Waiver #258 exists against this procedure. The waiver applies to use of the LAWPS Piping System in
lieu of Bentley AutoPIPE. This includes, but is not limited to, the Cross Flow Filter (CFF) piping
system and the associated Valve Skids (Build-to-Print) design. Full text of the waiver can be seen at
http://idmsweb/idms/livelink.exe/Open/214737579.
USQ #GCX-2
PREPARATION OF PIPING
ANALYSES FOR WASTE TRANSFER
SYSTEMS
Manual
Document
Page
Issue Date
Engineering
TFC-ENG-DESIGN-C-60, REV A-3
1 of 42
April 19, 2017
Ownership matrix Click for copy of Word (native) file
TABLE OF CONTENTS
1.0 PURPOSE AND SCOPE ................................................................................................................ 2 2.0 IMPLEMENTATION ..................................................................................................................... 2 3.0 RESPONSIBILITIES ...................................................................................................................... 2 4.0 PROCEDURE ................................................................................................................................. 3
4.1 General Methods ................................................................................................................. 4 4.2 Identify Inputs and Assumptions ........................................................................................ 5 4.3 Identify Design Conditions and Load Combinations .......................................................... 7 4.4 Determine Pressure and Stress Limits .............................................................................. 11 4.5 Perform Piping Stress Analysis ........................................................................................ 12 4.6 Prepare and Issue Analysis Report ................................................................................... 14
5.0 DEFINITIONS .............................................................................................................................. 15 6.0 RECORDS .................................................................................................................................... 15 7.0 SOURCES ..................................................................................................................................... 15
7.1 Requirements .................................................................................................................... 15 7.2 References ......................................................................................................................... 16
TABLE OF TABLES
Table 1. Inputs for Piping Analyses. .......................................................................................................... 18 Table 2. Assumptions for Piping Analyses. ............................................................................................... 21 Table 3. Screening Criteria. ....................................................................................................................... 23 Table 4. Pressure and Stress Allowances for ASME B31.3 Analyses. ...................................................... 25 Table 5. Pressure and Stress Limits for TSR AC 5.8.5 Analyses. ............................................................. 27 Table 6. Methods for Analyzing Seismic Loads. ....................................................................................... 31
TABLE OF ATTACHMENTS
ATTACHMENT A - FORMAT AND CONTENT OF PIPING ANALYSES .......................................... 32 ATTACHMENT B - SPEED OF SOUND DATA ..................................................................................... 34 ATTACHMENT C - EXAMPLE SCREENING CRITERION FOR COLUMN SEPARATION ............. 36 ATTACHMENT D - CREDIBLE OVER-PRESSURE CONDITIONS .................................................... 38
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
2 of 42
April 19, 2017
1.0 PURPOSE AND SCOPE (7.1.1, 7.1.2, 7.1.3)
This procedure provides methods and explains requirements for performing analyses of stresses
in waste transfer piping systems, or sub-systems, and related piping components.
This procedure applies to the analysis of new piping or modifications to existing piping that are
subject to the requirements in TFC-ENG-STD-22, and which are required to comply with the
requirements for design specified in ASME B31.3, “Process Piping.” Such analyses verify the
design stresses in piping systems due to internal pressure and longitudinal stress resulting from
sustained and occasional loads do not exceed the maximum allowable stress defined in
ASME B31.3.
This procedure also applies to evaluations of overpressure and flow transient conditions that may
occur in safety significant waste transfer systems (during a waste transfer) to satisfy the
requirements of Specific Administrative Control 5.8.5, “Waste Transfer System Overpressure
and Flow Transient Protection (SAC),” specified in HNF-SD-WM-TSR-006, “Technical Safety
Requirements,” TSR AC 5.8.5, and related specific administrative control (SAC) descriptions in
RPP-13033, “Tank Farms Documented Safety Analysis,” Section 4.5.7. Background information
necessary to understand transients and requisite analytical methods can be found in
RPP-RPT-54581, “Supplemental Basis Document for Waterhammer Calculations.”
Analyses and evaluations performed in accordance with this procedure also may be relied on to
fulfill the requirements for Defense in Depth Feature 29 (DID) in RPP-13033, Table 3.3.2.3.2-2,
“Other Defense in Depth Features (Non-Safety SSE and non-TSR Administrative Features).”
The methods, inputs, and assumptions defined in this procedure may be relied on in part to
evaluate waste transfer piping under the requirements established in RPP-RPT-52248, “Fitness
for Service Program Requirements,” or to evaluate piping which is not within the scope of
TFC-ENG-STD-22 and TSR AC 5.8.5, but which may be subject to requirements in ASME Code
Section B31.1, “Power Piping,” or Code Section B31.9, “Building Services Piping.”
2.0 IMPLEMENTATION
This procedure is effective on the date shown in the header and is applicable to evaluations and
analyses of waste transfer systems within its scope issued after the effective date.
Evaluations and analyses of flow transients (water hammer) issued prior to the effective date of
TFC-ENG-DESIGN-C-60, Revision A, will require confirmation that this methodology is met or
bounded as documented in a technical evaluation per TFC-ENG-FACSUP-C-03 prior to
satisfying the requirements of TSR AC 5.8.5, RPP-13033 Section 4.5.7 and/or DID Feature 29.
3.0 RESPONSIBILITIES
Responsibilities are contained within Section 4.0.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
3 of 42
April 19, 2017
4.0 PROCEDURE
This procedure defines the engineering activities required to prepare and issue pressure and stress
analyses of waste transfer systems and related piping supports as well as evaluations required by
TSR AC 5.8.5 and DID Feature 29. These analyses and evaluations demonstrate:
Requirements of ASME B31.3 are met for the design conditions of internal/external
pressure, sustained loads, and occasional loads for new or modified waste transfer
systems;
Requirements for DID Feature 29 are met, i.e., administrative and engineered features
credited to demonstrate that ASME B31.3 allowances are complied with, are identified as
DID features (note that engineered features are not required to be identified as DID if
there are no credible failure modes that prevent the credited function as documented [or
referenced] in the evaluation); and,
Requirements of TSR AC 5.8.5 are met, i.e., administrative and engineered features
credited to demonstrate that peak pressures and stresses resulting from potential waste
transfer pump or unanticipated overpressure or unanticipated flow transient during waste
transfer are less than limits established in the ASME Boiler and Pressure Vessel Code
(B&PVC), Section III, Division 1, Subsection ND for Service Level D (Section III), or
Code Case N-155-2 for Fiberglass Reinforced Thermosetting Resin (FRTR) pipe, Level
D Service Limits, are safety-significant SSCs or SACs (note that engineered features are
not required to be identified as safety significant if there are no credible failure modes
that prevent the credited function as documented [or referenced] in the evaluation).
The effects of a flow transient resulting from valve-induced water hammer, column separation, or
surge on waste transfer system are to be evaluated. As such, this procedure defines engineering
activities to:
Screen for the potential occurrence of a flow transient as a result of planned operations,
operator errors, or equipment failures; and
Evaluate peak pressures and stresses resulting from these events with respect to
ASME B31.3 allowances and Section III Service Level D limits or Code Case N-155-2
Level D Service Limits for FRTR piping, as applicable.
Note that if the action that initiates a postulated flow transient represents an off-normal event
(as in human error or equipment failure), the flow transient evaluation does not need to consider
additional independent events or failures such as waste transfer pump overpressure.
Waste transfer systems within the scope of this procedure may interact with pressure sources as
defined in TFC-ENG-STD-25 or other pressure sources established for conduct of maintenance
activities such as flushing or testing.
Piping design and analysis are iterative processes. As such, performance of the work steps
specified in this procedure may be performed out of sequence or repeated as needed to establish
analyses that are consistent with the requirements herein.
In cases where piping stress analyses prepared in accordance with this procedure are intended to
supplement prior approved calculations and examine specific load conditions not previously
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
4 of 42
April 19, 2017
considered, only those work steps relevant to the design condition(s) being examined are required
to be performed.
4.1 General Methods
The following general methods are applicable to all analyses prepared in accordance with this
procedure.
