Transcript
Page 1: Writing Work Method Statement Plain English Guidelines 0231

New South Wales Government

GUIDELINES FOR WRITING

WORK METHOD STATEMENTS IN PLAIN ENGLISH

WorkCover. Watching out for you.

GUIDELINES FEBRUARY 1998BUILDING AND CONSTrUCTION INDUSTry

Page 2: Writing Work Method Statement Plain English Guidelines 0231

DisclaimerThis publication may contain occupational health and safety and workers compensation information. It may include some of your obligations under the

various legislations that WorkCover NSW administers. To ensure you comply with your legal obligations you must refer to the appropriate legislation.

Information on the latest laws can be checked by visiting the NSW legislation website (www.legislation.nsw.gov.au) or by contacting the free hotline

service on 02 9321 3333.

This publication does not represent a comprehensive statement of the law as it applies to particular problems or to individuals or as a substitute for

legal advice. You should seek independent legal advice if you need assistance on the application of the law to your situation.

© WorkCover NSW

Page 3: Writing Work Method Statement Plain English Guidelines 0231

Contents

Page

IntroduCtIon 2

Part a 3

Suggested proforma 4

Proforma for work method statements 6

Part B 8

Points to remember when writing work method statements in plain English 8

Seven ways to write effectively 9

1) Write out the job procedure step by step 9

2) Use active, not passive voice 10

3) Sequence ideas logically 10

4) Keep sentences short and clear 11

5) Choose words carefully 12

6) Use verbs not nouns 13

7) Consider layout and formatting 13

Alternatives to writing 14

referenCes 15

aPPendICes 16

Appendix 1 Formal words and long winded phrases 16

Appendix 2 Redundancies - unnecessary repetitions 18

Appendix 3 Verb forms for commonly used nouns 19

Appendix 4 Checklist - writing effective work method statements 20

1

Page 4: Writing Work Method Statement Plain English Guidelines 0231

IntroduCtIon

Why do we need work method statements?

The purpose of a work method statement is:

• tooutlineasafemethodofworkforaspecificjob

• toprovideaninductiondocumentthatworkersmustreadandunderstandbeforestartinga

job

• tomeetlegalrequirements,thatis,hazardidentificationandcontrol

• toprogramwork,materials,time,staff,andtoanticipatepossibleproblems

• touseasatoolinqualityassurance.

Remember that a work method statement is part of a site safety plan. This plan should

include:

• InductionTraining

• RegisterofHazardousSubstances

• WorkMethodStatement

• OHSProcedures

• ResponsibilitiesFlowChart

• RehabilitationPolicy.

ThereisagrowingneedforcompaniestowriteworkmethodstatementsinplainEnglish.These

procedures must be readily understood by all employees, including employees with low literacy/

numeracyskills.Theaimofthisdocumentistoprovideyouwithideasandsuggestionstohelp

youwriteworkmethodstatementsinaneasytoreadstyle,thatis,inplainEnglish.

Ifyoutaketimeandcaretoprepareclearandconcisesitespecificworkmethodstatementsyou

cansaveyourcompanyvaluabletimeandmoney.Thesesavingsreturngreaterprofits.

We hope that the suggestions in this booklet will assist writers of work method statements to

uselanguageandformattingthatisconcise,clearandeasilyunderstood.

2

Page 5: Writing Work Method Statement Plain English Guidelines 0231

Part a:

suggested proforma

Theproformaonthefollowingpagescoversallthemainpointsrequiredbymajorcontractors

andthelaw.Initwehavesuggestedwaysoffillingineachsection.

explaining the proforma

Writeallyourworkmethodstatementsafterconsultingtheworkerswhoaregoingtousethem.

Youmaythenneedtoredraftthemtoincludetheirsuggestions.Theymayseeabetterand

saferwayofdoingthejob.

Workers will be more willing to take ownership of the documents and act on them if they

participateinplanningandwritingthem.

WedesignedtheproformatofitA4paper.Itisdoublesided.Thisovercomestheproblemsof

havingmorethanonesheetofpapertodealwith.However,youcouldaddextrapagesifthere

isnotenoughspaceinanyonesection.

Intheproformatheprocedures,possiblehazardsandsafetycontrolsareprintedsidebyside.

