Download - WHL Team Presentation with WHL Staff 2016
PAGE 1 2/3/2016 11:43
Selected staff and resumes
of coworkers with WHL
Archtiects*Planners, Inc.
WHL Architects
PAGE 2 2/3/2016 11:43
Priti Patil has worked with
WHL for nearly 2 years and
has provided extensive CAD
drafting for numerous pro-
jects.
WHL Architects & Planners Lenthor Engineering Milpiatas, CA 30,000 sq.ft. space for a new upgraded facili-
ty for flexible printed circuit board produc-
tion.
Unidentified Client Mountain View, CA CAD drafting support for:
IRIS Lab Expansion
FA Lab Expansion
Battery Lab Expansion
IRIS Lab Expansion
X Labs at RAILS
GLS Expansion
Priti Patil
CAD Drafting - Documents
PAGE 3 2/3/2016 11:43
Priti Patil has worked with
WHL for nearly 1.5 years
and has provided extensive
CAD drafting for numerous
projects.
WHL Architects & Planners Pearl Therapeutics Redwood City, CA 70,000 gsf biomed office, lab, support space,
and manufacturing facility.
Unidentified Client Mountian View, CA Household Products Subsidiary Test Build-
ing. Sunnyvale, CA
Household Products Subsidiary Test Build-ing, Palo Alto, CA X Labs at RAILS
Leslie Zheng
CAD Drafting - Documents
PAGE 4 2/3/2016 11:43
Kartikey Patel has worked
with WHL for nearly 1 year-
and has provided extensive
CAD drafting for numerous
projects.
WHL Architects & Planners Alta Devices Sunnyvale, CA 70,000 gsf photovoltaics office, lab, support
space, and manufacturing facility.
Unidentified Client Mountian View, CA Household Products Subsidiary Test Build-ing, Palo Alto, CA
Kartikey Patel
CAD Drafting - Documents
PAGE 5 2/3/2016 11:43
Amisha Ambani is a creative
and organized, detail orient-
ed individual with a well
rounded exposure to theo-
retical, educational and
practical aspects of archi-
tecture.
Passionate about energy
conscious architecture and
the use of climatology.
Architectural experience on
a diverse variety of projects
ranging from biotech, phar-
maceutical, microelectron-
ics and medical devices to
commercial and residential.
Educational experience of 4
years having taught 1st and
2nd year B.Arch. students-
architectural design, clima-
tology, building technology
and a number of workshops.
WHL Architects & Planners Bioseek South San Francisco, CA 14,000 sq.ft. space for a biotech firm was
designed for tissue culture, molecular biology
and robot labs with ancillary spaces like
equipment areas, break rooms, offices and
conference rooms.
Ranjitsinh Associates Mumbai, India Lead Planner for Northpoint Center of Learn-
ing, Khandala for designing a 100,000 sq.ft.
training institute with conference rooms, syn-
dicate rooms, dining and recreational areas,
health club and accommodation facilities.
Design process was extensive and research
oriented with a lot of collaboration with con-
sultants.
Auroville, India
Worked with Alternative Building Technolo-gy on the project of ‘legomes’. Construction experience – constructed brick structures with brick domes built using the Nubian Technique. Albenberg Hockstein Architect New Jersey, USA Design development for various residential
projects, offices, factories.
Amisha Ambani
CAD Drafting - Documents
PAGE 6 2/3/2016 11:43
Years Experience
30
Education
Bachelor of Archi-
etcture – 1985 Univer-
sity of Southern Cali-
fornia,
Registrations/
Organizations
Mr. Garg is a California
Registered Archtitect
Mr. Garg has over 30 years
experience, including docu-
mentation, design, project
management, and firm man-
agement. Project types in-
clude commercial, multifam-
ily residen-
tial, and insti-
tutional.
Alta Devices Sunnyvale, CA 70,000 sq.ft. space for a new upgraded facili-
ty for photvoltaic production.
Intarcia Thereapeutics Hayward, CA 70,000 sq.ft. space for a new upgraded facili-
ty for biomendical production.
Unidentified Client Mountain View, CA GLS Expansion
Project Architectural and CAD drafting sup-
port for:
Household Products Subsidiary Test Build-ing, Palo Alto, CA
Mohit Garg, AIA
Project Architect - Documents
PAGE 7 2/3/2016 11:43
Anna Yahn Jones supports
WHL in position as consult-
ant. Her firm, SKB of Wash-
ington, D.C., is a long time
collaborator and associate
firm to WHL—through the
professional relationship be-
tween Douglas White and
Mark Baughman, Founder
and Principal of SKB.
