Grounds DepartmentOff Season Review
February 27, 2013
New forward tee boxes on # 2
Deep tine aeration alleviating soil compactions of the fairway.
4 green – reclaimed putting areas
5 green – reclaimed putting areas
6 green 7 greenReclaimed putting areas
8 green – reclaimed putting areas
Original design for # 8 green
Logs from hole # 8
Left side of 8 green – Brush clearing and grade tweaks
Tree roots growing through bunker drainage gravel
Tree roots compromising drainage pipe and gravel of our bunkers
Old bunker drainage lines
Green side bunker work # 10
Worn bridge decking on # 4 bridge
Gary Derickson and Garrett Lewis installing new decking on # 4 bridge
New decking for # 4 bridge
Tree removals for new 50 ft netting along one tee
Storm Damage left of 15 fairway
Storm damage to left of 15 fairway
Storm Damage to left of 15 fairway
Storm Damage behind 3 tee
Storm damage 12 tee
New drain basin on # 9 rough
Toro Golf Decoder Control System(GDC)Update