Thiswillmakeiteasierforyoutoconsiderthepossiblehazardsforeachstep.Thenyoucan

decideontheappropriatecontrolstoovercomeeachhazard.

All employees should be aware that there are work method statements and that they must see and sign them.

3

Page 6: Writing Work Method Statement Plain English Guidelines 0231

4

sign

ed o

ff:

___

____

____

____

____

____

____

____

dat

e: __

____

____

____

____

____

no:

___

____

___

acc

epte

d:

Yes

/ n

o

Wor

k M

etho

d st

atem

ent

(Par

t 1

) C

ontr

acto

r:

Pro

ject

:

Job

are

a:

Pro

cedu

re (

in s

teps

):

Poss

ible

Haz

ards

: sa

fety

Con

trol

s:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

Page 7: Writing Work Method Statement Plain English Guidelines 0231

5

Wor

k M

etho

d st

atem

ent

(Par

t 2

) P

erso

nal Q

ualif

icat

ions

and

exp

erie

nce:

Pe

rson

nel,

dut

ies

and

res

pons

ibili

ties:

tr

aini

ng r

equi

red

to C

ompl

ete

Wor

k:

eng

inee

ring

det

ails

/Cer

tific

ates

/Wor

kCov

er a

ppro

vals

: C

odes

of

Pra

ctic

e, L

egis

latio

n:

Pla

nt/e

quip

men

t:

Mai

nten

ance

Che

cks:

rea

d an

d si

gned

by

all

em

ploy

ees

on s

ite:

Page 8: Writing Work Method Statement Plain English Guidelines 0231

6

sign

ed o

ff:

___

____

____

____

____

____

____

____

dat

e: __

____

____

____

____

____

no:

___

____

___

acc

epte

d:

Yes

/ n

o

Wor

k M

etho

d st

atem

ent

(Par

t 1

)

Con

trac

tor:

Put

the

nam

e of

you

r or

gani

sati

on h

ere.

P

roje

ct:

Put

the

nam

e of

the

bui

ldin

g yo

u ar

e w

orki

ng o

n he

re.

Jo

b: W

rite

in

the

task

or

job

that

you

are

doi

ng.

a

rea:

P

roce

dure

(in

ste

ps):

Po

ssib

le H

azar

ds:

safe

ty C

ontr

ols:

1.

Wri

te o

ut t

he j

ob s

tep

by s

tep

Incl

ude

all

poss

ible

haz

ards

suc

h as

: Li

st a

ll sa

fety

con

trol

s su

ch a

s:

2.

Sta

rt e

ach

step

wit

h an

act

ion

wor

d. F

or e

xam

ple

• H

azar

dous

sub

stan

ces,

exp

losi

ves,

dus

t, e

tc

• M

SD

S

3.

•Fi

x ha

nd r

ail

to s

tair

wel

l w

alls

Man

ual h

andl

ing,

lift

ing

heav

ey w

eigh

ts (

15kg

?)

• W

arni

ng S

igns

4.

•Tw

istin

g, p

ushi

ng a

nd p

ullin

g, li

ftin

g an

d ca

rryi

ng

• Pe

rson

al p

rote

ctiv

e eq

uipm

ent

5.

• H

azar

ds t

o ot

hers

in

area

Fello

w w

orke

rs/p

ublic

saf

ety

prov

isio

ns

6.

•R

ubbi

sh,

elec

tric

al,

fills

Sto

rage

of

mat

eria

ls a

nd e

quip

men

t

7.

Hou

seke

epin

g

8.

9.

10.

11.

12.

13.

14.

15.

Page 9: Writing Work Method Statement Plain English Guidelines 0231

Wor

k M

etho

d st

atem

ent

(Par

t 2

) P

erso

nal Q

ualif

icat

ions

and

exp

erie

nce:

Pe

rson

nel,

dut

ies

and

res

pons

ibili

ties:

tr

aini

ng r

equi

red

to C

ompl

ete

Wor

k:

You

will

nee

d to

lis

t al

l th

e de

tails

of

Giv

e de

tails

of

the

duti

es a

nd s

peci

fic

Mak

e su

re t

hat

all

wor

kers

and

the

ir s

uper

viso

rs

qua

lific

atio

ns a

nd e

xper

ienc

e yo

u an

d yo

ur

resp

onsi

bilit

ies

of s

uper

viso

rs a

nd o

ther

ar

e tr

aine

d in

the

pro

cedu

res

need

ed t

o co

mpl

ete

wor

kers

will

nee

d fo

r th

e jo

b. I

nclu

de:

trad

e pe

rson

nel.

