MEETING ROOM
OFFICEOFFICE OFFICE
BRIDE'SROOM
BATHROOM
CAPITALHOSPITALITYCAFETERIA
LOBBY
TOILET
CLEANINGSTORAGE
MALECHANGING
ROOM
BAKERY
CAPITALHOSPITALITY
KITCHEN
GASSTORAGE
CORRIDOR
RECEIVINGOFFICE
POTWASHING
AREA
CORRIDOR
STEWARDINGOFFICE
GASSTORAGE
HOUSEKEEPINGOFFICE
STAFF TOILET
DROP OFF
CAPITALHOSPITALITY
CHEMICALROOM
PARTITIONSTORAGE
FEMALEPRAYERROOM
SECURITYROOM
TOILET
CLEANINGSTORAGE
FEMALECHANGING
ROOM
STORE
Gate 2
Gat
e 1
STAGE
AL BARZA
EXIT.
CORRIDOR CORRIDOR
CORRIDORCORRIDOR
Gate 3
ELECT.ELECT.
AUDIO
ROOMVISUAL
T H E L I N K
ORGANISEROFFICE
Hei
gh
t L
imit
- 4
m (
Do
or
Hei
gh
t)
Hei
gh
t L
imit
- 7
m (
Par
titi
on
Tra
ck H
eig
ht)
LOADING AREA
LOADINGDOOR
2.1
Gate 5Gate 6
Gat
e 7
AL MAJLIS
LOADINGDOOR
2.3
LOADINGDOOR
1.3
LOADINGDOOR
1.1
ESCESC
ESCESC
ESC ESC
ESC ESC ESC
ES
C
TCPTCP
TCP
TCPTCP
TCP
PROJECTOR SCREEN
PARTITIONSTORAGE
PANTRYTOILET
Hei
gh
t L
imit
- 4
m (
Do
or
Hei
gh
t)
CONFERENCEROOM 1
CONFERENCEROOM 2
AUDITORIU
M
SERVERROOM
ELECTRICALROOM
PARTITIONSTORAGE
LOUNGE
CONTROLPANEL
CONTROLPANEL
CONTROLPANEL
CORRIDOR
du
ENTRY EXITCLOSEDSLIDING GATE SLIDING GATE
SECURITYBOOTH
SUBSTATION
SUBSTATION
DR
OP
OF
F
R/A
ATM
PANTRYPARTITIONSTORAGE
OFFICE
OFFICE
CHSTORAGE
ROOM
CAPITALHOSPITALITY
STORAGEROOM
CAPITALHOSPITALITY
OFFICE
CAPITALHOSPITALITY
LAUNDRYROOM
CAPITALHOSPITALITYBEVERAGE
ROOMPARTITIONSTORAGE
CAPITALHOSPITALITY
STORAGE
ELECTRICALROOM
ELVROOM
TELEPHONEROOM
ADNEC SERVICESSTORAGE ROOM
TOILET
IDFROOM
ARABIANCOFFEEROOM
ADNEC SERVICESOFFICE
CAPITALHOSPITALITY
KITCHEN
PARTITIONSTORAGE
CAPITALHOSPITALITY
KITCHEN
CAPITALHOSPITALITY
F&B ROOM
HOUSEKEEPINGSTORAGE
IDFROOM
MAINTENANCESTORAGE ROOM
ORGANISEROFFICE
TELEPHONEROOM
BRIDES ROOM
BRIDES ROOM
ELECTRICALROOM
STORE ROOM
IDF ROOM
PANTRY
TOILET
LOBBY
OFFICEOFFICELOST & FOUNDROOM
OFFICE
LOBBY
RECEPTION
STARBUCKS
STORAGEROOM
FIRSTAID
ROOM
STORAGETOILET
LOADINGDOOR
2.2
HALL 2 - SECTION A
ServiceDoor
1.1
CHService Door
1.1
CHService Door
1.3
ServiceDoor
1.3
CCTV CONTROLROOM
CAPITALHOSPITALITYSHOWROOM
PARKING ZONE
"C"
PARKING ZONE
"B"
PARKING ZONE
"D"
PARKING ZONE
"A"
VIPParking
VIPParking
PARKING ZONE
"E"
(Sandy Area - Seasonal Parking)
SERVER ROOM
LOADINGDOOR
1.2
Gate 4
HALL 1 - SECTION BHALL 1 - SECTION A
HALL 2 - SECTION B
1
12
2
34567
8
9
10
11
14
20
22
24
28
30
33252014
Par
titi
on
Div
ider
360.00
185
.07
70.00
315.00
247
.99
NOTE:THE DETAILS ON THIS AREA (PARKING ZONE E) IS FOR
REFERENCE USE ONLY. ANY BUILD UPS ON THIS AREA WILLREQUIRE THE ACTUAL SITE SURVEY BEFORE THE COMMENCE
OF ANY WORKS.
CHTEMPORARY
CATERINGSTANDS AREA
CHTEMPORARY
CATERINGSTANDS AREA
4
9
4
9
FIRSTAID
ROOM
AED
AED
PULL
INCASEOF FIRE
NT
AACC AS BUILT - GROUND FLOOR
LEGEND:
Primary Hall Divider
Single Socket
TV Junction Box
Voice Only
Data & Voice Port
Double Socket
Emergency Phone
First Aid Room
Exit Door
Fire Hose Reel Cabinet
Toilet for Disabled
Female Toilet
Male Toilet
Staircase
Floor Trenches
Loading door
GENERAL ARRANGEMENT
DRAWING TITLE:
SCALE:
APPROVED BY:
DRAWN BY:Chris
NTS
09 June 2019
REV. # REVISION DATE REVISED BY
12Renaming of Loading Doors
& Gates22/07/2018 JUN
13 Revised Auditorium Seating 29/10/2018 Chris
14EXTENDING THE AREA OF
PARKING ZONE 'E'10/12/2018 CHRIS
15 EHS COMPONENTS ADDED 27/05/2019 CHRIS
16 EHS COMPONENTS ADDED 09/06/2019 JUN
Water & Waste Floor Pit
TBC
EHSMS No Build Zone
Kitchen
Hall Entrance Door
External Fire Hydrant
External Distribution Board
PARKING ZONE NOS. OF PARKING BAYS TOTAL AREA (M²)
A 167 3,400 m²
B 130 3,900 m²
C 120 3,000 m²
D 59 1,200 m²
VIP 16 n/a
E 210 (Approximate) 86,200 m² (Approximate)
PARKING ZONE
Emergency Safety Cabinet
TCP Boxes
ATM MachineATM
TCP
ESC
Fire Alarm Call Point ButtonF
Emergency Evacuation
PULL
INCASEOF FIRE Fire Suppression System
Emergency Pull Station
Fire Extinguisher
NT NT Payment Kiosk