dr. eustace mwarania trapos limited. cable cars for urban transport introduction to cable cars...
TRANSCRIPT
Cable Cars for Urban Transport
Dr. Eustace MwaraniaTrapos Limited
Cable Cars for Urban Transport 2
CABLE CARS FOR URBAN TRANSPORT Introduction to Cable Cars Application to Urban Transport Likoni Express Cable Project
Cable Cars for Urban Transport 3
WHAT IS A CABLE CAR (1/2) Aerial lift with cabins supported and propelled by
steel cables Cable strung between two stations, sometimes with
supporting columns, driven by motorized wheel at terminal (speeds up to 30km/hr)
Cabins carry up 40 pax; multiple cars (gondolas) on the same cable
Short transit distances (less than 10km)
Cable Cars for Urban Transport 4
WHAT IS A CABLE CAR (2/2) Types
Monocable (load and drive on one cable) Bicable (load on one cable, drive on other) 3S (latest, load on two cables, drive on one)
Designed for use in ski resorts 30 years lifetimes Technology tested and proven in adverse conditions Urban centre conditions less challenging
Examples of cable car systems in urban areas
Cable Cars for Urban Transport 5
Cable Cars for Urban Transport 6
Cable Cars for Urban Transport 7
Cable Cars for Urban Transport 8
Cable Cars for Urban Transport 9
Cable Cars for Urban Transport 10
BENEFITS OF CABLE TRANSIT (1/2) Ease in passing over barriers (jump over)
Water Existing buildings
Dedicated barrier-free routes No competition with ground systems
Rapid installation and low costs 3km line Euro @ 20-30m; less than 12 months construction
No waiting time- cabins leave every 20-30 seconds Impressive speeds (upto 27 km/hr guaranteed)
Westlands stage –GPO (3km) takes 7 minutes @7.5m/s At 5500 pax per hour either direction equivalent to 110 articulated
100 seater buses
Cable Cars for Urban Transport 11
BENEFITS OF CABLE TRANSIT (2/2)
High efficiency Staff man only terminals Adjusts to traffic fluctuations by reducing no of cabins or line
speed Saves space
Only support columns required on ground Low carbon footprint Examples in Rio, Venezuela, London, Koblez Lagos project underway at USD 500M live 2015
Cable Cars for Urban Transport 12
Koblenz Video Clip
Cable Cars for Urban Transport 14
LIKONI CABLE EXPRESS PROJECT Current situation Cable solution Benefits
Cable Cars for Urban Transport 15
SITUATION AT LIKONI CROSSING 300,000 commuters need to get on and off island daily Ferry service the only access with serious issues
Limited capacity, waiting time 30min- 2 hours or more per direction
Tourists affected making south coast unattractive destination Development of entire area severely limited by lack of
efficient connection Over 100 lives lost in several deadly accidents
Site specific conditions make bridge and tunnel unfeasible Habour access requires high clearance bridge Narrow channel (600m) makes tunnel not possible
Cable system is an ideal solution to site specific restrictions.
Cable Cars for Urban Transport 16
PROPOSED SYSTEM: CABLE ALIGNMENT
Cable Cars for Urban Transport 17
KEY ASPECTS 100m towers at both ends of ocean holding cable at 80m ,
length 1370m; 3S technology Cable speed 7.5m/s crossing time 3min 40 sec Capacity 5500pax per hour per direction; 28 cabins each
38 persons Power 430kw max (200kw running) Operation for 16 hours per day (others tourism related) Investment value Circa Euro 70M Fares K.Sh 100 inflation linked
Cable Cars for Urban Transport 18
BENEFITS Fast, affordable crossing for everyone Landmark installation with far reaching scenic views +
20km Nonstop all weather operations (windspeeds +100kph) Creation of 50 permanent jobs of all categories of
employees of cable company (200 during construction) Cable company will be a meaningful tax payer Millions of hours of commuters and tourists time saved
each year Value land on either side of Likoni will be substantially
enhanced Will have converted an obstacle into a resource
Cable Cars for Urban Transport 19
PROJECT PARTNERS
Public Private Partnership Project Technology, Dopplemayr (Austria/Swiss) Finance, Africa Infrastructure Investment Managers (SA) Feasibility, Cable Car Development (Canada/Swiss)
Cable Cars for Urban Transport 20
TIMELINES Urgent need for efficient, reliable and safe crossing PPP matters : 6-9 months Implementation period 12-18 months System could be up end 2015 and is Digital!!
Cable Cars for Urban Transport 21
THE END