For

exam

ple,

des

crib

e su

ch t

hing

s as

th

e jo

b sa

fely

, ex

peci

ally

whe

re y

ou a

re u

sing

cer

tifi

cate

s, W

orkC

over

tic

kets

, de

mol

itio

n da

ily s

afet

y ch

eck

of t

he w

ork

area

by

lead

ing

new

or

chan

ged

wor

k m

etho

ds.

lic

ence

s fo

r co

ntra

ctor

. Ex

peri

ence

may

cov

er

hand

. Yo

u m

ight

lik

e to

inc

lude

on

a se

para

te

pre

viou

s w

ork

done

in

the

area

tha

t m

ay

shee

t, a

flo

w c

hart

sho

win

g th

e st

ruct

ure

of y

our

not

req

uire

cer

tifi

cate

s or

lic

ence

s.

orga

nisa

tion

and

inc

lude

the

res

pons

ibili

ties

of

ea

ch p

erso

n in

tha

t st

ruct

ure

eng

inee

ring

det

ails

/Cer

tific

ates

/Wor

kCov

er a

ppro

vals

: C

odes

of

Pra

ctic

e, L

egis

latio

n:

Giv

e de

tails

tha

t m

ight

be

requ

ired

for

dem

olit

ion,

pre

cast

pan

el e

rect

ion,

A

re r

elev

ant

code

s of

pra

ctic

e av

aila

ble

on s

ite?

Is

the

wor

k m

etho

d eq

ual

str

uctu

ral

stee

l er

ecti

on.

Cer

tifi

cate

s m

ay b

e ne

eded

for

for

mw

ork

– to

or

bett

er t

han

any

appl

icab

le c

odes

of

prac

tice

for

the

job

to

be d

one?

fal

sew

ork,

mac

hine

ry o

n su

spen

ded

slab

s, p

oint

loa

ding

on

susp

ende

d D

o pr

oced

ures

agr

ee w

ith

rele

vant

leg

isla

tion

?

sla

bs a

nd W

orkC

over

app

rova

l of

mac

hine

-fel

ling

for

dem

olit

ion

wor

k.

Pla

nt/e

quip

men

t:

Mai

nten

ance

Che

cks:

Lis

t pl

ant

and

equi

pmen

t th

at y

ou u

se o

n th

e jo

b, e

.g.

ladd

ers,

sca

ffol

d In

clud

e: m

aint

enan

ce o

n cr

anes

, fo

rklif

t, m

onth

ly c

heck

on

all

elec

tric

al

tre

stle

s, g

rind

ers,

ele

ctri

cal

lead

s an

d eq

uipm

ent,

for

mw

ork

mat

eria

ls

equi

pmen

t an

d ne

cess

ary

tags

, et

c

sho

ring

mat

eria

ls,

oxy

set,

wel

ding

mac

hine

s, f

ire

exti

ngui

sher

s, e

tc.

rea

d an

d si

gned

by

all

em

ploy

ees

on s

ite:

7

Page 10: Writing Work Method Statement Plain English Guidelines 0231

Part B:

Points to remember when writing work method statements in plain english:

“PlainEnglishisgettingaclearmessageacrosstoyouraudienceinanappropriateway.

Thismeansbeingclearaboutwhatyouwanttosay,whoyou’resayingittoandhowyou’re

goingtosayit.PlainEnglishiseffectivecommunication”.NSWAdultLiteracyCouncil

Plain english means:

• consideringthereader

• communicatingaclearmessagetothereader

• usingclear,conciselanguage

• rethinkinghowinformationispresentedsothatitattractsthereader.

Plain english does not mean:

• writinginsimpleEnglish

• usingtheminimumamountofwords

• gettingridoftechnicallanguage

• talkingdowntothereader

• losingmeaning.

