ASI - WFPF Simulation Details.docx
WFPFundamentals:TheBuildSimulationDetails
DOCUMENT VERSION
Revision Description Date
Rev. A Simulation updated and document imported to 2013 template
01 JAN 13
ASI - WFPF Simulation Details.docx
Record of Revision
Revision Date Revision Description Originated By Reviewed By Approved By
Rev. 0 01 AUG 2007
Simulation Published Lloyd Rankin Lloyd Rankin Lloyd Rankin
Rev. A 01 JAN 13 Simulation updated and document imported to
2013 template Lloyd Rankin,
Steve Manktelow
Lloyd Rankin Lloyd Rankin
Copyright and Disclaimer Information
ASI and respective logos are either registered trademarks or trademarks of Ascension Systems, Inc. in Canada and / or other countries. All other trademarks are the property of their respective owners.
© 2013 Ascension Systems, Inc. All rights reserved.
ASI - WFPF Simulation Details.docx
Contents 1. Background ........................................................................................................................................... 2
2. Contracting Strategy ............................................................................................................................. 2
3. Complexity ............................................................................................................................................ 2
4. Construction Management ................................................................................................................... 2
5. Project Controls .................................................................................................................................... 3
6. Engineering ........................................................................................................................................... 3
7. Materials Management ........................................................................................................................ 3
8. Fabrication ............................................................................................................................................ 3
9. Equipment, Scaffolding and Specialty Tools ......................................................................................... 4
10. Claims ................................................................................................................................................ 4
11. Permitting and Safety ....................................................................................................................... 4
12. Laydown Areas .................................................................................................................................. 4
13. Scope of Work ................................................................................................................................... 4
14. Construction ...................................................................................................................................... 5
14.1 Civil ................................................................................................................................................ 5
14.2 Structural Steel .............................................................................................................................. 5
ASI - WFPF Simulation Details.docx
14.3 Piping ............................................................................................................................................. 5
15. Quality Assurance/Quality Control (QA/QC) ..................................................................................... 5
16. Hydrotesting ..................................................................................................................................... 6
APPENDIX A: PIPERACK VIEWS ....................................................................................................................... i
APPENDIX B: PILING DRAWING ..................................................................................................................... ii
APPENDIX C: PLOT PLAN .............................................................................................................................. iii
APPENDIX D: STEEL DRAWINGS ................................................................................................................... iv
APPENDIX E: ISOMETRIC DRAWINGS ............................................................................................................ v
APPENDIX F: PLASTIC PIPE NUMBERING SYSTEM ........................................................................................ vi
ASI - WFPF S
1.
ASOC (AcompandevelopprojectInvestogreenfiproduc
2.
There aMost coare beiperformsome c
3.
The comusing mstakehoinvento
4.
The enghired a course
Simulation Deta
Backgr
Ascension/ SAny, two estabping conventi and the budg
or money waseld project wtion of 65 mi
Contra
are 16 primarompanies areng constructe
med in some cases by a con
Compl
mplexity of thmultiple rules olders have dory managem
Constr
gineering comconstructioninstructor).
ils.docx
round
AIT Oil Compablished Canadional plays (uget is several
s required to pwith a three-ye
llion barrels.
acting St
ry constructioe working on ed on a lump-cases by the e
nstruction ma
lexity
he project is tof credit, muifferent desig
ment systems.
ruction M
mpanies and cn manager to
any) is a jointdian conventio
pstream and orders of maput the deal tear construct
trategy
on contractorsa cost-reimbu-sum basis. Thengineering,
anager hired b
the result of multiple progresgnators for th
Manage
construction manage the p
t venture of Aonal oil compdownstream
agnitude largetogether and tion schedule
s, multiple suursable basis,he constructiprocurementby the owner
multiple stakessing systems
he same parts
ment
firms are notproject: TFI C
WFP Fund
Ascension Oil panies. While
m), this is theirer than what the project -, a $10 billion
ubcontractors, but some smon managemt & constructr.
eholders wors, multiple cos, tools, and e
t configured aConstruction M
damentals: SAscens
Revision:
Company anboth firms h
r first heavy othey are acc
- UFI (Upgraden budget and
s and four engmaller, discret
ment function ion (EPC) com
king a varietyoding systemsequipment) a
as an EPC andManagement
Simulation Dsion SystemsA (January 2
Page
d SAIT Oil ave experienoil developmeustomed to. er Facility 1) -a target annu
gineering firmte pieces of w is being
mpany, and in
y of shifts ands (many nd multiple
d the owner ht (CM), Inc. (th
etails s, Inc. 2013)
e 2 of 6
ce ent
- is a ual
ms. work
n
d
has he
ASI - WFPF S
5.