Analysis of waste transfer piping for the effects of a flow transient shall treat loads
resulting from such events as occasional loads for compliance with ASME B31.3. For
existing and new jumper designs, if compliance with RPP-RPT-58773, “Assessment of
Safety Significant Piping Jumpers to Assure Excess Load Capacity for Potential Water
Hammer (Leak Check and Flush) Events,” is demonstrated and operating conditions are
bounded within the assessment limits, then no specific flow transient analysis is required
for leak check and flushing activities in the 200E DST waste transfer system when
utilizing the applicable service water system. Service water system sources and
configurations evaluated are as documented in Rev 0 of RPP-RPT-58773.
Primary waste transfer piping that is encased within a secondary confinement boundary
shall be subject to the rules established for Normal Fluid Service in ASME B31.3.
(Ref. ASME B31.3, Appendix M)
Analytical methods for longitudinal stresses (SL) due to sustained loads such as pressure,
displacement, and weight were not clearly defined in earlier editions of the B31.3 Code
(2008 and before). Determination of SL was clarified by B31 Case 178 and is
incorporated in ASME B31.3-2010 where paragraph 320, supplemented by Appendix S,
may be used as a method for determining SL. If the applicable Code of Record contains
the method for determining SL (such as ASME B31.3-2010), that method shall be used.
FRTR piping is covered under ASME B31.3 Chapter VII, Nonmetallic Piping and Piping
Lined With Nonmetals. Chapter VII, paragraph A302.3, shall be used for nonmetallic
piping to determining stresses due to sustained loads.
There are two paths identified in this procedure, one for existing waste transfer systems and one
for new systems or modification(s) to existing systems.
Evaluation of existing systems does not necessarily require recreation of the ASME Code
analyses but does require the identification of engineered and/or administrative feature(s)
that would be required to stay within ASME B31.3 allowances.
New systems or modification(s) to existing systems require ASME B31.3 analyses as
prescribed in this procedure and ASME B31.3 and requires the identification of
engineered and/or administrative feature(s) that would be required to stay within
ASME B31.3 allowances. For new jumper design, compliance with RPP-RPT-58773,
demonstrates sufficient capacity to stay within ASME B31.3 allowances for pressure
transient cases to support leak check and flushing using the applicable service water
system within the 200E DST waste transfer system.
Both existing and new systems/modifications to existing systems require the TSR
AC 5.8.5 analyses prescribed in this procedure and the identification and implementation
of safety-significant support SSCs and/or SACs that mitigate or eliminate the problematic
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
5 of 42
April 19, 2017
condition(s) that would result in exceeding Section III Service Level D limits or Code
Case N-155-2 Level D Service Limits for nonmetallic piping.
4.1.1 Existing Waste Transfer Systems
Analyst 1. If engineered and/or administrative feature(s) are used to mitigate or
eliminate the problematic condition(s) that result in exceeding
ASME B31.3 allowances, identify these features as defense-in-depth
features.
2. Perform required steps for the TSR AC 5.8.5 analyses.
4.1.2 Identify Boundary of Analysis
Analyst 1. Identify the boundaries of the waste transfer system that is to be
analyzed using configuration-controlled documents.
2. Consider the scope described in ASME B31.3, paragraph 300.1, the
requirements in TFC-ENG-STD-22 and the physical configuration of
the existing or planned design.
3. For analyses required by TSR AC 5.8.5, consider the safety-significant
waste transfer primary piping system boundaries defined in RPP-13033,
paragraph 4.4.1.2. Waste transfer pump overpressure evaluations must
consider physically connected safety-significant waste transfer primary
piping systems, HIHTL primary hose assemblies, and isolation valves
for double valve isolation. (See RPP-13033, Section 3.3.2.4.3.5, for
definitions of physically connected.) Flow transient evaluations are
only required to consider the planned waste transfer route. The planned
waste transfer route includes the waste transfer primary piping systems,
HIHTL primary hose assemblies, and isolation valves for double valve
isolation that are pressurized by the waste transfer pump, or the gravity
head from the 242-A Evaporator vessel when the vessel contains waste,
up to the first closed isolation valve. The isolation valve is not required
to be safety significant with respect to through valve leakage. (See
RPP-13033, Section 3.3.2.4.3.5, for definitions of when the 242-A
Evaporator vessel contains waste).
4. Mark-up Piping and Instrumentation Diagrams (P&ID) and design
configuration drawings to depict waste transfer system to be analyzed
and its interconnections with other systems and process equipment.
4.2 Identify Inputs and Assumptions
The following inputs and assumptions apply to analyses prepared under this procedure.
4.2.1 Assemble Inputs
Analyst 1. Prepare a hydraulic grade diagram showing elevations of pressure
sources, discharge points, piping and components in the waste transfer
system being evaluated.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
6 of 42
April 19, 2017
2. For ASME B31.3 analyses, identify pressure sources and their
performance parameters (e.g., pressure, flow) (see Attachment D).
Pressure sources include but are not limited to:
Reservoirs – bounding density and elevation
Tanks – bounding density, elevation, and pressure
Pumps:
Parameters (i.e., head, flow, and discharge pressure) for
electrically-powered constant speed pumps shall be
determined by the manufacturer’s pump curve for the
pump/motor combination specified in the design.
Parameters for hydraulically- or pneumatically-powered
variable speed pumps shall be determined by the
manufacturer’s pump curve for the maximum pump
speed expected for operations (note that administrative
and engineered features credited in establishing the
maximum pump speed expected for operations need to
be considered for inclusion as DID features).
Parameters for electrically-powered variable speed
pumps shall be determined by the manufacturer’s pump
curve for the operating speed that corresponds to the
Overspeed Trip frequency defined per
RPP-CALC-23897, “VFD Driven Induction
Motor/Pump Performance Evaluation” (note that the
overspeed trip frequency needs to be considered for
inclusion as a DID feature).
3. For the TSR AC 5.8.5 analyses, identify pressure sources and their
performance parameters (e.g., pressure, flow).
For the hazard of overpressure, pump parameters shall be as
defined in TFC-ENG-STD-25, paragraph 3.4 (i.e., “unmitigated”
pump performance characteristics), unless safety-significant
SSCs or TSR SACs limit pump performance and the resulting
design conditions expected to act on interconnected piping.
For the hazard of a flow transient, pump parameters shall be as
defined in Step 2 above, i.e., consistent with analyses that
demonstrate requirements in ASME B31.3 are met, provided the
action that initiates the postulated flow transient is an
independent off-normal condition.
4. Assemble input data for the analysis (see Table 1). These data may be
supplemented by additional information as necessary to conduct the
analyses.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
7 of 42
April 19, 2017
4.2.2 Identify Assumptions
Analyst 1. Identify assumptions and the basis that are to be relied on for the
analysis.
Table 2 provides assumptions and basis that may be relied on in
the analyses.
4.3 Identify Design Conditions and Load Combinations
The following identify design conditions and load combinations applicable to the waste transfer
system for:
ASME B31.3 analyses; and,
TSR AC 5.8.5 analyses.
4.3.1 Identify Design Conditions and Load Combinations for ASME B31.3 Analyses
Analyst 1. Identify the pressure/temperature design conditions that shall be
considered in ASME B31.3 analyses, including but not limited to:
Pressure sources identified per Section 4.2.1, step 2
Elevation differences
Flow transients or surges (see step 2)
External pressure or differential pressure for negative pressure
service
Pressure relief provided in piping design shall be creditable in
determining the highest pressure that is expected to be imposed
on it, provided analysis of the relief design shows it complies
with requirements in ASME B31.3, paragraph 301.2.2 or A301
for nonmetallic piping (note that pressure relief features
credited in establishing the highest pressure that is expected
need to be considered for inclusion as DID features)
Fluid temperatures, ambient temperatures, solar radiation,
heating or cooling medium temperatures, and the applicable
provisions of ASME B31.3 paragraphs 301.3.2, 301.3.3, and
301.3.4 or A301 for nonmetallic piping (note that engineered
and administrative features credited in establishing these values
need to be considered for inclusion as DID features)
Operating pressure and temperature expected at maximum
metal or nonmetallic temperature conditions
Consider potentials for overpressure in Attachment D.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
8 of 42
April 19, 2017
2. Identify potential flow transient initiators (i.e., triggering events), see
Attachment D:
a. Examine piping system configuration and planned operations
and maintenance activities such as flushes or tests and identify
anticipated (i.e. planned and expected) events that may cause
changes in fluid momentum in piping and resulting surge, valve-
induced water hammer, or elevation-induced column separation.
b. Identify valve operations:
1) Where technical procedures anticipate valve
manipulation during conduct of waste transfer, flushing,
or testing, whether manual or automatic. Valve
operations do not need to consider inadvertent pump
operations when the procedure verifies that the pump is
not operating before the valve operation and therefore
are not considered transient initiators; or,
2) Where valves re-position automatically in the event of
loss of power or control (i.e., valves which “fail open” or
“fail closed”)
3) Screen each valve operation identified as a triggering
event for the potential occurrence of valve-induced water
hammer, according to the screening criteria in
Table 3(a).
c. Identify pump operations:
1) For planned filling of a voided piping system; and,
2) For planned pump start, stop, and emergency stop or
trip.
d. Identify cases where pressure sources (e.g., pump start, valve
opening) re-established pressure to waste transfer systems that
support a column separation condition per the screening criteria
in Table 3(b).