Plain english has many benefits:

• Workersaremorelikelytoreadandactonwrittentexts

• Readersarelessfrustratedandviewdocumentsinamorepositiveway

• Thereislessinterruptiontoworkfromqueriesandmisunderstandings

• Documentstakelesstimetoproduce

• Safetyandqualitycanbeimproved

• Trainingiseasierandmoretimeefficient.

audience:

Keep in mind the personnel who are going to read the work method statement and consider

these questions:

• Howwelldotheyread?(educationalbackground)

• Aretheyfromanon-Englishspeakingbackground?

8

Page 11: Writing Work Method Statement Plain English Guidelines 0231

seven ways to write effectively:

NowwewilllookatsevenwaystowriteworkmethodstatementseffectivelyinplainEnglish.

Thesewillmakeyourworkmethodstatementseasiertowriteandunderstand.Thesevenways

to write effectively are:

1. Write out the job procedure step by step ............................................................ page 9

2. use active, not passive voice............................................................................ page 10

3. sequence ideas logically................................................................................... page 10

4. Keep sentences short and clear........................................................................ page 11

5. Choose words carefully..................................................................................... page 12

6. use verbs not nouns........................................................................................ page 13

7. Consider layout and formatting......................................................................... page 13

1. Write out the job procedure step by step

start each step with an action word.

set it out as shown in the Procedure Section of the Suggested Proforma on page 5.

examples

Example 1:

1. deliverallducttothesite.

2. storeinareassetasidebythebuilder.

3. Clearworkareaofallobstacles.

4. Joinductworkonfloorinlengthslessthanninemetres.

Example 2:

1. Locatecentreofeachhole.

2. Checkthateachholewouldonlypenetratetheslabthickness.

3. drillan8to10mmpilothole.

4. Insertasmallwireorrodthrougheachhole.

Example 3:

1. erect and bracecolumns.

2. erect and bracebeams.

3. tiebeamsandbracing.

4. Bridgepurlins.

5. tensionbolts.

9

Mohammad
Highlight
Page 12: Writing Work Method Statement Plain English Guidelines 0231

2. use active, not passive voice

use active, not passive voice. It is more personal and direct and specifies who must do the action.

Examples:

8 Materialsmust be removedinmanageablelots.

4 removematerialsinmanageablelots.

8 Protective gloves are to be worn.

4 Wearprotectivegloves.

8 Fork lifts must not be drivenfasterthanwalkingspeed.

4 never driveforkliftsfasterthanwalkingspeed.

8 Leadsare to be keptabovefloorlevel.

4 Keepleadsabovefloorlevel.

8 All equipment to be checked and tested.

4 Check and testallequipment.

3. sequence ideas logically

(i) Put the main idea first

Examples:

8 When you are working in a dusty and windy area, wearsafetyglasses.

4 Wearsafetyglasseswhenyouareworkinginadustyandwindyarea.

8 From the information on the plan, establishtherequiredwidthoftheformwork.

4 establishtherequiredwidthoftheformworkfromtheinformationontheplan.

(ii) Put the time phrase, if important, as a sub-heading and then the instructions in point form underneath.

Example:

When cutting, drilling or shaping glasswool insulation:

a) wear protective clothing

b) use a suitable dust mask

c) avoidcontactwithyoureyes.

(iii) try to put information in point form for clear and easy reading.

Example:

8 When compressed air jack hammers are to be employed for the purpose of excavation,

it is advisable to make certain that the air compressor is placed within as close a

proximity as practicable to the worksite and all equipment is to be fitted with suitable

apparatusfornoiseabatement.Hearingprotectionistobewornbyallemployeesatall

times and air hoses are to be fitted with snap-on safety couplings which are to be fixed to

thehosebytheuseofsafetylockingpins.

10

Mohammad
Highlight
Page 13: Writing Work Method Statement Plain English Guidelines 0231

4 When using jack hammers for excavation work:

a) place the compressor as close to the work as possible

b) make sure that the equipment is fitted with noise controls

c) wear hearing protection

d) use snap-on safety couplings on all hoses

e) fixsafetycouplingswithsafetylockingpins.

(iv) separate any extra information that may be needed to make the instruction clear. do this by putting the extra information in a highlighted box or by using italics.

Example:

Blockofffixedtypelaserbeamsbyusingabeamstop.

Safety Note

Effectivebeamstopshaveamattfinishtostopreflection.Earth,wood,plywood,brick,

mortar,concreteorplasterboardsurfacesaresuitable.