The conprojectrequirecontrol
6.
The engestablisbeing d
Scope cmateria
7.
To reduthose mrule is nwere ex
Delays contrac
8.
To redufabricatsite by
Simulation Deta
Projec
nstruction ma controls. The
ements. Projes group.
Engine
gineering for shed industriadeveloped by
changes and aals. These sco
Mater
uce costs, ASOmaterials onlynot expected xpected to be
in engineerinctors will only
Fabric
uce costs, fabted off-site inthe contracto
ils.docx
ct Contro
anager has idey are also re
ect control req
eering
the pipe rackal engineeringConvex Engin
additions havope changes w
rials Man
OC has decidey when the CWto be a prob
e purchased o
ng have resulty be able to a
ation
brication is ben Edmonton aor.
ols
entified interequired to repquirements w
k (CWP 200) ig company. Tneering.
ve delayed thewhere initiate
nageme
ed to store alWP (Construclem because or fabricated
ted in delays ccess materia
eing done on aand transport
rnal requiremport progress will be provide
s being compThe CWP 200
e completioned by ASOC.
nt
l materials inction Work Pawhen the exeprior to the s
in procuring pals attached t
a unit-cost bated to site ins
WFP Fund
ments for the cbased on the
ed by the con
pleted by Fluopipe rack wil
n of engineeri
their warehoackage) is 100ecution plan wstart of const
purchased anto the CWP th
asis for steel. tallation. Pilin
damentals: SAscens
Revision:
contractors te CM project nstruction ma
or Engineeringl tie in to CW
ng and procu
ousing facility0% complete.was developeruction.
nd fabricated hat they have
Pipe spools angs are being
Simulation Dsion SystemsA (January 2
Page
o do their owcontrols grou
anager’s proje
g, a well-WP 300, which
urement of
y and release . The 100% reed, all materi
materials. Noe been assigne
are being g fabricated o
etails s, Inc. 2013)
e 3 of 6
wn up’s ect
h is
elease als
ote: ed.
off-
ASI - WFPF S
9.
To redua varietrequestassigneThese wdetailed
10.
Even thnot be
11.
Prior tosafety orequireis requi
12.
All laydwere ba
13.
The clathrough
Simulation Deta
Equipm
uce costs, ASOty of locationt. Note: contr
ed. The locatiowere based od equipment,
Claims
hough this is areimbursed, t
Permit
o gaining acceorientation aned for all heavired must foll
Laydow
down areas haased on the le
Scope
ssroom consth much of the
ils.docx
ment, Sc
OC has decides around the ractors will onons have been the level-3 , scaffolding a
s
a cost-reimbuthe contracto
tting and
ess to the sitend wear all devy lift and excow detailed p
wn Area
ave been idenevel-3 schedu
of Work
truction is at e project.
caffoldin
ed to store alworksite and
nly be able ton identified bschedule and
and specialty
ursable contraor may opt to
d Safety
e, the contracesignated Per
cavation activpermitting ins
as
ntified based ule and were
k
1/10 scale an
ng and S
l equipment, d release thoso access itemsbased on the d were determ
tools, please
act, in cases wo make a claim
y
tor and otherrsonal Protec
vities prior to structions.
on the CWP ddetermined
nd this is part
WFP Fund
Specialty
scaffolding mse items to ths attached toCWP develop
mined prior toe see the reso
where the CMm (e.g., trainin
r parties will ctive Equipmework comme
developed byprior to contr
of a much la
damentals: SAscens
Revision:
y Tools
materials andhe contractor the CWP tha
ped by the eno contractor
ource handou
M recommendng costs).
be required tent (PPE). Perencing. Areas
y the engineeractor selecti
rger pipe rac
Simulation Dsion SystemsA (January 2
Page
specialty toos upon writte
at they have bngineering firmselection. Fot.
ds that some
to complete armitting is where perm
ering firms. Thon.
k that contin
etails s, Inc. 2013)
e 4 of 6
ols in en been ms.
or
costs
a
itting
hese
ues
ASI - WFPF S
14.
14.1
Nationavery exin the Cthe lonstructu
Delays
14.2
The steThe ereAccordwareho
Delays
14.3
Piping fcapabledelivere
Delays
15.