WHL Architects & Planners Pearl Therapeutics Redwood City, CA 70,000 gsf biomed office, lab, support space,
and manufacturing facility.
Guardant Health Redwood City, CA 40,000 gsf biomed office, lab, support space,
and manufacturing facility.
Alta Devices Sunnyvale, CA 70,000 sq.ft. space for a new upgraded facili-
ty for photvoltaic production.
Unidentified Client Mountian View, CA Household Products Subsidiary Test Build-
ing. Sunnyvale, CA
Household Products Subsidiary Test Build-ing, Palo Alto, CA
Anna Yahn Jones
Consultant to WHL from SKB
Architects
Washington, DC
Project Manager and Interior
Designer
PAGE 8 2/3/2016 11:43
Years Experience
43
Education
Bachelor of Arts, Ar-
chitecture – 1972 Uni-
versity of California,
Berkeley
Registrations/
Organizations
Mr. Procter is a Califor-
nia registered NCARB
Certified
Member of San Francis-
co Global Trade Council
Mr. Procter has over 43 years ex-
perience, including documenta-
tion, design, project management,
and firm management. Project
types include commercial, multi-
family residential, and institution-
al.
Alza Corporation Mountain View, CA Muli-Layer Tablet Press Installation Fluid Bed Granulator Installation Amgen, Inc. Thousand Oaks, CA Building 20X & 31 - T.I. design and docu-mentation for 15,000 s.f. of CLCP Relocation Boston Scientific Fremont, CA
T.I. design and documentation for Building 1 & 4 -25,000 s.f. manufacturing, R&D meet-ing room addition Chiron Corporation Emeryville, CA T.I. design and documentation for M3 Labor-atory expansion - Project included new labor-atory for cardiovascular research, and QA Millenium Pharmaceuticals S. San Francisco, CA Process Chemistry Laboratories T.I. Masterplanning Drawbridge/Newcastle Partners S. San Francisco, CA
Tim Procter, AIA
Project Architect - Documents
PAGE 9 2/3/2016 11:43
Years Experience
31
Education
Ph.D. .Urban Planning,
Scientific Research and
Urban Planning Institute
MA Architecture, Acad-
emy of Architecture and
Engineering
Bachelor Degree of
Liberal Arts,
Academy of Art
Registrations/ Organiza-
tions
Member of California
Hospital Association
Political Action Com-
mittee
Mr. Vartanian has over 20
years of experience in the
design, documentation and
project management of a va-
riety of industrial, master
planning, commercial/
offices, hospitality, pharma-
ceuticals and healthcare
projects. As a project man-
ager he is responsible for
project schedule and budg-
et, consultant coordination
and development of major
design projects and con-
struction documents pro-
duced within the office. His
experience encompasses a
wide range of building types
with a thorough knowledge
of the construction process,
code analysis, and building
systems.
Prior to W HL Architects VA Palo Alto Health Care System New Centers for Ambulatory Care and Polytrauma Rehabilitation VA Medical Center, Palo Alto, CA Documentation for both phases of a large project by the VA: Phase 1 consisted of a 93,000 sf Polytrauma Rehabilitation Center, a 64,000 sf Blind Rehabilitation Center, a 600 car parking structure, a 20,000 sf energy plant. Phase 2 of the project consisting of 375,000 sf Ambulatory Care Center, a new Research Center and 750 car parking struc-ture. development of the comprehensive long term site development plan for the future of the Palo Alto Medical Center campus through 2025. Enlisting a multidiscipline project team with specialized expertise, the team analyze long-term site development. The projected VA expenditures this plan will encompass are in excess of $1.0 billion. Project Manager Lucile Packard Children’s Hospital Oncol-ogy and Pediatric Surgery Suite Renova-tion Stanford, California Programming, planning, architectural and
interior design services for these two major
renovation projects. The projects were con
structed simultaneously within the fully op
erational Lucile Packard Children’s Hospital
at Stanford University Medical Center. Com
bined, the projects total more than 108,000
sf and are being constructed at a cost of $60
million. Construction completed in 2008.
David Vartanian, Ph.D
Project Manager – Program-
ming
and Masterplanning Labs
PAGE 10 2/3/2016 11:43
Years Experience
31
Education
Ph.D. .Urban Planning,
Scientific Research and
Urban Planning Institute
MA Architecture, Acad-
emy of Architecture and
Engineering
Bachelor Degree of
Liberal Arts,
Academy of Art
Registrations/ Organiza-
tions
Member of California
Hospital Association
Political Action Com-
mittee
Mr. Vartanian has over 20
years of experience in the
design, documentation and
project management of a va-
riety of industrial, master
planning, commercial/
offices, hospitality, pharma-
ceuticals and healthcare
projects. As a project man-
ager he is responsible for
project schedule and budg-
et, consultant coordination
and development of major
design projects and con-
struction documents pro-
duced within the office. His
experience encompasses a
wide range of building types
with a thorough knowledge
of the construction process,
code analysis, and building
systems.
