Empirical Results from the Transformation of a large Commercial Technical Computing Environment Dr. Rahul Razdan

Upload: others

Post on 20-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Empirical Results from the Transformation of a large Commercial Technical Computing Environment

Dr. Rahul Razdan

Page 2: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Outline

• Context

• Requirements

• Analysis and Project Launch

• Solution Architecture

• Results

• Future Work

Page 3: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Context

• Industry: Electronics Design Automation ($4B):

– Design Tools for Semi-Conductor Design($250B)

– Industry Norms: complexity, release management, M&A

• Group: Hardware Virtual Modeling

– Features: Run-time Performance, Infrastructure for Virtual

Experiments (Modeling, Testing, Coverage, Project Management)

– Four Sites, 250 developers, most advanced degrees, 3 recent mergers

Page 4: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:
Page 5: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:
Page 6: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Compelling Reasons for Change

• Acquisitions and Growth Impact

• Globally-distributed software development teams

• Expanded Product Line with new capability

• Introduction of newly-supported platforms

• Not organized for growth:

– Internally – product focused versus infrastructure focused

– Externally – new verification languages, OS changes

Page 7: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Environment: Technical Computing

• Run-Time Performance

• Customer Responsiveness

• Innovation

• Multiple Platforms/Release Cycles

• Limited Skilled Developers

Page 8: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Outline

• Context

• Requirements:

• Analysis and Project Launch

• Solution Architecture

• Results

• Future Work

Page 9: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

SW Development Heartbeat

• Core SW Development:

– Build-Link-Validate Cycle

– Scaled for developers across geographies

– Scaled for multiple steams

• Accelerating Time-to-market or Increasing Quality involves fundamental restructure

of this core process across the enterprise.

• Measure with metrics

S

C B T

TriageBugs

CollectReqs

U

U

U

C B T

C B T

B TMerge

Page 10: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Enterprise-Wide Process MetricsOptimizing All Aspects of Productivity

• Productivity:

– time to first test

– incremental time to create new tests

– coverage/day

– gates/functions verified/engr mm

– time to derivative environments

• Predictability:

– total coverage

– coverage convergence rate

– bug convergence rate

– project resource & convergence stats• to plan next project better

• Quality:

– # respins

– # functional bugs ID'd in post silicon

– # field recalls

– breakout of hardware vs. software bugs

• Human Resource Utilization:

– % reuse of verification plans

– % reuse of verif’n environments

– % reuse of verification components

• Compute Resource Utilization:

– % of sims running 24x7

– cycles used for last 10% coverage

• Best Practices Deployment:

– Automation deployment level• block, chip, system, project levels

– Verification maturity scale

• Directed testing

• Automated testing

• Coverage driven

• Scalable coverage driven

– Reuse

Page 11: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Observations

• Issues:

– Release Planning Ad-hoc

– Test infrastructure large, complex, and difficult to handle with IT

environment (ex: performance)

– Coordination between sites very difficult

– Release management error-prone and high stress

– PV, CM, and PM not tier-one career paths

• Solutions: No commercial solutions available

Page 12: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Project Launch

• Organizational Decisions:

– Integration of PV, CM, and PM under GM (not popular)

– Develop a separately resourced project for infrastructure

• Project Launch:

– Pull two key architect level individuals for this work (very unpopular)

– Resource appropriately to do the job (capital, services)…many skeptics in

finance organization

– Explicitly manage the process of change

Page 13: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Outline

• Context

• Requirements:

• Analysis and Project Launch

• Solution Architecture

• Results

• Future Work

Page 14: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Environment Maturity Model• Motivation (the why) drives

downward from the upper

layers to trigger change

• Implementation and process

schema (the how) provide the

foundation for the model

Development

Environment

Development

Processes

Business

Processes

Infrastructure

Solutions

Page 15: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Foundations• Central storage structure

• Common language (Perl)

• Core modules

– Command-line processing

– Messaging and logging

– Common parsing framework

– Site customization

– Object Data Definitions

– Platform classification

Page 16: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Infrastructure and Policies• Infrastructure

– Fault-tolerant central storage

– Robust local network

– Controlled image configurations

– Dedicated servers

– Monitoring & Management

• Policies

– Managed growth

– Defined API for tools

– Resource management

Page 17: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Configuration Management• Tools

– ClearCase

– MultiSite

• Resources

– Central VOB/View servers

– Central registry and licensing servers

• Methodology

– Branching and Merging

– Trigger conventions

Page 18: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Project/Variant• Context for developer activity

– Policy-based control

– Standard build/install

• Managed data

– Dependency kits

– User environment

– Build components

– Project policy

– Configuration Management

– Testing environments

Page 19: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Server Farm• Foundation

– Hardware

– Tools

– DRM (eg LSF)

• Services

– Meeting the user need

• Bridging the gap

– Management services

– BuildJob

– TestJob

– AutoControl sequencing

Page 20: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

KitExchange• Inter-project collaboration

– Software integration

– Distributed build support

– Development merge support

• Managed Data

– KitExchange meta-data

– Content depots

• Flexible Architecture

– Communication plugins

– Fall-back data sources

Page 21: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Development Processes• Coordination

