Skardu and Gilgit Airports
1
Works & Development Directorate (21/04/2010)
-
8/6/2019 Visit Skardu and Gilgit
2/31
NAME OF THE PRESENTING OFFICE
2
Works & Development Directorate
BIRD EYE VIEW OF SKARDU AIRPORT
-
8/6/2019 Visit Skardu and Gilgit
3/31
NAME OF THE PRESENTING OFFICE
3
Works & Development Directorate
Proposed CarParking and the Land Constraint
-
8/6/2019 Visit Skardu and Gilgit
4/31
NAME OF THE PRESENTING OFFICE
4
Works & Development Directorate
A Closer Look at the Car Parking
CAPACITY > 100 cars
-
8/6/2019 Visit Skardu and Gilgit
5/31
NAME OF THE PRESENTING OFFICE
5
Works & Development Directorate
The proposed lay out by APM Skardu
CAPACITY > 80 CARS
-
8/6/2019 Visit Skardu and Gilgit
6/31
NAME OF THE PRESENTING OFFICE
6
Works & Development Directorate
Existing portionNew extended portion
-
8/6/2019 Visit Skardu and Gilgit
7/31
NAME OF THE PRESENTING OFFICE
7
Works & Development Directorate
Material dumped in front of terminal building
-
8/6/2019 Visit Skardu and Gilgit
8/31
NAME OF THE PRESENTING OFFICE
8
Works & Development Directorate
Landscaping yet to be planned and developed
-
8/6/2019 Visit Skardu and Gilgit
9/31
NAME OF THE PRESENTING OFFICE
9
Works & Development Directorate
Proposed extensions for the roof to cover the steps
Also ramp required on the other side too
-
8/6/2019 Visit Skardu and Gilgit
10/31
NAME OF THE PRESENTING OFFICE
10
Works & Development Directorate
Legends:
Complete except door shutters and conveyor belt
Area Yet to be Constructed
Only Shell constructed
Demarcation of Areas
-
8/6/2019 Visit Skardu and Gilgit
11/31
NAME OF THE PRESENTING OFFICE
11
Works & Development Directorate
Overlapping of work yet to perform ..
-
8/6/2019 Visit Skardu and Gilgit
12/31
NAME OF THE PRESENTING OFFICE
12
Works & Development Directorate
-
8/6/2019 Visit Skardu and Gilgit
13/31
NAME OF THE PRESENTING OFFICE
13
Works & Development Directorate
-
8/6/2019 Visit Skardu and Gilgit
14/31
NAME OF THE PRESENTING OFFICE
14
Works & Development Directorate
Inset pic here
Ply Door shutters being pressed for Formica sheets pasting
-
8/6/2019 Visit Skardu and Gilgit
15/31
NAME OF THE PRESENTING OFFICE
15
Works & Development Directorate
Insert pic here paint
Good floor and ceiling tile work in Arrival Poor back box support for electrical outlets
-
8/6/2019 Visit Skardu and Gilgit
16/31
NAME OF THE PRESENTING OFFICE
16
Prevailing Key Concerns
1. User Move-In to the new area not done because Door shutters not installed.2. Ply Doors are on hold, apparently weather being reason.
3. Pressing Formica Sheets to Ply Sheets tried manually with poor workmanship.
4. No immediate work plan for contractor.
5. Some quality issues, like paint, wall tiles, and door shutters
6. No landscaping works planned
Works & Development Directorate
-
8/6/2019 Visit Skardu and Gilgit
17/31
NAME OF THE PRESENTING OFFICE
17
Measures for efficiency now onwards
1. Proper site management.2. Ownership of the project by the Works Directorate ( less power to APM )
3. Better communication and planning for the user to vacate the existing areas.
4. Encourage / Push contractor for speedy works.
Works & Development Directorate
-
8/6/2019 Visit Skardu and Gilgit
18/31
NAME OF THE PRESENTING OFFICE
18
Measures for better aesthetics
1. Its never too late to incorporate some of the basic features as beautifullyworked out by GM Arch.
1. Roof trusses should have been raised or Else proper RCC structure.
2. A dedicated plan and proposal for the Landscape
3. Main gates needs replacement,
Works & Development Directorate
-
8/6/2019 Visit Skardu and Gilgit
19/31
NAME OF THE PRESENTING OFFICE
GILGIT AIRPORT
19
Works & Development Directorate
-
8/6/2019 Visit Skardu and Gilgit
20/31
NAME OF THE PRESENTING OFFICE
20
Works & Development Directorate
The Existing Building
The site of new terminal building
Lay down area
-
8/6/2019 Visit Skardu and Gilgit
21/31
NAME OF THE PRESENTING OFFICE
21
Works & Development Directorate
-
8/6/2019 Visit Skardu and Gilgit
22/31
NAME OF THE PRESENTING OFFICE
22
Works & Development Directorate
-
8/6/2019 Visit Skardu and Gilgit
23/31
NAME OF THE PRESENTING OFFICE
23
Works & Development Directorate
layers yet to be placed
-
8/6/2019 Visit Skardu and Gilgit
24/31
NAME OF THE PRESENTING OFFICE
24
Works & Development Directorate
-
8/6/2019 Visit Skardu and Gilgit
25/31
NAME OF THE PRESENTING OFFICE
25
Works & Development Directorate
3600 ft of running water channel work
-
8/6/2019 Visit Skardu and Gilgit
26/31
NAME OF THE PRESENTING OFFICE
26
Works & Development Directorate
-
8/6/2019 Visit Skardu and Gilgit
27/31
NAME OF THE PRESENTING OFFICE
27
Works & Development Directorate
3600 ft of running water channel work
-
8/6/2019 Visit Skardu and Gilgit
28/31
NAME OF THE PRESENTING OFFICE
28
Works & Development Directorate
-
8/6/2019 Visit Skardu and Gilgit
29/31
NAME OF THE PRESENTING OFFICE
GILG
ITAIRP
ORT
Whats appreciable is
Proper site and material management by Works Staff
Quality of Runway carpet
Good command over drawings, and projects data by works staff.
29
-
8/6/2019 Visit Skardu and Gilgit
30/31
NAME OF THE PRESENTING OFFICE
GILG
ITAIRP
ORT
Areas of Improvement
Schedule of activities be developed with contractor.
Quantity of Reinforcement Steel.
Contractor be pushed for timely start of works (esp. after
winters)
More economical solutions for steel reinforcement should beworked.
30
-
8/6/2019 Visit Skardu and Gilgit
31/31
NAME OF THE PRESENTING OFFICE
THANK YOU