Prior to W HL Architects VA Palo Alto Health Care System New Centers for Ambulatory Care and Polytrauma Rehabilitation VA Medical Center, Palo Alto, CA Documentation for both phases of a large project by the VA: Phase 1 consisted of a 93,000 sf Polytrauma Rehabilitation Center, a 64,000 sf Blind Rehabilitation Center, a 600 car parking structure, a 20,000 sf energy plant. Phase 2 of the project consisting of 375,000 sf Ambulatory Care Center, a new Research Center and 750 car parking struc-ture. development of the comprehensive long term site development plan for the future of the Palo Alto Medical Center campus through 2025. Enlisting a multidiscipline project team with specialized expertise, the team analyze long-term site development. The projected VA expenditures this plan will encompass are in excess of $1.0 billion. Project Manager Lucile Packard Children’s Hospital Oncol-ogy and Pediatric Surgery Suite Renova-tion Stanford, California Programming, planning, architectural and
interior design services for these two major
renovation projects. The projects were con
structed simultaneously within the fully op
erational Lucile Packard Children’s Hospital
at Stanford University Medical Center. Com
bined, the projects total more than 108,000
sf and are being constructed at a cost of $60
million. Construction completed in 2008.
Caroline Serpa—Office Man-
agement and Administration
PAGE 11 2/3/2016 11:43
Years Experience 38 Education Master of Architecture - 1976 University of Texas, Austin Bachelor of Arts in En-vironmental Design - 1975 University of Cali-fornia, Berkeley Registrations/ Organi-zations Mr. White is a registered Architect in California, Florida, Pennsylvania, Illinois, New York, New Jersey, North Carolina and Texas. NCARB Accredited. Member of American Institute of Architects Member of International Society for Pharmaceu-tical Engineering Mem-ber of International Con-ference of Building Of-ficials Member of Construction Specifica-
tions Institute
Mr. White's 38 year career in
architectural practice start-
ed immediately after receipt
of his M. Arch Degree, and
has been continuous and
without interruption. He
maintains management and
overall responsibility con-
sisting of direct participa
tion in the design, documen-
tation and construction of
projects, monitoring the pro-
ject budget and schedule,
and financial and contractu-
al obligations to the client
and engineering consult-
ants. Mr. White's project ex-
perience with electronics
and computer facilities be-
gan in 1978.
Special Research Labs BL-1 to BL-4 Tissue Culture Labs/Suites Animal rooms/Housing/Research Labs Necropsy /Surgery/Quarantine/Microisolator Greenhouses AIDS Research Labs Organic Synthesis/Chemistry/Protein Chemistry Hazardous Occupancies: H-2, H-7, and H-8 Microinjection
Process Development/GMP Manufactur-ing Fermentation Areas (Mammalian and Bacterial) Change Rooms/Gown Rooms/Air Locks Sterile Prep/Sterile Fill/Sterile Processing Cold Processing Rooms Clean Rooms CL-100, CL-1,000, CL-10,000 Biomedical Products Assembly Biomedical Subassembly Hazardous Occupancies, H-2, H-7 and H-8 WFI/Clean Steam Systems Coordination Blood Fractionation, Purification Areas Recovery/Purification, Isolation, Extraction Chemical Synthesis
Research/Manufacturing Support Environmental - Cold/warm humidity controlled rooms Instrument rooms/Equipment Rooms Centrifugation/Chromatography/Fermentation Glassware prep/Wash/Dry/Autoclave Cage wash and animal facility support Hazardous Materials/Chemical Storage - H-2 HPLC NMR/Mass Spec. Engineering Support Validation Media Prep
Dark Rooms
Solar R + D and Manufacturing:
Site Masterplanning and Building Architecture
Process flow and facility planning for manufacturing.
PV Panel Assembly and Manufacturing, MOCVD Thin film equipment and other tool Fit Ups, Robotics
All manufacturiing ISO class 3, 4, 5, 6, 7, and 8.
H-2, H-4, H-5, H-8 (Ca) Hazardous Occupancies
Microelectronics and Electronics R + D
and Manufacturing:
Integrated circuits, hybrid circuits, detectors.
PCB and periferal manufacturiing.
All manufacturiing ISO class 4, 5, 6, 7, and 8.
H-2, H-4, H-5
Douglas White, AIA
Founder and President, WHL