– Merge schedules

– External dependency validation

• Quality

– Perpetual release readiness

• Release Engineering

– Decision criteria

– Unified Release

• Applied Governance

– Control and measurement

– Policies to address internal and external

compliance

– Drive consistency and best practices

– Benefits-driven model

Page 22: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Business Processes• Early Adopter engagements

• Requirements gathering

• Product release model

• Solutions integration

Page 23: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Results after 6 years

• 6.6 million avg daily tests [10.2 million

peak]

• 349 projects

• 7 sites [plus other satellite locations]

• 270 R&D/PV engineers

• 7 release streams [current and future]

• 2187 cpu [1041 hosts] server farm

200,000 avg daily tests

Unknown # of projects

1 site

80 R&D/PV engineers

3 release streams

? cpu [? hosts] server farm

Before After

Scaling capability while growing customer satisfaction !

Page 24: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

And Less Chaos…

Page 25: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:
Page 26: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:
Page 27: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Outline

• Context

• Requirements:

• Analysis and Project Launch

• Solution Architecture

• Results

• Future Work

Page 28: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

SW Integration Efforts Outweigh Pure HW

Factors into productivity, quality, predictability risks

10

4

1

Application

Middleware

OS

Firmware

HW

Solution

Whole ProductView

HW Mgr

SW Mgr

TeamRatios

The Desired Process

Software

Hardware

Chip

Design Phase

Concurrent Flow

Design BuildHW Integration

& Debug

CodeDesign

System

Integration

& SW Debug

Chip Debug FabDesign

The Process Today

Design Code

System

Integration

& Debug

Chip Respins

Design Phase Sequential Flow

FabDesign Chip

Debug

Software

Hardware

Chip

Design Build

Hardware

Integration

& Debug

Page 29: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Cadence & IBM Joint Customer Solution View

Design to Silicon

System Validation, Logic Signoff

SW Design,

Debug, and

Environment

HW Design,

Verification,

Implementation

System Level Design & Verification

Design & Verification Plan to Closure

System Wide Management

Verification Engineers

HW Design Engineers

System Validation Engineers

Embedded SW Developers

Exec & Project Manager

System Engineers

Embedded

SoftwareSoC

Verification

MethodologyLifecycle

Automation

Page 30: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Lessons Learned• Treat as a whole system – cannot look at piece parts

• Swallow hard and make the decision to go for it – it

must be central to the business

• Need to make the investment with the right focus

• Processes developed internally can open the door for an

infrastructure element in the products delivered to your

customers – leads to opportunity for IBM and Cadence

to partner further to deliver to the industry

• It’s not pie-in-the-sky. It works !!

Page 31: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

Questions

Page 32: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

32

NC-Verilog

P0 Activity on Previous

Releases

Page 33: Dr. Rahul Razdan€¦ · Dr. Rahul Razdan. Outline •Context •Requirements •Analysis and Project Launch •Solution Architecture •Results •Future Work. Context • Industry:

33

Customer Support Summary

• Overall Volume is decreasing and

resolution time is improving.

– Total number of days that support

cases are outstanding in August is

about a third of what it was in

June (6400 vs 17,000).

– Calls not resulting in a PCR is

down to 7.96 days. Calls

resulting in PCRs still high at

57.2 days.

• Satisfaction survey results

improved slightly in August.

115139 131 115 135

108 12298

88

105 104 114105

9190

67

38

43 57 4955

55 45

35

71

69 6468

63

50 43

71413

471 489 473500

408

283

10

12 3 51

4 6

2

2020

26

19

2220

14 15

19

1716 16

1515

12

-10

-5

0

5

10

15

20

25

30

0

100

200

300

400

500

600

Ju

n-0

1

Ju

l-01

Au

g-0

1

Sep

-01

Oct-0

1

No

v-0

1

Dec-0

1

Jan

-02

Feb

-02

Mar-0

2

Ap

r-02

May-0

2

Ju

n-0

2

Ju

l-02

Au

g-0

2

Other

SourceLink

Manual

E-Mail

Phone

Avg Calls/Day

511

6 36 5 5 7

13

36

23 2325

30

34

23

6

31

49 4142

34

25

32

6.26 6.29 6.266.13

66.13

5.65 5.98

0%

20%

40%

60%

80%

100%

Jan-02 (24) Feb-02 (78) Mar-02 (78) Apr-02 (67) May-02 (73) Jun-02 (69) Jul-02 (64) Aug-02 (62)

1

1.5

2

2.5

3

3.5

4

4.5

5

5.5

6

6.5

7

Poor<=33 Good (34-43) Excellent>=44 Average SRSI

SFV CUSTOMER SUPPORT SATISFACTION SURVEY

INCOMING YEAR TO YEAR VOLUME

SFV 2001-2002