QA/QC indicate
Simulation Deta
Constr
Civil
al Earthworksxperienced anCWP) will be ig-boom cranral or piping s
in engineerin
Structu
eel work has bection is beinging to the exe
ousing prior to
in engineerin
Piping
fabrication ane contractor. ed to ASOC fo
in engineerin
Qualit
will ensure ted in the mos
ils.docx
ruction
s has been sund capable co
nstalled usinge. In the execstarting, so th
ng have result
ural Steel
been sub-cong done by Steecution plan, o the start of
ng have result
nd erection isAccording to
or warehousi
ng have result
y Assura
hat constructst recent vers
b-contractedntractor. To rg the short-b
cution plan, thhis condition
ted in delays
tracted with eel Structuresthe steel sho
f steel erectio
ted in delays
s being done bthe executio
ng prior to th
ted in delays
ance/Qu
tion adheres tsion of the CW
d to completereduce equipoom crane, phe civil work should not ne
in procuring p
the fabricatios, an experienould be fabricon.
in procuring p
by the prime on plan, spoolhe start of pip
in procuring p
uality Co
to all site safeWP.
WFP Fund
e the civil portment costs, a
prior to instalwas planned egatively imp
purchased an
on of steel annced and veryated and deli
purchased an
contractor Dl fabrication s
pe erection.
purchased an
ontrol (Q
ety standards
damentals: SAscens
Revision:
tion of the coall perimeter ling the centrto be comple
pact the const
nd fabricated
nd is being doy capable conivered to ASO
nd fabricated
epot, an expeshould be com
nd fabricated
QA/QC)
s and is const
Simulation Dsion SystemsA (January 2
Page
ontract. They pilings (as sh
ral pilings usinete prior to truction activ
materials.
one by ASI Stentractor. OC for
materials.
erienced andmpleted and
materials.
tructed as
etails s, Inc. 2013)
e 5 of 6
are a own ng
vities.
eel.
very
ASI - WFPF S
16.
Each linhydrote
Simulation Deta
Hydro
ne needs to besting will be
ils.docx
testing
e checked anperformed b
nd tagged as cby another co
complete to sntractor.
WFP Fund
support hydro
damentals: SAscens
Revision:
otesting. Note
Simulation Dsion SystemsA (January 2
Page
e: the actual
etails s, Inc. 2013)
e 6 of 6
ASI - WFPF S
APPE
See foll
Simulation Deta
ENDIX A
lowing page(s
ils.docx
A: PIPERA
s)
ACK VIEWWS
WFP Funddamentals: SAscens
Revision: Simulation Dsion SystemsA (January 2
etails s, Inc. 2013)
i
ASI - WFPF S
APPE
See foll
Simulation Deta
ENDIX B
lowing page(s
ils.docx
B: PILING
s)
G DRAWING
WFP Funddamentals: SAscens
Revision: Simulation Dsion SystemsA (January 2
etails s, Inc. 2013)
ii
ASI - WFPF S
APPE
See foll
Simulation Deta
ENDIX C
lowing page(s
ils.docx
C: PLOT P
s)
PLAN
WFP Funddamentals: SAscens
Revision: Simulation Dsion SystemsA (January 2
etails s, Inc. 2013)
iii
ASI - WFPF S
APPE
See foll
Simulation Deta
ENDIX D
lowing page(s
ils.docx
D: STEEL
s)
DRAWINNGS
WFP Funddamentals: SAscens
Revision: Simulation Dsion SystemsA (January 2
etails s, Inc. 2013)
iv
ASI - WFPF S
APPE
See foll
Simulation Deta
ENDIX E
lowing page(s
ils.docx
: ISOME
s)
ETRIC DRRAWING
WFP Fund
GS
damentals: SAscens
Revision: Simulation Dsion SystemsA (January 2
etails s, Inc. 2013)
v
ASI - WFPF S
APPE
Simulation Deta
ENDIX F
Str
St
St
ils.docx
: PLASTI
raight Pipe Elbows
traight Pipe Elbows 2 x 3 T Drains
traight Pipe Elbows
IC PIPE N
PLASTIC PIP
NUMBER
PE NUMBERIN
4-INCH
3-INCH
2-INCH
WFP Fund
RING SY
NG SYSTEM
44
damentals: SAscens
Revision:
YSTEM
435651 5 4354114
3356515 3354114 3355555 3357121
2356515 2354114
Simulation Dsion SystemsA (January 2
etails s, Inc. 2013)
vi