3. Identify the design pressure, P0, and design temperature, T0, for the
system analyzed per ASME B31.3, paragraph 301or A301 for
nonmetallic piping, for the conditions identified in Step 1 above or as
specified in design media, whichever is more conservative:
The pressure at the most severe condition of coincident internal
or external pressure and temperature (minimum or maximum)
expected during service.
4. Identify the design minimum temperature for the system analyzed per
ASME B31.3, paragraph 301 or A301 for nonmetallic piping, for the
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
9 of 42
April 19, 2017
conditions identified in Step 1 above or as specified in design media,
whichever is more conservative.
5. Identify load combination for ASME B31.3 analysis of the Sustained
Load case: design conditions shall be consistent with requirements in
ASME B31.3, paragraph 320 or paragraph A302.3.3 for nonmetallic
piping.
6. Identify load combination for ASME B31.3 analysis of Occasional
Loads for the seismic case:
Design conditions (i.e., pressure and temperature) shall be
consistent with the Sustained Load case. This loading shall be
combined with seismic loads applicable to the performance
category and structural design criteria specified for the piping
(including anchor and nozzle movements)
Consider all potential load combinations for seismic
acceleration inputs:
Positive horizontal and positive vertical
Positive horizontal and negative vertical
Negative horizontal and positive vertical
Negative horizontal and negative vertical.
7. Identify load combination for ASME B31.3 analysis of Occasional
Loads for the flow transient case:
a. Identify the design conditions (e.g., pressure and temperature)
from Step 1 where screening criteria in Table 3(a) or 3(b) show
potential flow transients require a detailed analysis.
For valve operations, design conditions at the time of a
triggering event shall be those which produce the maximum
expected flow through the system, considering the pressure
source and fluid characteristics examined.
For pump operations, design conditions for surge into empty
piping shall evaluate interconnected pumps operating at run-out
flow, discharging into piping that is at atmospheric pressure;
and,
Design conditions for column separation shall consider the fluid
studied at its highest expected temperature for normal operation
– ensuring the lowest potential vapor pressure for the fluid
studied is considered in the analysis.
8. Identify anchor and nozzle movements and the number of cycles
(cold-to-hot-to cold) for any thermal case expected over design life of
the system.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
10 of 42
April 19, 2017
9. Identify any other load cases not considered in this procedure that
warrant analysis to fully demonstrate compliance with ASME B31.3
requirements. See ASME B31.3 para. 301.5 Dynamic Effects.
4.3.2 Identify Design Conditions for TSR AC 5.8.5 Analyses
Analyst 1. Identify the pressure/temperature conditions that shall be considered in
the TSR AC 5.8.5 analyses, including but not limited to:
Pressure sources identified per Section 4.2.1, Step 3
Elevation differences
Flow transients or surges (see Step 2)
External pressure or differential pressure for negative pressure
service
Fluid temperatures, ambient temperatures, solar radiation,
heating or cooling medium temperatures, and the applicable
provisions of ASME B31.3 paragraphs 301.3.2, 301.3.3, and
301.3.4 orA301 for nonmetallic piping; and
Operating pressure and temperature expected at maximum
metal or nonmetallic temperature conditions.
2. Identify potential flow transient initiators (i.e., triggering events) for
analyses required by TSR AC 5.8.5:
a. Examine piping system configuration and operations activities to
be performed when TSR AC 5.8.5 SAC is applicable and
identify unanticipated events (i.e. unplanned events resulting
from operator error [see Attachment D, D.1.3] or single
independent or common mode failures) that may cause changes
in fluid momentum in piping and resulting surge, valve-induced
water hammer, or elevation-induced column separation.
b. Identify unanticipated valve operation during the waste transfer
in cases where technical procedures allow or otherwise provide
for valve manipulation during conduct of the waste transfer (may
include flushing, or testing, whether manual or automatic if
performed during the waste transfer). Valve operations do not
need to consider inadvertent pump operations when the
procedure verifies that the pump is not operating before the valve
operation and therefore are not considered transient initiators.
c. Screen each valve operation identified as a triggering event for
the potential occurrence of valve-induced water hammer,
according to the screening criteria in Table 3(a).
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
11 of 42
April 19, 2017
d. Identify cases where pressure sources (e.g., pump start, valve
opening) re-established pressure to waste transfer systems that
support a column separation condition per the screening criteria
in Table 3(b).
3. Identify the design condition (i.e., the pressure at the most severe
condition of coincident internal or external pressure and temperature
[minimum or maximum] expected during service) from Step 1,
excluding flow transients or surge, for TSR AC 5.8.5 overpressure
analyses.
4. Identify the design conditions for TSR AC 5.8.5 flow transient analyses:
a. Identify the design conditions (i.e., the pressure at the most
severe condition of coincident internal or external pressure and
temperature [minimum or maximum] expected during service)
from Step 1 where screening criteria in Table 3(a) or 3(b) show
potential flow transients require a detailed analysis.
b. For valve operations, design conditions at the time of a
triggering event shall be those that produce the maximum
expected flow through the system, considering the pressure
source and fluid characteristics examined.
c. For pump operations, design conditions for surge into empty
piping shall consider interconnect pumps operating at run-out
flow, discharging into empty piping at atmospheric pressure.
d. Design conditions for column separation shall consider the fluid
studied at its highest expected temperature for normal operation
– ensuring the lowest potential vapor pressure for the fluid
studied is considered in the analysis.
4.4 Determine Pressure and Stress Limits
The following steps identify pressure and stress limits applicable for:
ASME B31.3 analyses and
TSR AC 5.8.5 analyses.
4.4.1 Determine Pressure and Stress Allowances for ASME B31.3 Analyses
Analyst 1. Identify pressure design limits for analysis of internal pressure and
potential overpressure due to sustained and occasional loads per
Table 4(a).
2. Identify stress design limits for analysis of longitudinal stress due to
sustained and occasional loads, including seismic, flow transient, and
other dynamic effects (see ASME B31.3, para. 301.5), per Table 4(b).
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
12 of 42
April 19, 2017
3. Identify stress design limits for pipe supports and pipe support welds
based on the structural design criteria described in Table 4(c).
4. Identify allowable displacement stress range for piping to account for
thermal effects of changes in piping temperature per Table 4(d).
5. As alternative to direct calculation, values for pressure and stress
limits for pipe, pipe supports, and support welds calculated in
RPP-CALC-54447, “Piping Structural Analysis Methodology for
Evaluation of Waterhammer,” provided the materials and conditions
considered in that analysis are valid for the piping system being
evaluated.
4.4.2 Determine Pressure and Stress Limits for TSR AC 5.8.5 Analyses
Analyst 1. Identify pressure limits for analysis of overpressure and flow transients
per Table 5(a).
2. Identify stress limits for analysis of longitudinal stress due to
overpressure and occasional loads, including seismic and flow
transients, per Table 5(b).
3. Select a method from Table 5(c) and determine the stress limits for pipe
supports and pipe support welds, if supports are credited to limit piping
stresses.
4.5 Perform Piping Stress Analysis
Analyze waste transfer system based on the inputs, assumptions, design limits, and load
conditions defined in this procedure.
Evaluation of sustained and occasional loads, including flow transients, and their effects on the
waste transfer system is a calculation-intensive process which is normally accomplished by the
use of commercially available software programs. The following software packages shall be used
to analyzing the waste transfer systems unless prior approval is obtained from the Chief Engineer
for use of alternative software:
Structural evaluation – Bentley AutoPIPE™
Input for structural analysis of flow transient – AFT Impulse™.
