draft meeting conclusions

9
Draft meeting conclusions From the chairs

Upload: howard-walker

Post on 30-Dec-2015

24 views

Category:

Documents


0 download

DESCRIPTION

Draft meeting conclusions. From the chairs. Focus next year. HM/POPs Scientific Review PM follow up Updates Task group, ancillary data Possible link to NEC directive revision and LRTAP negotiations Capacity building. Reporting. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Draft meeting conclusions

Draft meeting conclusions

From the chairs

Page 2: Draft meeting conclusions

Focus next year

• HM/POPs– Scientific– Review

• PM follow up– Updates– Task group, ancillary data– Possible link to NEC directive revision and

LRTAP negotiations

• Capacity building

Page 3: Draft meeting conclusions

Reporting

• Will propose for next meeting a time table for revisions of reporting guidelines– Taking into account need for further harmonisation

• MSC-W is encouraged to further develope REPdab and WEBdab

• Options for NFR extensions– To increase transparency

• In particular for HM, POPs and PM

– Proposed as additional reporting (not requirements)

Page 4: Draft meeting conclusions

Review

• Agreed to have an annual review procedure• Some Parties expressed concerns with resource

requirements, that will be brought forward• Encourge synergies with UNFCCC process,

– Timing and common data

• Agreed on a procedures, methods and timing, including consultations with Parties, feedback and resubmissions of data for a S&A– Annexed to chairs report– Report to EMEP SB

Page 5: Draft meeting conclusions

Review (cont.)• IIR

– Short-term: integrate into templates certain aspect (notation keys, explanation and fuel issues)

• Not required as minimum reporting

– Suggestions on draft format. Comments welcome within 19.11 to KK. Will be available for use.

• Agreed on improvements of the templates– Prefilled Nas– Clarifications on notation keys– New totals according to WGSR– New memo item for inland shipping– Options for aggregating 1A and 1B

Page 6: Draft meeting conclusions

Review (cont.)

• Will explore options for detailed review models– Taking into account other processes, e.g.

UNFCCC and twinning projects/share of experience

– Cost-effectiveness!

• Recognised the need for review both for monitoring progress towards targets and policy development

Page 7: Draft meeting conclusions

PM workshop

• The TF appreciated the input from the workshop– Pointed out needs for updating the GB,

especially missing sectors– Resource needs for these updates– PM Task group to assess for modeller needs

Page 8: Draft meeting conclusions

Guidebook

• Need for resources– PM demands– IPCC demand for updates– Needs to follow the pace of increased reporting

requirenents• EFDB

– Further exploring the prospects of developing an EFs or linking to existing initiatives

• Need for link to EPER PRTR processes– Methodologies, reporting and dissemination

Page 9: Draft meeting conclusions

Capacity building

• Need to identify obstacle in some countries– Financial and institutional– Need further consideration

• Twinning projects• Training• Link to review process

• Consider funding to bring countries together before next meeting