2
ALLOCATION OF TOTAL PROJECT HOURS
OVERALL PROJECT SUMMARY
DESIGNATION REQUIREMENT
SEPTEMBER
2015
(ACTUAL)
OCTOBER
Project-To-Date
@ 10/31/15 (est.)
RESIDENTS 40% 36% 35%
MINORITY/
FEMALE,
BY TRADE
25%
(50% Goal)37% 37%
APPRENTICE 15% 38% 38%
VETERANS 3% 5% 4%
FEMALES 5% 3% 3%
3
ALLOCATION OF TOTAL PROJECT HOURS
HARTFORD RESIDENTS – PROJECT-TO-DATE
PROJECT-TO-DATE
@ 10/31/15
WORKFORCE
@ 10/31/15
TOTAL PROJECT
HOURS75,581.8 161
HARTFORD RESIDENTS
HOURS26,161.2 49
4
ALLOCATION OF TOTAL PROJECT HOURS (As of October 31, 2015)
DESIGNATION REQUIREMENT LABORERS ELECTRICIANS
OPERATING
ENGINEERS
RESIDENTS 40% 53% 40% 20%
MINORITY/
FEMALE,
BY TRADE
25%
(50% Goal)50% 40% 8%
APPRENTICE 15% N/A 74% 11%
VETERANS 3% 4% N/A 6%
FEMALES 5% N/A N/A N/A
5
ALLOCATION OF TOTAL PROJECT HOURS (As of October 31, 2015)
DESIGNATION REQUIREMENT CARPENTERS
IRON
WORKERS MASONS
RESIDENTS 40% 32% 34% 31%
MINORITY/
FEMALE,
BY TRADE
25%
(50% Goal)33% 59% 59%
APPRENTICE 15% 41% 58% N/A
VETERANS 3% 5% N/A N/A
FEMALES 5% 5% 9% N/A
6
ALLOCATION OF TOTAL PROJECT HOURS (As of October 31, 2015)
DESIGNATION REQUIREMENT PLUMBERS
RESIDENTS 40% 5%
MINORITY/
FEMALE,
BY TRADE
25%
(50% Goal)15%
APPRENTICE 15% N/A
VETERANS 3% N/A
FEMALES 5% N/A
7
($Millions)
Total Construction Cost $35.768M
Total Set-Aside (MBE/WBE) Contract
Value Requirement$7.154M
Total MBE/WBE Contract Awards To-
Date$3.410M
Total MBE/WBE Contract Awards (%) of
Total Set-Aside 48%
MBE/WBE CONSTRUCTION COST SET-ASIDE
OVERALL PROJECT SUMMARY (20% GOAL)
8
Bid-Package / TradeQualified
Bid ResponsesContract Award
Re-Bar Installation /LaborJFC Construction
Kelly Steel
CT Rebar InstallersKelly Steel
Steel and Misc. Steel
XTX Associates
United Steel
General Welding & Fabrication
L&P Gate Co.
Erection & Welding Contractor
Berlin Steel
All Phase Steel Works
XTX Associates
Action Steel
(Structural)
L&P Gate Co.(Misc. Metals)
MasonryJoe Capasso Masonry
Acranom MasonryJoe Capasso Masonry
Foundation WaterproofingAdvanced Caulking
Armani Restoration
Advanced Caulking &
Restoration, LLC
ElevatorOtis Elevator
KoneKone
Structural PrecastBeton Fabrique Du Lac
Oldcastle PrecastBeton Fabrique Du Lac
RoofingBarrett, Inc.
Ernest Peterson, Inc.
Greenwood Industries, Inc.
Greenwood Industries,
Inc.
PROJECT BID PACKAGE REVIEW - AWARDS TO-DATE
9
Bid-Package / TradeQualified
Bid ResponsesContract Award
Fire ProtectionWolverine Fire Protection
Fire Protection Testing
K&M Fire Protection
K&M Fire Protection
(LOI)
PlumbingF&F Mechanical
P&D MechanicalUnder Review
HVACF&F Mechanical
P&D Mechanical
MPHUnder Review
ElectricalAnderson Electric
Centerplan Construction – Electrical DivisionCenterplan Construction
Electrical Division
Playing FieldSports Fields, Inc.