4.5.1 Perform ASME B31.3 Analyses
Analyst 1. Model the waste transfer system based on documented inputs and
assumptions and methods specified for approved software.
2. Perform an AFT Impulse™ flow transient analysis for the design
condition(s) identified for detailed examination in Section 4.3, and
determine peak pressure expected to result from the triggering event
considered for flow transients. This provides inputs forces and loads for
structural analysis of flow transient conditions using Bentley
AutoPIPE™.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
13 of 42
April 19, 2017
3. Perform the ASME B31.3 analyses based on the piping system model
and identified design conditions. (See Table 6 for methods for
analyzing seismic loads.)
4. Evaluate the results of the ASME B31.3 code case analyses.
a. If internal pressures and calculated stresses do not exceed ASME
B31.3 allowances, analysis is complete; skip step b.
b. If ASME B31.3 allowances are exceeded, mitigate or eliminate
the problematic condition(s) by one more of the following
methods in order preference: (1) redesign, (2) engineered
feature(s), and/or (3) administrative feature(s). Re-analyze
piping system accordingly.
5. If engineered and/or administrative feature(s) are used to mitigate or
eliminate the problematic condition(s) that result in exceeding
ASME B31.3 allowances, identify these features as defense-in-depth
features.
4.5.2 Perform TSR AC 5.8.5 Analyses
Analyst 1. Model the waste transfer system based on documented inputs and
assumptions and methods specified for approved software. Develop TSR
AC 5.8.5 cases for input into the model:
Overpressure
Flow Transient.
2. Perform an AFT Impulse™ flow transient analysis for the design
condition(s) identified for detailed examination in Section 4.3 and
determine peak pressure expected to result from the triggering event
considered for flow transients. This provides inputs forces and loads for
structural analysis of flow transient conditions using Bentley
AutoPIPE™.
3. Perform the TSR AC 5.8.5 analyses based on the piping system model
and identified design conditions for overpressure and flow transient
cases. See Table 6 for methods for analyzing seismic loads.
4. Evaluate the results of the TSR AC 5.8.5 analyses:
a. If the identified ASME B31.3 allowances are not exceeded,
analysis is complete; skip step b.
b. If Section III Service Level D limits or Case N-155-2 limits for
nonmetallic piping as applicable are exceeded, identify and
implement safety-significant support SSCs and/or SACs that
mitigate or eliminate the problematic condition(s).
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
14 of 42
April 19, 2017
4.5.3 Analyze Piping Supports for ASME B31.3 Analyses
Analyst 1. Determine the governing reaction forces, and moments at supports,
anchors, and nozzles due to sustained and occasional load stresses,
including flow transients.
2. For the ASME B31.3 analyses, analyze pipe supports and support welds
per criteria in AISC “Manual of Steel Construction.”
3. Evaluate the results of the ASME B31.3 analyses:
a. If calculated stresses in pipe supports and support weld do not
exceed AISC limits and addition requirement s for nonmetallic
piping as applicable (see paragraph A321), analysis is complete;
skip step b.
b. If AISC limits are exceeded, mitigate or eliminate the
problematic condition(s) by one or more of the following
methods in order of preference: (1) redesign, (2) engineered
feature(s), and/or (3) administrative feature(s). Re-analyze pipe
supports accordingly.
4.5.4 Analyze Piping Supports for TSR AC 5.8.5 Analyses
1. Determine the governing reaction forces, and moments at supports,
anchors, and nozzles due to sustained and occasional load stresses,
including flow transients.
2. For the TSR AC 5.8.5 analyses, if required, analyze pipe supports and
support welds per the method selected in Section 4.4.2, Step 3.
3. Evaluate the results of the TSR AC 5.8.5 analyses:
If calculated stresses in pipe supports and support weld do not
exceed the limits, analysis is complete; skip step b.
If the limits are exceeded, a new method may be selected and
new limits determined per Section 4.4.2, Step 1, and the
supports and support welds re-analyzed, or the pipe supports
cannot be credited in the TSR AC 5.8.5 analyses.
4.6 Prepare and Issue Analysis Report
TFC-ENG-DESIGN-C-10 describes the process for preparing, processing, and revising a Piping
Analysis Report.
All calculations shall be checked and verified as required by TFC-ENG-DESIGN C-52 or other
governing design verification procedure.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
15 of 42
April 19, 2017
5.0 DEFINITIONS
ASME B31.3 Allowances. Criteria (e.g., allowable(s), allowances, criteria, design, limit(s),
maximum, minimum, rating, etc.) used to meet ASME B31.3 requirements (i.e., ASME B31.3
Code compliant), usually preceded or followed by the term “shall” in ASME B31.3 and referring
to loads, pressures, stresses, temperatures, thicknesses, etc.
New Piping. Piping systems, subsystems, and components, or modifications thereto, that are
designed, constructed, and examined after issuance of this procedure.
Piping. Assemblies of piping components used to convey, distribute, mix, separate, discharge,
meter, control, or snub fluid flows. Piping also includes pipe-supporting elements, but does not
include support structures, such as building frames, bents, foundations, or any equipment
excluded from the scope of the ASME B31.3 Code.
Piping Components. Mechanical elements suitable for joining or assembly into pressure-tight
fluid-containing piping systems. Components include pipe, tubing, fittings, flanges, gaskets,
bolting, valves, and devices such as expansion joints, flexible joints, pressure hoses, traps,
strainers, inline portions of instruments, and separators.
Piping Subassembly. A portion of a piping system that consists of one or more piping
components.
Piping System. Interconnected piping subject to the same set or sets of design conditions.
6.0 RECORDS
The following records are generated during the performance of this procedure:
Engineering calculations per TFC-ENG-DESIGN-C-10 or other governing engineering
calculation procedure.
The record custodian identified in the Company Level Records Inventory and Disposition
Schedule (RIDS) is responsible for record retention in accordance with
TFC-BSM-IRM_DC-C-02.
7.0 SOURCES
7.1 Requirements
1. HNF-WM-SD-TSR-006, “Tank Farms Technical Safety Requirements.”
2. RPP-13033, “Tank Farms Documented Safety Analysis.”
3. TFC-ENG-STD-22, “Piping, Jumpers, and Valves.”
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
16 of 42
April 19, 2017
7.2 References
1. AISC, Manual of Steel Construction.
2. ANSI/API Standard 521, 5th Edition, January 2007 (including Errata June 2007),
Addendum May 2008, “Pressure-relieving and Depressuring Systems,” American
Petroleum Institute, Washington, D.C.
3. ASCE 7, “Minimum Design Loads for Buildings and Other Structures.”
4. ASME B31.1, “Power Piping,” American Society of Mechanical Engineers, New York,
New York.
5. ASME B31.3, Process Piping, American Society of Mechanical Engineers, New York,
New York.
6. ASME B31.9, “Building Services Piping,” American Society of Mechanical Engineers,
New York, New York.
7. ASME Boiler and Pressure Vessel Code Section III, Division 1, American Society of
Mechanical Engineers, New York, New York.
8. ASME Boiler and Pressure Vessel Code Section VIII, American Society of Mechanical
Engineers, New York, New York.
9. ARH-ST-133, “Vapor-Liquid-Solid Phase Equilibria of Radioactive Sodium Salt Wastes
at Hanford.”
10. Crane TP-410, Flow of Fluids through Pipes, Valves, and Fittings.
11. Moody, F.J., Introduction to Unsteady Thermofluid Mechanics, John Wiley & Sons,
1990.
12. NISTIR 5078, Thermodynamic Properties of Water, October 1998.
13. RPP-14859, “Specification for Hose-in-Hose Transfer Line and Hose Jumpers.”
14. RPP-22668, “River Bend Transfer Systems Hose Roughness Calculation.”
15. RPP-CALC-23897, “VFD Driven Induction Motor/Pump Performance Evaluation.”
16. RPP-CALC-54447, “Piping Structural Analysis Methodology for Evaluation of
Waterhammer.”
17. RPP-RPT-27570, “Development of PC2 Surface Spectra for Double-Shell Tank Facilities
18. RPP-RPT-50042, “Bulk Modulus and Sonic Velocity Estimates for Double-Shell Tank
Supernatants.”