Roughenthesurfaceofmetalbeamstops.

(v) use parallel structures - that is use the same grammatical structure to express similar ideas or two or more ideas in the same sentence.

Example:

8 Topreventfalls:

• fix solid one metre high guard rail

• workers must use a safety harness

• workers wearing safety footwear

• securelycovering all floor penetrations

4 Topreventfalls:

• fix solid one metre high guard rail

• use safety harness

• wear safety footwear

• coverallfloorpenetrationssecurely.

4. Keep sentences short and clear

remember:

a) Long and/or complex sentences are more difficult to understand. they take longer to read and can hide information.

b) a sentence should contain only one or two ideas. separate ideas with lists, dot points and punctuation (commas, semi-colons, colons).

c) If you must have a long sentence (more than 18 words), follow it with a short one.

11

Mohammad
Highlight
Page 14: Writing Work Method Statement Plain English Guidelines 0231

Example:

8 Thetrainerwillensurethateachcranedriver/chaserisfullyskilledinliftingprocedures

and, most importantly, will confirm that each crane driver/chaser fully understands what his

dutiesare.

4 Trainersmustmakesurethatcranedrivers/chasers:

a) know correct lifting procedures

b) fullyunderstandtheirduties.

5. Choose words carefully

(i) don’t use too many formal words or long winded phrases. (see appendix 1)

Examples:

8 ensure

4 make sure

8 accordingly

4 so

8 without further delay

4 immediately

8 at this point in time

4 now.

(ii) avoid unnecessary repetition or redundancies. (See Appendix 2)

Examples:

8 Power to the construction site is available on an around the clock basis.

4 Powertotheconstructionsiteisavailable24hoursaday.

(iii) do not use too many nouns together - they can make the document difficult to understand because the reader must take in a lot of information in a short space.

Examples:

8 safety regulation handbook

4 handbook of safety rules

8 estimated monthly attendance performance bonus

4 monthlyattendancebonus.

(iv) avoid jargon, slang, idioms, sexist or racist terms, and foreign expressions.

Examples:

a) chippie, sparky, gofer

b) I’mbroke

c) as slow as a snail

d) foreman

e) déjàvu.

12

Mohammad
Highlight
Page 15: Writing Work Method Statement Plain English Guidelines 0231

(v) do not use contractions (short forms). they are not as strong as the words written in full.

Example:

8 Don’t

4 Donot.

(vi) Beware of acronyms (words made from initials) - you must explain what they mean the first time you use them.

Example:

Construction,Forestry,MiningandEnergyUnion(CFMEU).

(vii) spell out abbreviations to avoid confusion whenever possible. If you must abbreviate:

a) do so only when necessary, and

b) make sure that the abbreviations are understood.

Examples:

8 e.g.

4 for example

8 i.e.

4 thatis.

(viii) spell out one, two, three, four, five, six, seven, eight, nine and ten. over ten, use numbers -11,12,13 ......

(ix) use spelling from the Macquarie dictionary. It is the most suitable for australia.

6. use verbs not nouns

Be careful of turning verbs into nouns (nominalisation). this makes the document “heavy” or “academic” and hard to read.

(See Appendix 3 for a list)

Examples:

8 utilisation of backhoes on construction sites must only be done in consultation with

supervisor.

4 Consult supervisors before usingbackhoesonconstructionsites.

8 failure to comply with these directives will result in expulsion from this facility and/or

notificationoftheconstructioncompany.

4 We will expel you from this site and notify the construction company if you do not

complywiththesedirectives.

7. Consider layout and formatting

• Keep your layout open.Useplentyofwhitespace.Thismakestheproceduremore

readable.

• use no more than two separate font styles: one Bold and the other Italic.Ifyouusemore,thefinishedproductwillnotpresentwell.

13

Mohammad
Highlight
Page 16: Writing Work Method Statement Plain English Guidelines 0231

• avoid using CaPItaLs to write full words-THEYAREMOREDIFFICULTTOREAD.

• do not use underlining.Makeimportantheadingslargerinstead.

• Justify (line up) the text to the leftasthishelpsyoutoreadthedocumentmoreeasily.

• use a serif rather than a sans serif font.Again,itiseasiertoread.

