Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods and Techniques in Planning and Programming of Construction Projects by Dr. Alaattin Kanoğlu SPRING 2012-13

Upload: kaitlynn-hosler

Post on 31-Mar-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH.

I.B.U.ARCHITECTURE UNDERGRADUATE

PROGRAM

ARCH472 PROFESSIONAL PRACTICE MANAGEMENT

Basic Steps, Rules, Methods and Techniques in

Planning and Programming of Construction Projects

by

Dr. Alaattin Kanoğlu

SPRING 2012-13

Page 2: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 2

• The meaning and importance of project planning andprogramming function in construction management

• Decision levels in project planning and programming

• Project Planning and Programming Process in OperationalLevel

• The Techniques being used for Project Planning andProgramming

– Barcharts

– Line of balance diagrams

– Network Diagrams

CONTENT

Page 3: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 3

Definition of Project Planning and Definition of Project Planning and Project Programming ConceptsProject Programming Concepts

• Project Planning; means breaking down the project into the activities that must be fulfilled to realize the project; defining the type of relationships (predecessors and successor activities) between these activities; visualizing the activities and logical relations.

• Project Programming; means calculating early and late start-finish dates for the activities and for the project by assigning the duration of activities.

Page 4: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 4

Decision Levels in Project Planning and Programming

Stratejik

Taktik Düzey

Operasyonel Düzey

Düzeystrategic

level

tactical level

operational level

Page 5: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 5

Aims of Project Planning and Programming

• to be able to foresee the problems that may occur at the beginning or consecutive stages of project and study on probable solutions in advance.

• to warn the management staff about the potential problems and related activities instead of the others.

• to provide the information related to cash flow that is vital for the finance of project.

• to provide the information related to effective use of the resources by minimizing the idle time of equipment and labors.

Page 6: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 6

• to provide the information related to resources required by activities .

• to provide the information for revising the schedule by considering the progress, delay and revised targets; to help the schedule that tends to derive from target to be revised.

Aims of Project Planning and Programming

Page 7: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 7

Project Planning and Programming Techniques

• Bar Charts-Gantt Charts

• Line of Balance Diagrams

• Network Diagrams

• Arrow Diagrams

• Precedence Diagrams

Page 8: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 8

BARCHARTS

KAZI

TEMEL

TAÞIYICI S.

DUVARLAR

KALORÝFER

DOÐRAMA

ELEKTRÝK

SU TESÝSAT

ÝNCE YAPI

BÝTÝRMELER

OCAK ÞUBAT MART NÝSAN MAYIS HAZÝR TEMM AÐUST EYLÜL JAN FEB MAR APR MAY JUN JUL AUG SEPACTIVITY A

ACTIVITY B

ACTIVITY C

ACTIVITY D

ACTIVITY E

ACTIVITY F

ACTIVITY G

ACTIVITY H

ACTIVITY I

ACTIVITY J

Page 9: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 9

LINE OF BALANCE DIAGRAMS

2

3

1 2 3 4 5 6 7

1

4

ekip 1

ekip 1

ekip 2

ekip 2

ekip 1

ekip 1

ekip 1

ekip 1

8 9 10 11 12 13 14 15 16 17 18 19 20

Birim

Süre

unit

duration

team-2

team-1

team-2

team-1

team-1

team-1

team-1

team-1

Page 10: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 10

LINE OF BALANCE DIAGRAMS

unit

2

3

1 2 3 4 5 6 7

1

4

8 9 10 11 12 13 14 15 16 17 18 19 20

Birim

Süre

Kazý Temel Kaba Yapý Doðramalar Elektrik T. Su TesisatýÝnce Y.Bitirme

Proje Bitiþ Süresi20 Ay

project completion time 15months

plumbing

finishings

infrastruct.

carpentry

found.excavation

electrical

plaster

duration

Page 11: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 11

LINE OF BALANCE DIAGRAMS

2

3

1 2 3 4 5 6 7

1

4

8 9 10 11 12 13 14 15 16 17 18 19 20

Birim

Süre

Kazý

Temel

Kaba Yapý

Doðramalar

Elektrik T.