Liberty Landscapes, LLC
Sports Contracting Group
Sports Contracting Group
Metal Stud Framing & Drywall
Murry Enterprises
MCM Acoustics
Manganaro Northeast
TMP Construction
Manganaro
Murray Enterprises
PROJECT BID PACKAGE REVIEW - AWARDS TO-DATE
10
Bid-Package / TradeQualified
Bid ResponsesContract Award
Epoxy Flooring
Commercial Flooring Concepts
FBMW
Mackenzie Service
Stonhard Commercial Industrial Flooring
Urban Contractors
Under Review
Athletic Flooring
Commercial Flooring Concepts
FBMW
Gugliotti Associates, Inc.
Sporttech Fitness
Urban Contractors
Under Review
Flooring (Tiles & Carpet)Commercial Flooring Concepts
FBMW
Urban Contractors
Under Review
PaintingDecco International
The Mackenzie PaintingDecco International
PROJECT BID PACKAGE REVIEW - AWARDS TO-DATE
11
Bid-Package / TradeQualified
Bid ResponsesContract Award
Signage (Team)
Adams-Ahern Sign Solutions, Inc.
ArtFX Signs
Jones Signs
L&H Companies
Lauretano Sign Group
SignPro
Stadium Seating (Team)
4 Topps Premium Seating
American Seating
Ducharme Seating
Robert H. Lord
SC Railing Company
American Seating
Toilet Accessories & Partitions
C & A Distributors
Construction Specialties of New England
CT Restroom Specialties
Elite Construction Rentals
Eastern Fire Door
Door and Security Solutions, LLC
PROJECT BID PACKAGE REVIEW - AWARDS TO-DATE
12
Bid-Package / TradeQualified
Bid ResponsesContract Award
Doors, Frames & Hardware
Builders Hardware
Door and Security Solutions, LLC
Eastern Fire Door
West Hartford Lock
Eastern Fire Door
(P.O.)
Overhead & Coiling DoorsLavallee Overhead Doors
Overhead Doors of HartfordUnder Review
Aluminum Entrances & Storefronts
Massey’s Plate Glass
Acorn Glass
Westport Glass
J&G Glass
Acorn Glass
LouversAirolite
Buckley AssociatesRe-Design
Food Service (Team)
Curtis Restaurant Supply
Duray
Kitteredge Food Service Equipment
Stafford-Smith
Warehouse Store Fixtures
Duray
Scoreboard (Team)
Daktronics
LSI-Industries
Mitsubishi Electric Power Products
Panasonic
YESCO
Panasonic
PROJECT BID PACKAGE REVIEW - AWARDS TO-DATE
13
Bid-Package / TradeQualified
Bid ResponsesContract Award
Fire AlarmAnderson Electric
Electrical Power Solutions
Siemens
Centerplan Electric
Centerplan Electric
AV, DTV & Broadcast Cabling
AVI-SPL
Electrical Power Solutions
Ford AV
Metropolitan Interactive
North American Theatrix
Under Review
Video ProductionDaktronics
Media Support Group
Metropolitan Interactive
Under Review
Portable Food Cart (Team)
Carriage Works
All Star Carts
Corsair Display
Carts of Colorado
Surveillance & Security SystemAnderson Electric
Reed Hill
MSS Electronics
Under Review
PROJECT BID PACKAGE REVIEW - AWARDS TO-DATE
14
Bid-Package / Trade Release Date/Due Date
Lockers
Specialty Doors
Safety Netting
Wood in Millwork/Metals to Bid
Included in Misc Metals
NOV. 10th/Nov.23rd
BID SCHEDULE 30 DAY LOOK-AHEAD
15
16