dr. prem reddy health sciences building - end of year 2014 - update
TRANSCRIPT
Crane used in setting structural steel
Structural steel in faculty office area.
Corridor 127. Glass will fill voids between columns.
Looks out on courtyard.
Looking down corridor 127 at the rotunda area
North side of rotunda. Openings at mechanical attic for louver and entry door
Structural steel set in digital nurse lab.
Crane bringing in load of metal decking.
Steel set at workroom/admin/deans
office area.
Openings in block above are for attic louvers and
entry door
Structural steel erection at SIM lab areas.
Steel at SIM lab. Steel for sloped roof being set.
The pilaster columns for covered walkway
between old and new bldgs
In wall plumbing piping for faculty
restrooms.
Conduit stub ups at electrical room
Steel installed at the chemistry labs.
Future Courtyard area.
Pilasters for covered walkway connecting bldgs
Main Entrance
Student Restrooms plumbing and steel
Steel at SIM Labs
Under slab conduits for power to light being installed on pilaster
Steel set in corridor 127
Front entry, looking out to the west.
Forming up for concrete at front entry for revolving
door.
Steel in the medical supplies / beds & equipment areas
Steel set in the nursing fundamentals lab.
In SIM labs, looking towards the anatomy
classes
Interior view of front entrance of bldg.
Alcoves in front entrance hall for display cases
Metal decking install started in front entrance
Installing metal decking in front entrance
Metal decking installed at student restroom area
Iron worker welding rebar to beam
Exterior west face of bldg., north of front entry
Exterior west face of bldg., south of entrance.