19. RPP-RPT-52248, “Fitness for Service Program Requirements.”
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
17 of 42
April 19, 2017
20. RPP-RPT-54884, “Review of 2” Safe-T-Chem Hose Waterhammer Testing
21. RPP-RPT-54492, “Single-Shell Tank Sluicer Piping Drainability Assessment.”
22. RPP-RPT-54581, “Supplemental Basis Document for Waterhammer Calculations.”
23. RPP-RPT-58773, “Assessment of Safety Significant Piping Jumpers to Assure Excess
Load Capacity for Potential Water Hammer (Leak Check and Flush) Events.”
24. TFC-BSM-IRM_DC-C-02, “Records Management.”
25. TFC-ENG-DESIGN-C-10, “Engineering Calculations.”
26. TFC-ENG-DESIGN-C-52, “Technical Reviews.”
27. TFC ENG FACSUP-C-03, “Technical Evaluations.”
28. TFC-ENG-STD-02, “Environmental/Seasonal Requirements for TOC Systems,
Structures, and Components.”
29. TFC-ENG-STD-06, “Design Loads for Tank Farm Facilities.”
30. TFC-ENG-STD-21, “Hose-in-Hose Transfer Lines.”
31. TFC-ENG-STD-25, “Transfer Pumps.”
32. TFC-PLN-03, “Engineering Program Management Plan.”
33. WHC-SD-W236A-DA-002, “Stress Analysis of Integral Seal Block (ISB) Jumper
Connectors,” 1995, Westinghouse Hanford Company.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
18 of 42
April 19, 2017
Table 1. Inputs for Piping Analyses.
Table 1(a). General Inputs for ASME B31.3 and TSR AC 5.8.5 Analyses
Item Description of Typical Input
1. Pipe material and dimensional specifications, including:
ASTM or API specification, type, grade, and method of manufacture; dimensional standard listed in
ASME B31.3 Table 326.1 or Table A326.1 as applicable
Nominal pipe size and wall thickness, and mill tolerance
Weld Joint Quality Factor, Ej or Ec, attributable to the method of manufacture per ASME B31.3
paragraph 302.3.4 for other than seamless pipe
If non-metallic pipe or non-ASTM or non-API material is used, include the pipe manufacturer catalog
sheets with material properties in Appendix E of the piping analysis.
2. Pipe fitting material and dimensional specifications, including:
Fitting and joint type – including flanges, elbows, tees, reducers, and unions; ASTM material
specification, type, and grade
Nominal pipe size and pressure class, dimensional standard listed in ASME B31.3 Table 326.1
State if there are unlisted or otherwise non-standard fittings used in the piping analysis.
3. Valve and piping component details and specifications, including:
Component type, governing specification listed in ASME B31.3, Table 326.1 or Table A326.1 as
applicable; material specification, type, and grade
Nominal pipe size; pressure class or rating, limiting conditions of temperature
State if there are unlisted components used in piping; for unlisted components, state qualification basis
under the terms of ASME B31.3, paragraph 302.2.3.
Provide valve and other component data sheets in the piping analysis report, including component length
and weight. For valves with heavy operators that are to be modeled as an eccentric weight, state valve
operator size, weight, length, and offset of the center of gravity.
4. Bolting material specification (if bolting is used in design), including material type and grade
5. Insulation thickness and density (if used in design)
6. Corrosion-erosion allowance and expected service life
For austenitic stainless steel piping and carbon steel piping, the corrosion-erosion allowance is
determined in accordance with requirements in TFC-ENG-STD-22 for the expected service life of the
system.
For unlisted piping components compliant with TFC-ENG-STD-21, “Hose in Hose Transfer Lines”
and TFC-ENG-STD-22 (i.e., HIHTLs and synthetic rubber hose jumpers), the corrosion-erosion
allowance used for pressure design may be neglected. Service life of these components is determined
by requirements in RPP-14859, “Specification for Hose-in-Hose Transfer Line and Hose Jumpers”.
7. Specific gravity of fluids confined by piping, including bounding value for evaluation of limiting
conditions
8. Properties for flexibility analysis:
Thermal expansion and modulus of elasticity attributable to piping material per ASME B31.3,
Appendix C
Piping temperature during field installation, if known.
Pipe support friction (required per ASME B31.3, paragraph 319.4.3)
Flexibility analysis for nonmetallic piping shall meet ASME B31.3 paragraph A319.
9. Environmental conditions to which piping is subjected, per TFC-ENG-STD-02, “Environmental/Seasonal
Requirements for TOC Systems, Structures, and Components” for the performance category assigned to
piping and supports
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
19 of 42
April 19, 2017
Table 1. Inputs for Piping Analyses. (cont.)
Table 1(b). Inputs for ASME B31.3 Seismic Analyses
Item Description of Typical Input
1. For static analysis:
TFC-ENG-STD-06, “Design Loads for Tank Farm Facilities” static load parameters SDS and IP shall be
identified in the piping analysis report;
ASCE-7, “Minimum Design Loads for Buildings and Other Structures” static load parameters aP, RP,
and z/h shall be determined by the analyst, with justification documented in Appendix G of the piping
analysis report.
2. For dynamic modal analysis, the applicable input in-structure seismic response spectra shall be per PC2
spectra defined in RPP-RPT-27570, “Development of PC2 Surface Spectra for Double-Shell Tank
Facilities,” where :
SDS = 0.588, SDI = 0.192
the design response spectrum curve should be scaled-up by the factor, FE where FE = IP KE / RP, and:
Ip = importance factor to be assigned by the Project
Rp = response modification factor for piping systems, based on ASCE-7 but not to exceed 3.
KE = (1 + 2 z/h) where z = maximum elevation with respect to grade of pipe support attachment to
building and h = average roof elevation with respect to grade
Amplification due to piping flexibility, ap, equals 2.5
The analyst may choose to input the referenced spectra and then scale the resulting values by the ratio of
the 90% participating mass summation in the direction of loading with the minimum horizontal load
requirement of ASCE 7, Eqn 13.3-2 or Eqn 13.3-3.
3. For all analyses of the occasional load of seismic motion, the reference for anchor motions should be
provided, if available, or the calculation of anchor motions should be documented in Appendix I of the
report if they are calculated by the analyst.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
20 of 42
April 19, 2017
Table 1. Inputs for Piping Analyses. (cont.)
Table 1(c). Inputs for ASME B31.3 and TSR AC 5.8.5 Analyses of Flow Transient
Item Description of Typical Input
1. For hand calculations of screening criteria or simple configurations, a bounding value for speed of sound in
piping shall be determined using the following fluid properties or other properties attributable to the
specific fluid evaluated:
For liquids, per Attachment B, Table B-1, for the specific gravity of the fluid considered, as corrected
to account for temperature: add or subtract the difference between sound speed for water in Table B-2
at the temperature evaluated and the value for 30 deg C.
For water, the speed of sound shall be based on NISTIR 5078, “Thermodynamic Properties of Water,”
October 1998, or ASME Steam Tables
For slurry, the effects of solids on sound speed in metallic piping shall be accounted for per Attachment B,
Eqn. B-2 (ref. RPP-RPT-50042, “Bulk Modulus and Sonic Velocity Estimates for Double-Shell Tank
Supernatants”).
2 The speed of sound for non-rigid piping comprised of HIHTLs or hose jumpers compliant with RPP-14859
and within the restrictions of RPP-RPT-54884 is 1,892 ft/sec. (Ref. RPP-RPT-54884, “Review of 2” Safe-
T-Chem Hose Waterhammer Testing”)
3. For determining system flow:
Losses through valves shall be based on valve flow coefficient (Cv) tables or characteristics of valve
type (i.e., linear, equal percentage, or quick opening)
Friction factors for HIHTL material and hose-based jumpers shall be based on the results in RPP-
22668, “River Bend Transfer Systems Hose Roughness Calculation.”
4. Design features for elevation control (such as air vents, vacuum breaks, or passive siphon breaks) that are
creditable based on documented failure modes analyses of such features.
5. Point of flush or test water introduction, if provided, and direction(s) of flow for flush water or test water.
Table 1(d). Specific Inputs for ASME B31.3 and TSR AC 5.8.5 Analyses
Item Description of Typical Input
FOR ASME B31.3 PIPING ANALYSES:
1. Stress Intensification and Flexibility Factors (SIF) for elbows and welding tees shall be calculated per
ASME B31.3, Appendix D. For non-standard fittings, indicate the SIF used, the technical basis, and
reference for same. ASME paragraph 319.4 may be applicable for nonmetallic piping (See paragraph
A319.4.2). Determine SIF for use with nonmetallic piping per ASME Boiler and Pressure Vessel Code
Case N-155-2 -3673.
