 of 22

(If dry, describe proposed methods of dewatering, proposed method of water disposal andany proposed mitigation measures)

48. Environmental Protection Act 1990Please state whether any processes are to be registered under Part A and B of theEnvironmental Protection Act 1990 and describe the nature of these operations 49. Public Rights of Way Does the proposal affect a public right of a way? Yes No 50. Visual Impact Please outline any landscaping or other proposals to reduce visual impact during working 51. Stability of Working Faces, Tips and Associated Structures Please outline any measures to ensure stability of working faces, tips and associatedstructures

(If Yes, ensure proposed diversions and/or closures are indicated on a plan)

Page 18: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 18 of 22

Landfilling of Mineral Extraction Sites (to be completed where relevant)

52. Landfilling with imported wastes

Does your proposal include landfilling with any imported wastes?

Yes No (If no, go to question 55)

i) Estimated maximum void space for filling (m3)

ii) Proposed total area to be filled (ha)

53. Materials to be Deposited (excluding material for soil cover and restoration)

Nature Proportion Inert Source(s)

Household

Industrial

Commercial

Other wastes(please specify)

54. Built Development Please state the nature of any built development within 250 metres of areas proposed to be landfilled with household, industrial or commercial wastes 55. Landfill Gas and Leachate Please summarise proposed measures for monitoring and controlling:

A9100254
Typewritten Text
Quantity per annum
Page 19: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 19 of 22

i) Landfill gas ii) Leachate Restoration, Aftercare and Afteruse 56. Intended Afteruse or UsesPlease specify area (ha) of any intended afteruse

Intended Use Area (ha)

Agricultural

Forestry

Amenity

Other (please specify below)

57. Restoration Phasing Is restoration and aftercare to be phased?

Yes No (If Yes, summarise number and duration of phases) 58. Use of Soil Materials in RestorationPlease give details of any proposed use of soil materials in restoration

Page 20: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 20 of 22

Total Amounts (m3) Average Thickness (mm)

Topsoil from site

Subsoil from site

Overburden/other soil making material

Other soil sources (please state below)

59. Restoration Methods and Machinery Please summarise the proposed methods and machinery to be used during restoration 60. Aftercare i) Is any restoration work likely to take place within 12 months of commencement of working? Yes If Yes, please describe the proposed aftercare below No If No, summarise the items proposed for inclusion in an aftercare scheme to be

agreed at a later date, including land management during the aftercare period and intended arrangements in the longer term.

ii) Who would carry out the aftercare operations?

Page 21: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 21 of 22

iii) Are there any specific proposals or agreements for the management of land? Yes No (If Yes, please provide details below)

61. Benefits of the Development i) Employment

Please complete the following information regarding employees:

Full-time Part-time Total full-time equivalent

Existing employees

Proposed employees

ii) Please indicate what you consider to be the socio-economic and environmental benefits

of the proposal

Page 22: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

Page 22 of 22

62. Declaration I / We hereby apply for permission to carry out the development described in this application and declare that, to the best of my/our knowledge, the information is correct; and (in the case of agents) that I am/we are fully authorised to submit this application on behalf of the applicant(s) Signed ___________________________________ On behalf of (if applicable) _____________________ Date ___________________________________

Page 23: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

i

Ownership Certificates and Agricultural Land Declaration

One Certificate A, B, C, or D, must be completed with this application form

CERTIFICATE OF OWNERSHIP - CERTIFICATE A

Town and Country Planning (Development Management Procedure) (England) Order 2015 Certificate under Article 14

I certify/The applicant certifies that on the day 21 days before the date of this application nobody except myself/ the applicant was the owner* of any part of the land or building to which the application relates, and that none of the land to which the application relates is, or is part of, an agricultural holding** NOTE: You should sign Certificate B, C or D, as appropriate, if you are the sole owner of the land or building to which the application relates but the land is, or is part of, an agricultural holding. * “owner” is a person with a freehold interest or leasehold interest with at least 7 years left to run. ** “agricultural holding” has the meaning given by reference to the definition of “agricultural tenant” in section 65(8) of the Act. Signed - Applicant: Or signed - Agent: Date (DD/MM/YYYY):

Page 24: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

ii

Ownership Certificates and Agricultural Land Declaration (continued)

CERTIFICATE OF OWNERSHIP - CERTIFICATE B

Town and Country Planning (Development Management Procedure) (England) Order 2015 Certificate under Article 14

I certify/ the applicant certifies that I have/the applicant has given the requisite notice to everyone else (as listed below) who, on the day 21 days before the date of this application, was the owner* and/or agricultural tenant** of any part of the land or building to which this application relates. * “owner” is a person with a freehold interest or leasehold interest with at least 7 years left to run. ** “agricultural tenant” has the meaning given in section 65(8) of the Town and Country Planning Act 1990

Name of Owner / Agricultural Tennant

Address

Date Notice Served

Page 25: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

iii

Signed - Applicant: Or signed - Agent: Date (DD/MM/YYYY):

Page 26: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

iv

Ownership Certificates and Agricultural Land Declaration (continued)

CERTIFICATE OF OWNERSHIP - CERTIFICATE C

Town and Country Planning (Development Management Procedure) (England) Order 2015

Certificate under Article 14 I certify/ the applicant certifies that: Neither Certificate A or B can be issued for this application All reasonable steps have been taken to find out the names and addresses of the other owners* and/or agricultural tenants** of the land or building, or of a part of it, but I have/ the applicant has been unable to do so. * “owner” is a person with a freehold interest or leasehold interest with at least 7 years left to run. ** “agricultural tenant” has the meaning given in section 65(8) of the Town and Country Planning Act 1990 The steps taken were:

Name of Owner / Agricultural Tennant

Address

Date Notice Served

Notice of the application has been published in the following newspaper (circulating in the area where the land is situated):

On the following date (which must not be earlier than 21 days before the date of the application):

Signed - Applicant: Or signed - Agent: Date (DD/MM/YYYY):

Page 27: Draft Minerals form - Derbyshire · ASSOCIATED DEVELOPMENT (INCLUDING PROCESSING) Extraction 16. Minerals to be Extracted Please list the types and quantities of minerals to be extracted

v

Ownership Certificates and Agricultural Land Declaration (continued)

CERTIFICATE OF OWNERSHIP - CERTIFICATE D

Town and Country Planning (Development Management Procedure) (England) Order 2015 Certificate under Article 14

I certify/ the applicant certifies that: Certificate A cannot be issued for this application All reasonable steps have been taken to find out the names and addresses of everyone else who, on the day 21 days before the date of the application, was the owners* and/or agricultural tenant** of any part of the land or any part of the land to which this application relates, but I have/ the applicant has been unable to do so. * “owner” is a person with a freehold interest or leasehold interest with at least 7 years left to run. ** “agricultural tenant” has the meaning given in section 65(8) of the Town and Country Planning Act 1990

The steps taken were:

Notice of the application has been published in the following newspaper (circulating in the area where the land is situated):

On the following date (which must not be earlier than 21 days before the date of the application):

Signed - Applicant: Or signed - Agent: Date (DD/MM/YYYY):