Su Tesisatý

Ýnce Y.

Bitirme

Proje Bitiþ Süresi

15 Ay

duration

unit

project completion time 15 months

plumbing

finishings

infrastruct.

carpentry

foundat.

excavation

electrical

plaster

Page 12: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 12

PRECEDENCE DIAGRAMS

18 25

KAZI YAPILMASI

100015

NOTASYON

Eylemin en erken baþlama zamaný

Eylemin en geç baþlama zamaný

Eylemin kod no.'su Eylemin süresi (gün)

C 5

Ara zaman (Lag or Lead time)

Ýliþki tipi

Eylemin diðereylemle mantýksaliliþkisi

EXCAVATION

NOTATION

early start date of activity

late start date of activitylag time

logical relationship to successor activity

activity ID duration of activity

type of relationship

Page 13: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 13

PRECEDENCE DIAGRAMS

TYPES OF ACTIVITY RELATIONSHIPS1. C (Conventional) Type: Finish-to-Start relationship (Lag time = 0)

0KAZI YAPILMASI

10C 0

10TEMEL KALIBI Y.15

1000 1010

KAZI YAPILM.

TEMEL KALIBI Y.

0 10 25TBAÞL. = K BAÞL.+ K SÜRE

+ ARA ZAMAN

TBAÞL. = 0+10+ 0 =10. gün

EXCAVATION 10

FOUND.FRMWK 15

FOUNDAT. FORMWORK

EXCAVATION

FSTART=ESTART + EDUR

+ LAGTIME

FSTART= 0

+10+0=10

Page 14: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 14

PRECEDENCE DIAGRAMS

TYPES OF ACTIVITY RELATIONSHIPS

1. C (Conventional) Type: Finish-to-Start relationship (Lag time> 0)

POURING CONC 2

RELEASING FRMW 2

POUR. CONCRT

FSTART=CSTART

+

CDURATION

+ LAG TIME

FSTART= 20+2+7 = 29

RELS. FRMW

Page 15: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 15

TYPES OF ACTIVITY RELATIONSHIPS

2. S Type: Start-to-Start relationship

PRECEDENCE DIAGRAMS

BRICKWRK 15

PLASTER 30

BRICKWORK

PLASTER

PSTART=BSTART

+LAGTIME

PSTART=30+6 =36

Page 16: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 16

PRECEDENCE DIAGRAMS

36SIVA YAPILMASI

30

F 3 54DUVAR KAÐIDI Y.

153000 3010

SIVA YAPILMASI

36DBAÞLAMA = S BAÞL.

+ ARA ZAMAN

DBAÞLAMA. = 36 + 30 + 3 - 15 DUVAR KAÐIDI

54 66 69F3

3 gün

+ S SÜRE

- D SÜRE

= 54. gün

TYPES OF ACTIVITY RELATIONSHIPS

3. F Type: Finish-to-Finish relationship

PLASTER 30

WALLPAPER 15

PLASTER

WALLPAPER

WSTART=PSTART

+

PDURATION

+

LAGTIME - WDURATION

WSTART=36+30+3 -15=54

Page 17: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 17

TYPES OF ACTIVITY RELATIONSHIPS

Rule 1. If finish-to-start type relationship is an obligation between two activities, i.e. these two activities can not be overlapped, a Conventional (finish-to-start) type relationship must be assigned between them. The lag time is determined due to characteristics of each activities.

1

2

1 2 3 4 5 6 7

3

8 9 10 11 12

Birim

Süre

C1duration

unit

Page 18: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 18

TYPES OF ACTIVITY RELATIONSHIPS

Rule 2. If finish-to-start type relationship is not obligatory between two activities, i.e., they both can be overlapped, and the duration of successor activity is longer than that of predecessor activity, then start-to-start type relationship can be assigned between these two activities. Lag time is determined as the duration of realizing the production of (1,2,3...n) units of predecessor activity or determined due to the characteristics of activities.