FOR TSR AC 5.8.5 ANALYSES:
2. Equations for SIF in Section III, Division 1, paragraph ND-3600 shall be utilized, or Section III SIFs may
be used with hand calculations that convert moments from an ASME B31.3 analysis to Section III results.
For non-standard fittings, indicate the SIF used, the technical basis, and reference for same.
Determine SIF for use with nonmetallic piping per ASME Boiler and Pressure Vessel Code Case N-155-2
-3673.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
21 of 42
April 19, 2017
Table 2. Assumptions for Piping Analyses.
Table 2(a). General Assumptions for ASME B31.3 and TSR AC 5.8.5 Analyses
Item Description of Typical Assumption
1. Flexible metallic and non-metallic hoses and HIHTLs that are qualified as unlisted components per
ASME B31.3, installed in accordance with manufacturer’s instructions, and operated within their rated
design conditions, are adequate to resist longitudinal forces acting on them and effectively isolate
longitudinal stress due to axial forces, bending moments, and torsion between rigid piping structures.
Basis: Flexible nature of hose materials, qualification status as an unlisted piping component.
2. If temperature of piping at time of installation is unknown, analysis shall employ values of thermal
displacement that are based on the following metal temperatures at time of installation:
80° F, when considering the thermal displacement at minimum metal temperature.
60° F, when considering the thermal displacement at maximum metal temperature.
Basis: Reasonably conservative estimate for thermal flexibility analysis.
Table 2(b). Assumptions for ASME B31.3 Seismic Analyses
Item Description of Typical Assumption
1. For static analyses of the occasional load of seismic motion:
the EW and NS spectra are assumed as equal, unless otherwise specified by seismic design criteria;
the vertical spectra are assumed as 0.2 SDS, unless otherwise specified by seismic design criteria.
Basis: TFC-ENG-STD-06
2. Anchor motions below 1/8 inch may be ignored.
Basis: Equivalent to typical pipe-to-support gaps
3. For modal analyses, PUREX connectors at the connector/nozzle interface shall be modeled using the
following stiffness factors:
Connector
Size
Kux (lbf/in) Kuy (lbf/in) Kuz (lbf/in) Krotx (lbf-
in/rad)
Kroty (lbf-
in/rad)
Krotz (lbf-
in/rad)
2-Inch 1.35e+7 2.78e+4 2.78e+4 7.38e+4 4.53e+5 4.53e+5
3-Inch 1.90e+7 2.47e+4 2.47e+4 1.02e+5 9.16e+5 9.16e+5
4-Inch 2.33e+7 2.52e+4 2.52e+4 2.09e+5 1.43e+6 1.43e+6 Reference WHC-SD-W236A-DA-002 Table 3.5, Connector Stiffnesses to Piping Reaction Loads and Figure 1
Coordinate System for more details.
Basis: WHC-SD-W236A-DA-002
4. There are no structures with performance category classifications that allow them to fail under the effects
of seismic motion in a manner that may damage safety significant piping.
Basis: TFC-ENG-STD-06
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
22 of 42
April 19, 2017
Table 2. Assumptions for Piping Analyses. (cont.)
Table 2(c). Assumptions for B31.3 and TSR AC 5.8.5 Analyses of Flow Transient
Item Description of Typical Assumption
1. For computing system flow:
Computations of pressure loss through PUREX connectors shall treat such connectors as 90-degree
miter bends.
Basis: Comparison of PUREX connector details with typical 90-degree miter bend designs
Simplified computations that determine bounding values for steady state system flow may be
performed using the hand calculation methods described in Crane TP-410, “Flow of Fluids through
Pipes, Valves, and Fittings,” where friction factors for steel pipe are as specified for fully turbulent
flow.
Basis: Crane TP-410, conservatism
2. For determining flow transient loads due to surge:
In absence of other verifiable basis, the ramp-up time for variable- and constant-speed pumps from full
stop to the target operating speed shall be assumed to be instantaneous. Instantaneous is considered
< 0.1 seconds when a discrete time is required by software.
Basis: Conservatism
3. For determining operating time of manual or automatically actuated valves:
Operating duration of manually operated valves fitted with a direct operating lever or handle shall be
assumed to be instantaneous, unless other basis is specified, or unless valve operation is controlled by a
safety-significant SSC or SAC under the procedural controls governing Tank Farms administration,
engineering, and operation.
Basis: Conservatism
Operating duration of automatically actuated valves shall be assumed to be the actual valve operating
time observed for opening or closing during acceptance or operational testing, unless the operator has a
failure mode that may result in faster closure. In such an event, the fastest credible valve closing time
associated with failure shall be used.
Basis: Ensures representative conditions are analyzed
4. For determining the disturbance time used to analyze valve operations:
Disturbance time for valve closure shall be the operating time required to reduce system flow from
80% of maximum steady-state flow to zero
Basis: Reasonable conservative estimate that ensures the installed characteristics of pressure drop versus
flow through valves being operated in the piping system are modeled:
5. For determining the hydraulic conditions used to analyze potential column separation events:
Passive design features that vent waste transfer piping (e.g., open siphon breaks or recirculation
branches leading back to a tank) may be credited in determining the maximum pressure in piping,
provided there are no credible failure mechanisms (e.g., plugging or submergence) that may render
such features inoperable.
Basis: As specified in a documented evaluation of potential failure modes and effects on operability.
The elevation of the location at which the liquid column reaches the maximum velocity is
conservatively assumed to be where the void pocket extends.
Basis: Conservatism
The vapor pressure of waste can be conservatively modeled as the vapor pressure of water if additional
data is not available. However, if data exists to show that for a given route the vapor pressure is
higher, such data may be used.
Basis: ARH-ST-133, “Vapor-Liquid-Solid Phase Equilibria of Radioactive Sodium Salt Wastes at
Hanford,” ASME Steam Tables
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
23 of 42
April 19, 2017
Table 3. Screening Criteria.
Table 3(a). Screening Criteria for Valve Operation Transient
1. Compute
propagation time, tp Compute propagation time according to the formula: 𝑡𝑝 =
2𝐿
𝐶𝑓𝑝 where:
𝐿 = Distance from valve to tank, pump, or reservoir.
Cfp = Speed of sound associated with the fluid retained in the piping system; or
adjusted to account for the effects of non-rigid pipe or tube (see Attachment B).
2. Determine
disturbance time, tdi
For valves assumed to act instantaneously, td= 0.
For valves where closure time is definable (see inputs), determine disturbance time
according to the installed flow characteristics of the valve:
Identify the valve position (in terms of percent open) at which system flow is reduced to
80% of maximum flow.
td = time required to close the valve from this position, as a fraction of the overall closure
time identified in input data.
3. Screen disturbance
time for potential flow
transient
Where td is more than 10 x tp, no further analyses of flow transient effects for this
triggering event are required.
Where td is less than or equal to 10 x tp, a detailed analysis of the flow transient shall
be performed per this procedure.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
24 of 42
April 19, 2017
Table 3. Screening Criteria. (cont.)
Table 3(b). Screening Criteria for Column Separation Transient
1. Examine piping
system
Examine the piping system layout as identified in inputs:
Identify changes in elevation along the route, elevation controls for inspirating or
aspirating piping, presence of check valves, and attributes of discharge point, including
potential for submergence.
2. Screen for self-
draining piping
The waste transfer system is considered drained if there are no standing columns
(i.e., filled pipe) and not that the waste transfer system is completely drained of fluid. Free
draining is the process that leaves the waste transfer system drained.
For waste transfer systems that allow free draining to source and discharge points, this
mitigates the potential for column separation to occur. [e.g.: Piping systems that
incorporate qualified passive siphon breaks at or near hydraulic high points (see inputs and
assumptions)] No further analyses of flow transient associated with column separation are
required for these systems.
Engineered and/or administrative feature(s) (e.g., vacuum breakers, valve manipulation to
vent or drain) can be credited for the ASME B31.3 analyses and shall be identified as
defense-in-depth (DID Feature 29) and the system can be considered free draining for the
ASME B31.3 analyses. (Note: Engineered features are not required to be identified as
defense-in-depth features if there are no credible failure modes that prevent the credited
function as documented [or referenced] in the evaluation.).
