Agenda
1 Clarke Energy
2 GE Partnership
3 Projects
4 Tennant Creek
Upgrade
5 Owen Springs
Expansion
6 Questions
“Our commitment to an Incident
and Injury free workplace”
• IIF Leadership team
• Hazard risk register
• HAZOP meetings
• Rigorous contractor
qualification process
• IIF Alignment Workshop
• Site Level Safety Culture
Safety Culture
Introduction to thecompany
• Established 1989 in
UK as an engine
service company
• >1,000 employees
worldwide
• ISO accreditation
– 9001 Quality
– 14001 Environment
– OHSAS 18001 –
Health & Safety
• Queen’s Award for
International Trade
2014
Introduction to thecompany
• Develops high quality,
fuel efficient power
generation installations
• Has one focus - GE’s
reciprocating engines
• GE distributor & service
provider in 18 countries
• Over 5.0GWe of
Jenbacher installed
• Turnkey EPC contractor
• Full maintenance,
operation and overhaul
services maximising
equipment availability
89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
Company history
2012Distributor
for
Tanzania
2014Queen’s Award
for Enterprise –
International
Trade
2011Algeria
2008 Tunisia
2005Ireland
2003Acquired Cogen
India
2002First
Jenbacher
sales into
Africa
1998Australia,
New Zealand,
Nigeria
2004Acquired
Jenbacher
France
1989Established in
the UK as engine
service company
2013Acquired Orient
Energy Bangaldesh,
Agaricus & GE
Southern Africa
Service
2003GE
acquires
Jenbacher
1995Jenbacher
distributor
UK2015
Cameroon
2016USA
2016Papua New
Guinea
300 Engines (596 MW)
126 x
55 x
25 x
3 x
15 x
34 x12 x
30 x
After Sales Repairs andOverhaul
Commissioning
Maintenance
Agreements
Spare Parts
Field Service
Remote Monitoringand Diagnostics
Training
• Sales
• Technical
• Project Delivery
• Installation
• Commissioning
• Service & Maintenance
• Parts stockholding
• Engine Design
• Engine Development
• Engine Manufacture
• Parts Production
Partnership
GE‘s Reciprocating Engine Range
0.1 – 5.0 MW 5 – 25 MW
Power Generation
Diesel
*Trademark of General Electric Company• Multiple engine configurations L6, L8, V8, V12, V16, V20 & V24 • Medium-speed & High-speed Diesel, Lean-burn gas and Rich-burn gas engines
TYPE 2
250 kW – 330 kW
TYPE 3
500 kW – 1 MWType 4
800 kW – 1.5 MWType 6
1.5 MW – 4.4 MW
Type 9 (MS)
9.5 MW
VGF*
120 kW – 880 kW
VHP*
315 kW – 1.5 MW
275GL+*
1.9 MW – 3.6 MW
228 Diesel engines/
gensets 1.5 – 3.2 MW
616 Diesel
Genset 2.6 MW
250 Diesel engines/
gensets 1.5 – 4.5MW
Key project requirements/challenges
1. Island/remote grid
• Load demand 13 – 55 MW (average ~25 MW)
• High penetration of solar PV (~10 MW)
• Plant redundancy requirements (N-2 on gas), ideal unit
size 4 – 6 MW
• Frequency stability and inertia
Key project requirements/challenges
2. Gas variability
• Gas sources – Dingo (MN~80, LHV~32 MJ/NM3),
Mereenie (MN~60, LHV ~38 MJ/NM3)
• Must be able to operate on all gas qualities safely
without knocking or engine damage, including
continuous operation on low MN gas
• Must change over from one gas to the other
automatically and stay within network acceptable
frequency limits without tripping
Key project requirements/challenges
3. Other
• High efficiency and reliable plant
• High speed vs medium speed engines
• EPC Contract delivery requirement
• Long term parts supply and maintenance support
Tennant Creek Power Station Upgrade
Project feature Tennant Creek Power Station (TCPS) Upgrade
Capacity (MW) 7.5
Engine/fuel 3 x GE Jenbacher J612
Scope 3 gas engines, 1 diesel engine and all associated
mechanical, electrical, controls, and civil BOP
Delivery EPC Contract – fixed price, performance &
schedule guarantees
Contractor Clarke Energy Australia
Completion date Q3 2017
O&M By TGEN
LTMA with Clarke Energy for parts supply and
maintenance support
Tennant Creek Power Station Upgrade
LV & HV Switchrooms
Gas Gensets 3 x GEJ612
Genset Canopy
Fluid Storage
Standby Diesel
Auxiliary Transformers
Owen Springs Power Station – Expansion Project
Project feature Owen Springs Power Station (OSPS)
Expansion
Capacity (MW) 44
Engine/fuel 10 x GE Jenbacher J624
Scope 10 gas engines and all associated mechanical,
electrical, controls, and civil BOP
Delivery EPC Contract – fixed price, performance &
schedule guarantees
Contractor Clarke Energy Australia
Completion date Q4 2017
O&M By TGEN
LTMA with Clarke Energy for parts supply and
maintenance support
Owen Springs Power Station
Lube Oil Powerhouse
Exhaust Silencers
Gas Treatment
Workshop
Control Room
Radiators
HV Building
Subcontract & Supplier Opportunities
Owen Springs Tennant Creek
Electrical Installation works Electrical Installation works
Mechanical Installation works Mechanical Installation works
Powerhouse Building Cladding Structural steel
Structural steel Genset Canopy
Pipework packages Pipework packages
Hire Equipment Hire Equipment
ICN - OSPS & TCPS projects