For example:

8 Supply eye protectors to operators, other workers and visitors where there are eye

hazards.Alwaysweareyeprotectors.

4 Supply eye protectors to operators, other workers and visitors where there are eye hazards. Always wear eye protectors.

• Learn how to use your keyboard to its full capacity.Therearemanyfeaturesthatcan

beusedtogiveamoreprofessionalfinish.

• take care with the length of lines.50-70charactersistheidealnumberofcharacters

perline.

• use subheadings to help break up large blocks of text and guide the reader to the information.

• use colour sparingly.Itishardertoreadthanblackandwhite.

• Make sure graphics are easy to understand.

• Keep layout consistentthroughoutthedocument.

• If you need to include a glossary of technical terms make sure that you follow the agreed layout.

finally, get somebody who does not know the job to read the work method statement. You have achieved a satisfactory result if they understand it.

alternatives to Writing:

Itisveryimportanttoconsideralternativestowritingifyouhaveemployeeswhohavereading

problems.Theymaynotbeabletoreadwordsbuttheymaybeabletofollowapicture,a

diagramorspokeninstructions.

Use alternatives to writing if these convey the meaning more easily:

• Flowchartsforwritingworkinstructionsandprocedures,explainingprocesses,defining

production goals

• Diagrams,illustrations,graphics,linedrawingsfortechnicalterminologyandprocedures

• Tables,charts,graphs(pie,vertical,lineetc.)forstatistics,productiondataandfigures

• Mapsforemergencyprocedures,locationsandlayoutofareas.

Or

read the work method statement to employees and check that they have understood it. Make sure that they then sign it.

14

Mohammad
Highlight
Mohammad
Highlight
Page 17: Writing Work Method Statement Plain English Guidelines 0231

referenCes

Aldhamland,M.,EditingandPublishingWorkshopforAMES,1995

Bousaleh,Gail,‘GuidelinesforWritingintheWorkplace’,AMESEWP,1992

Burke,T.,MeLeod,J.,Montgomery,G.andRiley,M.,Plain English Writing Project,NSW

TAFE,1989

Cole,K.,Crystal Clear Communication,PrenticeHall,Sydney,1993

DEET,Reader Friendly Documents Kit - Profit and Popularity with Plain English, Sydney, 1995

Eagleson,R.D.,Writing in Plain English, AGPS Press, Canbeffa, 1990

Guffey,M.E.,Essentials of Business Communication, KWS, Boston, 1991

Kidd,Isobel,WorkshoponWritingProceduralandFactualTextsinPlainEnglish,AMES1995

Lammas,Brian,“GettingtheMessageAcross”,EnglishInTheWorkplace,AMES,1994

MasterBuilders’AssociationandSummerHillFilms,Stop Chasing Your Tail, WorkCover,

Sydney, 1996

Middleton,R.,andBell,J.,“WritingStandardOperatingProceduresinPlainEnglish”,AMES,

1996

Nenke,Margaret,“WritingStandardOperatingProceduresinPlainEnglish”,SouthernCopper,

