Download - West Palm Beach, FL 3/24/2005
2005-0324FL.ppt
technical archives
www.trictrenchless.com
TRIC Training Log: 03-24-05
Client: Sanfield Septic / Speedy Rooter, West Palm Beach, FL
Job: School, deteriorated sewer with multiple connections
Pull: 100’ / upstream / 4” SDR17 / bursting 4” C. I.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
We at TRIC Tools have specific requirements for the use and
maintenance of our equipment with regard to safety and
efficiency on the job. Our written and verbal
recommendations coincide with safety regulations set by
local, state, and national government agencies. Our clients
may have standards over and above industry regulations.
However, the safety equipment, apparel, and operating
procedures demonstrated by our clients in this presentation
may or may not comply with above mentioned government
regulations.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Dedicated Trailer: This is probably the best overall equipment solution. The ramp, walk-in headroom, and detachability are all extremely convenient.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Workshop on wheels
2005-0324FL.ppt
technical archives
www.trictrenchless.com
The job:
Replace 100’ segment of deteriorated 4” cast iron sewer line from main office through service hallway and library to trunk line in courtyard. Multiple drain connections required small excavations; otherwise hallway, library floor, and concrete corridor were spared (see legend).
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Fusing: If possible, find a clean, flat work area away from wind and weather.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Cable insertion: In many cases, the cable can be pushed through the old sewer by hand. In this case, inserting the cable upstream through bends and separate connection pits in building required use of the
duct rod, or “fishing line,” which is fed through from pulling pit to entry area, then taped to cable as shown.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Entry: Across breezeway from library, at lift station.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Entry path: 120’ of fused HDPE pipe, winding its way to the entry pit (by fuse/switch boxes). Always fuse more pipe than the entry-to-exit
length.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Pulling pit: In hallway between main office and infirmary.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Interior pulls: An old tire is excellent for cable storage. It also contains the cable when pulling from inside a building, helping to keep
worksite clean.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
From library: Reading room floor and adjacent office (to right) were entirely avoided. Pits in hallway are separate drain connections (see
drawing).
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Cribbing: Note galvanized water line crossing over sewer (see arrow). This pipeline was avoided by “cribbing back” in a longer hole than otherwise necessary, using 2”
galvanized conduit as piers and wood blocks as struts and spacers. Always have plenty of wood available.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Connections: Since tie-in points must be excavated to make connections, remove all joints and couplings at each connection before pulling in new line. This keeps the
bursting head free of debris and makes the job go easier and faster.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Pipe “push”: Towards end of pull, old cast iron is pushed through loose soil into pulling pit. Pipe can be broken with a sledge hammer as it emerges (be
careful of cable).
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Home stretch: Watching for the clevis (cable termination) and bursting head.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Arrival: Cribbing allows clear view of clevis and head assembly as they emerge, and like the TRIC extraction cage, frees the bursting head from the earth to allow cutting off pipe 8”–12”
behind head assembly. When cribbing is not possible, keep cable visible at all times as it enters pulley base. Stop when clevis appears at threshold (see arrows), so as to avoid pulling clevis
under pulley wheel and bending it.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Clean-up: Connections and concrete patching will be done in the morning.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
New connections: After the pull, there’s one continuous line from entry to exit. Then connections are made from one end to the other.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
PE Technique: Starting at the exit end (pulling pit), cut PE pipe and make connections in sequence towards the other end of the line. This allows the option of “bumping” the PE pipe from
the entrance pit (where excess pipe is protruding) up to connections, to make perfect joints.
2005-0324FL.ppt
technical archives
www.trictrenchless.com
Minimal intrusion: Given the number of connections in the main hallway, the overall destruction was kept to a minimum. Views are from pulling pit in office (left) and from library
(right).