1

2

1 2 3 4 5 6 7

3

8 9 10 11 12

Birim

Süre

Duvar Örülmesi Sýva Yapýlmasý

6 gün

9 gün

S2

9 days

plasterbrickwork

6 days

duration

unit

Page 19: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 19

TYPES OF ACTIVITY RELATIONSHIPS

Rule 3. If finish-to-start type relationship is not obligatory between two activities, i.e., they both can be overlapped, and the duration of predecessor activity is longer than that of successor activity, then start-to-start type relationship can be assigned between these two activities. Lag time is determined as the duration of realizing the production of (1,2,3...n) units of successor activity or determined due to the characteristics of activities.

1

2

3 4 5 6 7

3

8 9 10 11 12

Birim

Süre

Sýva Yapýlmasý

9 gün

Duvar Kaðýdý

6 gün

F2

2 13

wallpaper

plaster

duration

unit

9 days

6 days

Page 20: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 20

TYPES OF ACTIVITY RELATIONSHIPS

Rule 4. Finish-to-finish type relationships cause the delay of start date of next activity (see electrical appliances) that has a start-to-start type relationship with the successor. Thus, the team that fulfills the successor activity naturally will be idle for some time. The solution is balancing the speed of this activity (see wallpaper) by reducing the number of laborers in the team.

1

2

3 4 5 6 7

3

8 9 10 11 12

Birim

Süre

Sýva Yapýlmasý Duvar Kaðýdý

2 13

Anahtar Montaj

x

y

Anahtar Montaj

Boþ

Boþ

idle

idle

plaster

wallpaperappliances

appliances

duration

unit

appliances

Page 21: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 21

PRECEDENCE DIAGRAMS

A B0 10

10 5

15C 20

35

15D

E

0+10=10 15+20=35 > 15+10=25

10

100 110

120

130

140

THE ALGORITHM OF CRITICAL PATH METHOD - CPM

1. STEP: Forward pass: Calculation of Early Start Dates of activities.

Page 22: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 22

PRECEDENCE DIAGRAMS

C (20 gün)

D (10 gün)

15 25

E (5 gün)

35 40

THE ALGORITHM OF CRITICAL PATH METHOD - CPM1. Rule: If an activity is the successor of more than one chain of activities then, early start date of the activity equals to the duration of the longest path. That’s why the greatest value that corresponds to the total duration of the longest path prior to that activity is chosen.

Explanation: Activity C and activity D must be completed to be able to start activity E. At the end of day 25 activity D is completed but C is not. Activity E can only start at the end of day 35.

C (20 days)

D (10 days) E (5 days)

Page 23: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 23

PRECEDENCE DIAGRAMS

THE ALGORITHM OF CRITICAL PATH METHOD - CPM

2. STEP: Backward pass: Calculation of Late Start Dates of activities.

A B0 10

10 5

15C 20

35

15D

E

10

0 10

15

25

35

100 110

120

130

140

35-10=25

35-20=1525-5=20 > 15-5=10

10-10=0

Page 24: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 24

PRECEDENCE DIAGRAMS

THE ALGORITHM OF CRITICAL PATH METHOD - CPM2. Rule: The total value of the late start date of an activity and durations of chains of successor activities can not be greater than the early start date of the last activity in network. That’s why minimum value is chosen in backward-pass.

Explanation: Assume that late start date of activity B is the greater value (20). Then, the earliest date that activity E can start is 45th day and the completion time of the project is 50th day. If the minimum value (10) is chosen, then the project will finish in 40 days.

C (20 gün)

D (10 gün)

15 25

E (5 gün)

35

B (5 gün)

10 40DOÐRU

YANLIÞ 20 25 35 45 50

TRUE

FALSE

B (5 days)

C (20 days)

D (10 days) E (5 days)

Page 25: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 25

PRECEDENCE DIAGRAMS

BASIC CONCEPTS OF CRITICAL PATH METHOD - CPM

CRITICAL ACTIVITY: The activity, that cause a delay in schedule and increases the completion time of project; that has zero total float; that has an early start date which is equal to the late start date.

CRITICAL PATH: The longest path in network formed by the critical activities. The chain of activities that has zero total float. The chain that determines the completion time of project.

FLOAT: The limit of delay that is allowed for a certain activity. The maximum delay for an activity that does not affect the project completion time.