AMES/EWPWollongong,1995

Patterson,Sue,“MadeToMeasure,Language,LiteracyandNumeracyinTCFIndustryTraining’,

AMES,Sydney,1996

Street,Suzanne“PlainEnglishWorksheets”,AMESEnglishintheWorkplace,1994

SydneyElectricity,“StyleGuideforElectricalSafetyRulesWritingProject”,AMES,1995

Walsh,B.,Communicating in Writing, 2nd Edition, AGPS Press, Canberra, 1989

Watson,Jacqui,andLewis,Joanna,“AGuidetoPlainEnglishWritingintheWorkplace”,

AMES,1996

15

Page 18: Writing Work Method Statement Plain English Guidelines 0231

aPPendICes

appendix 1

formal words and long winded phrases

Use these instead of these

no absence of

so, therefore accordingly

follow adhere to

changes adjustments

manage administer

give, divide allocate

clear, plain apparent

when necessary as applicable

later at a later time

always at all times

now at the present time

because because of the fact that

by by means of

since, because by virtue of the fact

work out calculate

start commence

complete complete in all respects

has contain

now currently

make less, reduce decrease

despite despite the fact that

shown described herein

stop, end discontinue

send dispatch

because, since due to the fact that

length of duration of

inside, within encase

exit egress

make sure ensure

work out estimate

check examine

leave out exclude

show, tell explain

for for the purpose of

16

Page 19: Writing Work Method Statement Plain English Guidelines 0231

Use these instead of these

because for this reason

later further down the track

need have to

causing giving rise to

same identical

at once immediately

according to in accordance with

and in addition

with in conjunction with

about in reference to

about regarding

finally in the final analysis

soon in the near future

now in this day and age

considering in view of

if in the event that

look at, check inspect

tell notify

see, adhere to, obey observe

regularly on a regular basis

before prior to

part portion

rules, ways procedures

why reason for

fix rectify

move relocate

need, want, must require

needing requiring

must required to

must shall

to so as to

after subsequent to

job task to be performed

the kind of the nature of

use utilise

when whilst, while

could, might with a potential to

immediately without further delay

17

Page 20: Writing Work Method Statement Plain English Guidelines 0231

aPPendIx 2

redundancies - unnecessary repetitions

Use these instead of these

essential absolutely essential

adequate adequate enough

warning advance warning

fundamentals basic fundamentals

big biginsize

combined combined together

eliminate completely eliminate

component component part

consensus consensus of opinion

continue continue on

cooperate cooperate together

each each and every

result end result

identical exactly identical

outcome final outcome

thanks grateful thanks

few few in number

green hat green coloured hat

inventory inventory stock

cooperation mutual cooperation

action required necessary action required

prerequisite necessary prerequisite

beginning new beginning

first hand on a first hand basis

history past history

period period of time

reason reason why

red red in colour

refer refer back

repeat repeat again

schedule time schedule

little tiny little

total total and utter

facts true facts

18

Page 21: Writing Work Method Statement Plain English Guidelines 0231

aPPendIx 3

Verb forms for commonly used nouns

use these verbs instead of these nouns

anchor anchorage

act action

alter alteration

apply application

analyse analysis

assess assessment

assist assistance

attach attachment

complete completion

comply compliance

connect connection

construct construction

erect erection

examine examination

expose exposure

fail failure

identify identification

improve improvement

inform information

install installation

isolate isolation

investigate investigation

maintain maintenance

organise organisation

place placement

position positioning

prepare preparation

project projection

protect protection

recognise recognition

reduce reduction

reject rejection

remove removal

specify specification

supervise supervision

terminate termination

train training

vary variation

19

Page 22: Writing Work Method Statement Plain English Guidelines 0231

aPPendIx 4 - CHeCKLIst

Check List - Writing effective Work Method statements

Have you: Yes/no Comments

keptyoursentencesshortandclear?

• eliminatedunnecessarywords

• avoidedusingtoomanyclausesina

sentence

usedactivenotpassivevoice?

sequencedyourinformationlogically?

chosenyourwordscarefully?

• usedwordsfamiliartoemployees

• usedconsistentlanguage

• avoidedusingidioms

• explainedacronymsandabbreviations

• definedtechnicalwords(usedaglossary)

• standardisedmodality(must,should)

usedverbsnotnounsforactions?

avoidedusingstringsofnouns?

consideredalternativestowriting?

• diagrams,graphics,charts,tables,maps,

flow charts

followedtheagreedformat?

• layout

• styleguide

observedcopyrightlaws?

• acknowledgedsources

20

Page 23: Writing Work Method Statement Plain English Guidelines 0231

WorkCover OfficesFor all occupational health and safety, workers compensation and rehabilitation information, call the WorkCover Information Line – 13 10 50 from anywhere in New South Wales.

HEAD OFFICE Office Hours 8:30am – 5:00pm Monday to Friday 92–100 Donnison Street GOSFOrD 2250 Phone (02) 4321 5000 Fax (02) 4325 4145 Postal Address WorkCover NSW Locked Bag 2906 Lisarow NSW 2252

WorkCover Assistance Service Office Hours 8:30am – 4:30pm Monday to Friday 92–100 Donnison Street GOSFOrD 2250 Phone 13 10 50

LABORATORIES

Thornleigh 5A Pioneer Avenue THOrNLeIGH 2120 Phone (02) 9484 6655 Fax (02) 9980 6849 email [email protected]

