Promoter GSECL(Gujarat Government)Location Wanakbori, Gujarat (MSL: 78.20 Mtrs) Latitudes 22° 53'
Longitudes 73° 24'
Installed Capacity in MW
1470 MW
Unit configuration For Expansion
1 X 800 MW
Fuel CoalFuel Linkage With
Coal India
![Page 4: Wanakbori Thermal Power Station](https://reader033.vdocuments.site/reader033/viewer/2022042507/5450a475b1af9f1c168b4dd5/html5/thumbnails/4.jpg)
Project Background Power Station is located near Wanakbori Dam on the bank of Mahi River in Kheda District. It is a Coal Based Power Station. There are seven units of 210 MW each with a total installed capacity of 1470 MW. All the units are of BHEL make. Wanakbori TPS has obtained the ISO – 9001 & ISO - 14001 certificates
![Page 5: Wanakbori Thermal Power Station](https://reader033.vdocuments.site/reader033/viewer/2022042507/5450a475b1af9f1c168b4dd5/html5/thumbnails/5.jpg)
Years from Commissioning
Project returns based on per unit income of Rs 2.Increase in income by 14% Per annum.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 250
20
40
60
80
100
120
140
160
180
200
Cumulative IncomeWorth of investment @ 10 % in-terest
Rs in 1000 Cr