Page 26: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 26

C (20 gün)

D (10 gün)

15 25

E (5 gün)

35

B (5 gün)

10 40

20 25 35 45 50

Bolluk10 gün

PRECEDENCE DIAGRAMS

FLOAT10 days

B (5 days)

C (20 days)

D (10 days) E (5 days)

Page 27: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 27

PRECEDENCE DIAGRAMS

A

B D

F

C E

S1

C1

F2

C0

C0

C0

S2

2

4

2

3

1

1

EXERCISE

Page 28: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 28

PRECEDENCE DIAGRAMS

A

B D

F

C E

S1

C1

F2

C0

C0

C0

S2

2

4

2

3

1

10

1 5

3 5

8

EXERCISE STEP 1: Forward Pass for Early Start Dates

Page 29: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 29

PRECEDENCE DIAGRAMS

A

B D

F

C E

S1

C1

F2

C0

C0

C0

S2

2

4

2

3

1

10

1 5

3 5

80

3

5

6

2

8

EXERCISE STEP 2: Backward Pass for Late Start Dates

Page 30: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 30

PRECEDENCE DIAGRAMS

A

B D

F

C E

S1

C1

F2

C0

C0

C0

S2

2

4

2

3

1

10

1 5

3 5

80

3

5

6

2

8

EXERCISE STEP 3: Defining the critical path and floats

Page 31: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 31

8 8 8

16 16 16 16

8 8 8

A Eylemi

B Eylemi

C Eylemi 8 8

Maximum Kaynak

Kapasitesi

32

24

16

08

Adam-saat (Düz iþçi)10 2 3 4 5 6 7 8 Süre

0 1 2 3 4 5 6 7 8

8 8 8

16 16 16 16

88 8

A Eylemi

B Eylemi

C Eylemi 8 8

10 2 3 4 5 6 7 8

Maximum Kaynak

Kapasitesi

32

24

16

08

Adam-saat (Düz iþçi)

0 1 2 3 4 5 6 7 8

RESOURCE LEVELING

Page 32: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 32

RESOURCE LEVELING

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Süre

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Süre

Kaynak Kullaným Profili

Kaynak KullanýmProfili

Yýðýþýmsýz (Non-cumulative)

Yýðýþýmlý (Cumulative)

Adam-saat

Adam-saat

S Eðrisi

08

16

24

32

40

48

Düz iþçi

100

200

300

400

500

600

Düz iþçi

Resource requirement graph (cumulative)

Laborer mhr

Laborer mhr

S curve

Resource requirement profile (non-cumulative)

duration

duration

Page 33: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 33

COST PLANNING

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Süre

Gerçekleþen Üretimin Parasal Karþýlýðý

Yýðýþýmsýz (Non-cumulative)

Maliyet

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Süre

A EylemiB EylemiC EylemiD EylemiE EylemiF Eylemi

Çubuk Diyagram

Earned Value Histogram (non-cumulative)

Barchart

Cost

Duration

Duration

ACTIVITIES

Page 34: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 34

COST PLANNING

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Süre

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Süre

Gerçekleþen Üretimin Parasal Karþýlýðý

Gerçekleþen Üretimin Parasal Karþýlýðý

Yýðýþýmsýz (Non-cumulative)

Yýðýþýmlý (Cumulative)

Maliyet

Maliyet

S Eðrisi

10

20

30

40

50

60

100

200

300

400

500

600

Earned Value Histogram (cumulative)

Earned Value Histogram (non-cumulative)Cost

Duration

Duration

Cost

S curve

Page 35: Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods

Dr. ALAATTIN KANOĞLUI.T.Ü. FACULTY OF ARCH. 35

COST-TIME TRADEOFF

11 12 13 14 15 16 17 18 19 20 22 23 24 25 26 27 28 29 30 Süre

100

200

300

400

500

600

Toplam Maliyet

Dolaysýz Maliyetler

Dolaylý Maliyetler

Minimum MaliyetliProje Süresi

Maliyet

NormalProje Süresi

MinimumProje Süresi

indirect costs

direct costs

total costcost

duration

normal timeoptimum time

crash time