Londonderry TestSafe Australia Ground Floor 919 Londonderry road LONDONDerry 2753 Phone (02) 4724 4900 Fax (02) 4724 4999 email [email protected]

REGIONAL and LOCAL OFFICES Office Hours 8:30am – 4:30pm Monday to Friday

REGIONAL OFFICES

Newcastle 956 Hunter Street NeWCASTLe WeST 2302 Phone (02) 4921 2900 Fax (02) 4921 2929

Wollongong 106 Market Street WOLLONGONG 2500 Phone (02) 4222 7333 Fax (02) 4226 9087

LOCAL OFFICES

Albury 463 Kiewa Street ALBUry 2640 Phone (02) 6021 5911 Fax (02) 6041 2580

Batemans Bay Shop 6, Fenning Place 12 Orient Street BATeMANS BAy 2536 Phone (02) 4472 5544 Fax (02) 4472 5060

Blacktown 125 Main Street BLACKTOWN 2148 Phone (02) 9671 8701 Fax (02) 9831 8246

Dubbo Suite 3, 157 Brisbane Street DUBBO 2830 Phone (02) 6884 2799 Fax (02) 6884 2808

Goulburn 21–23 Clifford Street GOULBUrN 2580 Phone (02) 4822 1243 Fax (02) 4822 1242

Grafton NSW Government Offices 49–51 Victoria Street GrAFTON 2460 Phone (02) 6641 5111 Fax (02) 6641 5100

Griffith NSW Government Offices 104–110 Banna Avenue GrIFFITH 2680 Phone (02) 6964 2027 Fax (02) 6964 1738

Hurstville Level 4, 4-8 Woodville Street HUrSTVILLe 2220 Phone (02) 9598 3366 Fax (02) 9585 0261

Lindfield 345 Pacific Hwy LINDFIeLD 2070 Phone (02) 9936 3000 Fax (02) 9936 3030

Lismore Suite 4, Level 4 Manchester Unity Building 29 Molesworth Street LISMOre 2480 Phone (02) 6622 0088 Fax (02) 6622 0090

Liverpool Suite 4, Ground Floor 157–161 George Street LIVerPOOL 2170 Phone (02) 9827 8600 Fax (02) 9827 8690

Narrabri Level 1, 55 Maitland Street NArrABrI 2390 Phone (02) 6792 4643 Fax (02) 6792 3532

Newcastle 956 Hunter Street NeWCASTLe WeST 2302 Phone (02) 4921 2900 Fax (02) 4921 2929

Orange 74 McNamara Street OrANGe 2800 Phone (02) 6361 7070 Fax (02) 6362 8820

Parramatta Level 4, 128 Marsden Street PArrAMATTA 2150 Phone (02) 9841 8550 Fax (02) 9841 8490

Port Macquarie Shops 1 & 2, raine & Horne House 145 Horton Street POrT MACQUArIe 2444 Phone (02) 6584 1188 Fax (02) 6584 1788

Shellharbour 134–134A Lamerton House Shellharbour Square BLACKBUTT 2529 Phone (02) 4297 3796 Fax (02) 4296 8914

Tamworth Shop 20, 341 Peel Street TAMWOrTH 2340 Phone (02) 6766 2490 Fax (02) 6766 4972

Lake Macquarie Shop 2, 33 The Boulevarde TOrONTO 2283 Phone (02) 4959 6366 Fax (02) 4950 5587

Tweed Heads Suite 5, 1 Sands Street TWeeD HeADS 2485 Phone (07) 5536 3262 Fax (07) 5536 4389

Wagga Wagga Level 2, 76 Morgan Street WAGGA WAGGA 2650 Phone (02) 6937 3600 Fax (02) 6937 3616

Wollongong 106 Market Street WOLLONGONG 2500 Phone (02) 4222 7333 Fax (02) 4226 9087

Page 24: Writing Work Method Statement Plain English Guidelines 0231

Catalogue No. WC00231 WorkCover Publications Hotline 1300 799 003

WorkCover NSW 92-100 Donnison Street Gosford NSW 2250Locked Bag 2906 Lisarow NSW 2252 WorkCover Assistance Service 13 10 50Website www.workcover.nsw.gov.au

ISBN 0 7310 8768 2 ©Copyright WorkCover NSW 0508


Top Related