Engineered and/or administrative feature(s) (e.g., vacuum breakers, valve manipulation to
vent or drain) can be credited for the TSR AC 5.8.5 analyses and shall be identified as
safety-significant support SSCs or TSR SACs. (Note: Engineered features are not
required to be identified as safety-significant if there are no credible failure modes that
prevent the credited function as documented [or referenced] in the evaluation.).
In cases where the discharge point is not submerged under any planned operating
conditions or single-mode failures, and where there are no obstructions or area reductions
at the discharge point that may accumulate material, the piping may be assumed to drain
freely from its nearest interconnected hydraulic high point, provided the internal diameter
at the discharge point is equal to or greater than that specified by the method defined in
RPP-RPT-54492, “Single-Shell Tank Sluicer Piping Drainability Assessment”.
3. Determining
column height criteria
and screening waste
transfer system
Determine the fluid column height (screening criteria, see Attachment C for example) that
can be supported by a vacuum equal to the vapor pressure of fluid being analyzed. This
height is then used to screen the waste transfer system under analysis. If the waste transfer
system does not have a column of fluid greater than or equal to the screen height, no
further analyses of flow transient associated with column separation are required for these
systems.
In cases where standing column heights are equal to or greater than the screening
criteria, column separation is credible and a detailed analysis of the potential flow
transient shall be performed per this procedure.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
25 of 42
April 19, 2017
Table 4. Pressure and Stress Allowances for ASME B31.3 Analyses.
Table 4(a). Internal Pressure Allowances for ASME B31.3 Analyses
Basic requirement: Stress in piping due to internal pressure including anticipated flow transient that may occur
during waste transfer, flushing, or test operations, shall not exceed the basic allowable stress provided for in
ASME B31.3, Table A-1 and related Code requirements and allowances.
Acceptance criteria: Internal pressure in piping due to sustained or occasional loads shall be considered safe when
it is less than the Design Pressure (𝑃𝐵31.3 𝐷𝑒𝑠𝑖𝑔𝑛) of piping and components, including any variation in pressure
allowable under the terms of ASME B31.3, paragraph 302.2.4. Allowances for variations of pressure or
temperature, or both, above design conditions are not permitted for nonmetallic piping per ASME B31.3, Chapter
VII, paragraph A302.2.4.
Item Criteria
1. Design Pressure 𝑃𝐵31.3 𝐷𝑒𝑠𝑖𝑔𝑛(ASME B31.3 Section 304)
For straight pipe determine the required pipe minimum wall thickness (account for mill tolerance,
corrosion allowance, threading), per ASME B31.3, para. 304.1,
For pipe bends determine the required pipe minimum wall thickness after bending, per ASME B31.3,
para. 304.2.
For listed components (including valves), per their qualified internal pressure rating or other limit
determined by their specified pressure class.
For listed components with no established rating (e.g. fittings per ASME B16.9 or B16.11), equivalent
to straight seamless pipe of the same dimensions, with wall thickness 87.5% of nominal. See ASME
B31.3, paragraph 302.2.2.
For unlisted components, per their qualified internal pressure rating.
2. Variations in pressure are allowable for internal pressures up to 20% over the pressure rating or the
allowable stress for pressure design at the temperature, provided the limitations specified in ASME B31.3,
paragraph 302.2.4 are met. Variations up to 33% are allowable if these limitations are met and owner’s
approval is provided.
3. Design Pressure 𝑃𝐵31.3 𝐷𝑒𝑠𝑖𝑔𝑛 for nonmetallic piping (ASME B31.3 Section A304)
For straight pipe determine the required pipe minimum wall thickness (account for mill tolerance,
corrosion allowance, threading), per ASME B31.3, para. A304.1,
For pipe bends determine the required pipe minimum wall thickness after bending, per ASME B31.3,
para. A304.2.
For listed components (including valves), per their qualified internal pressure rating or other limit
determined by their specified pressure class.
For listed components with no established rating ASME B31.3, paragraph A302.2.2 shall be met.
For unlisted components, per their qualified internal pressure rating.
4. Allowances for variations of pressure or temperature, or both, above design conditions are not
permitted for nonmetallic piping. See ASME B31.3, Chapter VII, paragraph A302.2.4.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
26 of 42
April 19, 2017
Table 4. Pressure and Stress Allowances for ASME B31.3 Analyses. (cont.)
Table 4(b). Stress Allowances for ASME B31.3 Analyses
Basic requirement: Longitudinal stress in piping (SL) due to sustained or occasional loads, including anticipated
flow transient occurring during waste transfer, shall not exceed the basic allowable stress provided for in
ASME B31.3, Table A-1, and related Code requirements and allowances.
Acceptance criteria: Longitudinal stresses in piping shall be considered safe when calculated stresses are less than
or equal to allowances established by the following criteria:
Item Criteria
1. Longitudinal stress SL in piping due to sustained loads shall not exceed the basic allowable stress at the
maximum metal temperature condition (Sh) provided for in ASME B31.3, Table A-1, and related Code
requirements and allowances, when computed according to ASME B31.3, eq. 23a. (see ASME B31.3 para.
302.3.5(c), Stresses Due to Sustained Loads, SL)
2. Longitudinal stress in piping SL due to occasional loads such as seismic, or anticipated flow transient loads
occurring during waste transfers shall not exceed 1.33 times the basic allowable stress at the maximum
metal temperature condition provided for in ASME B31.3, Table A-1, when computed according to ASME
B31.3, eq. 23a. (see ASME B31.3 para. 302.3.6, Limits of Calculated Stresses Due to Occasional Loads,
for additional limitations)
3. Stresses due to sustained loads for nonmetallic piping shall meet the requirements of ASME B31.3
paragraph A302.3.3.
4. Stresses due to occasional loads for nonmetallic piping shall meet the requirements of ASME B31.3
paragraph A302.3.4.
Table 4(c). Stress Allowances for Piping Supports in ASME B31.3 Analyses
Basic requirement: Maximum working stress in pipe supports and support welds resulting from waste transfer,
flush, and test operations shall not cause failure of the piping system.
Acceptance criteria: Structural design of piping supports shall be considered adequate provided the following
criteria are satisfied:
Item Criteria
1. For analyses of sustained and occasional loads, design criteria for piping supports shall be per AISC Steel
Construction Manual.
Table 4(d). Allowable Stress Range for ASME B31.3 Thermal Flexibility Analyses
Basic requirement: Piping systems shall have sufficient flexibility to prevent thermal expansion or contraction or
movements of piping supports and terminals from causing failure, leakage at joints, detrimental stresses or
distortion in piping and valves or in connected equipment.
Acceptance criteria: Thermal flexibility of piping shall be considered adequate when the criteria in ASME B31.3,
Section 319 (Section A319 for nonmetallic piping) are satisfied.
Item Criteria
1. The calculated displacement stress range, SE, shall not exceed the allowable stress range, SA, determined
per ASME B31.3, eq. 1a or 1b, independent of longitudinal stress.
2. Reaction forces shall not be detrimental to supports or connected equipment.
3. Nonmetallic piping shall meet the requirements of ASME B31.3 Section A319.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
27 of 42
April 19, 2017
Table 5. Pressure and Stress Limits for TSR AC 5.8.5 Analyses.
Table 5(a). Internal Pressure Limits for TSR AC 5.8.5 Analyses.
Basic requirement: Internal pressure in waste transfer piping due to sustained overpressure or unanticipated flow
transient during waste transfer shall not exceed the limits specified in ASME B&PV Code Section III, Division 1,
Subsection ND for Service Level D. Internal pressure in waste transfer piping due to sustained overpressure or
unanticipated flow transient during waste transfer in nonmetallic piping shall not exceed the limits specified in
ASME B&PV Code Case N-155-2 for nonmetallic piping meeting the requirements as specified in the Reply on
page 1 of the Case N-155-2 or the limits of ASME B31.3 Chapter VII if the requirements in the Reply are not met.
Acceptance criteria: Stresses due to overpressure or unanticipated flow transient in piping shall be within
TSR AC 5.8.5 failure limits when the internal pressure is less than or equal to limits established by the following
criteria (Items 1-3 for piping and Items 4-6 for nonmetallic piping):
Item Criteria
1. Determine the internal pressure capacity 𝑃𝑎
For straight pipe, the pressure Pa is calculated in accordance with ASME B&PV Section III, Division 1,
Subsection ND eq. ND-3641.1(5). (see ND-3641.1 Straight Pipe Under Internal Pressure.)
For pipe bends, account for wall thinning due to bend (see ND-3642.1 Pipe Bends)
For listed components (including valves), per their qualified internal pressure rating or other limit
determined by their specified pressure class.
For listed components with no established rating (e.g. fittings per ASME B16.9 or B16.11), equivalent
to straight seamless pipe of the same dimensions, with wall thickness 87.5% of nominal.
For unlisted components, per their qualified internal pressure rating.
2. TSR AC 5.8.5 overpressure failure limits are the criteria for Service Level D in ASME B&PV Section III
Division 1, Subsection ND:
For listed pipe, fittings, and bends, or unlisted piping components other than valves, per Section III,
paragraph ND-3650:
𝑃 ≤ 2𝑃𝑎
For valves, per Section III, paragraph ND-3520:
𝑃 ≤ 1.5𝑃𝑎
Where
𝑃 = pressure identified in Section 4.3.2, Step 3,
𝑃𝑎 = pressure capacity of the pipe and piping components as determined Item 1 above.
3. TSR AC 5.8.5 fluid transient failure limits are the criteria for Service Level D in ASME B&PV Section III
Division 1, Subsection ND:
For listed pipe, fittings, and bends, or unlisted piping components other than valves, per Section III,
paragraph ND-3650:
𝑃0 + 𝛥𝑃 ≤ 2𝑃𝑎
For valves, per Section III, paragraph ND-3520:
𝑃0 + 𝛥𝑃 ≤ 1.5𝑃𝑎
Where
𝑃𝑂 = design pressure,
ΔP = additional pressure due to unmitigated operation or flow transient
𝑃𝑎 = pressure capacity of the pipe and piping components as determined Item 1 above.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
28 of 42
April 19, 2017
Table 5. Pressure and Stress Limits for TSR AC 5.8.5 Analyses. (cont.)
4. Determine the internal pressure capacity P for nonmetallic piping
ASME B&PV Code Case N-155-2
For straight pipe, the pressure P is the lesser value calculated in accordance with ASME B&PV Code
Case N-155-2 eq. -3641.1(2) and (4). (see -3641.1 Straight Pipe Under Internal Pressure.)
For pipe bends, account for wall thinning due to bend (see ND-3642.1 Pipe Bends)
For listed components (including valves), per their qualified internal pressure rating or other limit
determined by their specified pressure class.
For listed components with no established rating (e.g. fittings per ASME B16.9 or B16.11), equivalent
to straight seamless pipe of the same dimensions, with wall thickness 87.5% of nominal.
For unlisted components, per their qualified internal pressure rating.
ASME B31.3 Determine Design Pressure/Pressure rating P
For straight pipe determine the required pipe minimum wall thickness (account for mill tolerance,
corrosion allowance, threading), per ASME B31.3, para. A304.1,
For pipe bends determine the required pipe minimum wall thickness after bending, per ASME B31.3,
para. A304.2.
For listed components (including valves), per their qualified internal pressure rating or other limit
determined by their specified pressure class.
For listed components with no established rating ASME B31.3, paragraph A302.2.2 shall be met.
For unlisted components, per their qualified internal pressure rating.
5. TSR AC 5.8.5 overpressure failure limits are:
ASME B&PV Code Case N-155-2 criteria for Service Level D:
For listed pipe, fittings, and bends, or unlisted piping components other than valves -3611.2(c)(4):
𝑆 =𝑃𝑚𝑎𝑥𝐷𝑜
2(𝑡𝑚𝑐−𝐵) [derived from -3641.1 Equation (2)]
𝑆 ≤ 1.8𝑆𝐴𝐶𝑃 (SACP from Table -3611-1)
For valves, per Section III, paragraph ND-3520 [see Case N-155-2, Reply (c) page 1]:
𝑃𝑚𝑎𝑥 ≤ 1.5𝑃
ASME B31.3
𝑃𝑚𝑎𝑥 ≤ 𝑃
Where
𝑃𝑚𝑎𝑥 = pressure identified in Section 4.3.2, Step 3,
P = pressure capacity of the pipe and piping components as determined Item 4 above.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
29 of 42
April 19, 2017
Table 5. Pressure and Stress Limits for TSR AC 5.8.5 Analyses. (cont.)
6. TSR AC 5.8.5 fluid transient failure limits are
ASME B&PV Code Case N-155-2 criteria for Service Level D:
For listed pipe, fittings, and bends, or unlisted piping components other than valves [-3611.2(c)(4)]:
𝑆 =(𝑃0+𝛥𝑃)𝐷𝑜
2(𝑡𝑚𝑐−𝐵) [derived from -3641.1 Equation (2)]
𝑆 ≤ 1.8𝑆𝐴𝐶𝑃 (SACP from Table -3611-1)
For valves, per Section III, paragraph ND-3520 [see Case N-155-2, Reply © page 1]:
𝑃0 + 𝛥𝑃 ≤ 1.5𝑃
ASME B31.3
𝑃0 + 𝛥𝑃 ≤ 𝑃
Where
𝑃𝑂 = design pressure,
ΔP = additional pressure due to unmitigated operation or flow transient
P = pressure capacity of the pipe and piping components as determined Item 4 above.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
30 of 42
April 19, 2017
Table 5. Pressure and Stress Limits for TSR AC 5.8.5 Analyses. (cont.)
Table 5(b). Stress Limits for TSR AC 5.8.5 Analyses
Basic requirement: Longitudinal stress in piping due to potential overpressure and due to anticipated or
unanticipated flow transient resulting from waste transfer shall not exceed the limits specified in ASME B&PV
Section III, Division 1, paragraph ND-3655 for Service Level D. Longitudinal stress in piping due to potential
overpressure and due to anticipated or unanticipated flow transient resulting from waste transfer in nonmetallic
piping shall not exceed the limits specified in ASME B&PV Code Case N-155-2 for nonmetallic piping meeting
the requirements as specified in the Reply on page 1 of the Case N-155-2 or the limits of ASME B31.3 Chapter
VII if the requirements in the Reply are not met.
Acceptance criteria: Longitudinal stresses in piping due to potential overpressure or flow transient shall be within
TSR AC 5.8.5 failure limits when calculated stresses are less than or equal to limits established by the following
criteria (Item 1 for piping and Item 2 for nonmetallic piping):
Item Criteria
1. TSR AC 5.8.5 failure limits are the criteria for Service Level D in ASME B&PV Section III, paragraph
ND-3655: SL (ND−3650) ≤ min(3Sh, 2Sy), where:
𝑆𝐿 (𝑁𝐷−3650) is computed according to the formula in Section III,
Sh is the material allowable stress at temperature consistent with the loading under consideration, and
Sy is the material yield strength at temperature consistent with the loading under consideration.
2. TSR AC 5.8.5 failure limits are
ASME B&PV Code Case N-155-2 criteria for Service Level D [-3611.2(c)(4)] :
The sum of the longitudinal stresses produced by internal pressure, thermal expansion, live and dead load,
and those produced by occasional loads identified in the Design Specifications as acting during the Service
Loadings [NCA-2142(a)] for which these limits are designated shall not exceed 1.8 times the allowable
longitudinal stress SALP in Table -3611-1. This requirement is satisfied by meeting eq. -3652.2(9), using a
stress limit of 1.8𝑆𝐴𝐿𝑃 in lieu of1.2𝑆𝐴𝐿𝑃.
ASME B31.3:
Requirements of A302.3.4 Limits of Calculated Stresses Due to Occasional Loads
Table 5(c). Stress Limits for Piping Supports in TSR AC 5.8.5 Analyses
Basic requirement: Stress in pipe supports and support welds due to sustained overpressure or unanticipated
hydraulic transients resulting from waste transfer, flush, and test operations that are credited to limit piping
stresses, shall not exceed the limits of the selected method below.
Item Criteria
1. Pipe supports stress limits shall be determined by one of the following methods:
ASME B31.3,
American Institute of Steel Construction (AISC) Manual of Steel Construction,
ASME Section III Subsection NF, using the Level D allowable stresses,
AISC N-690 or
ASME III, Appendix F.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
31 of 42
April 19, 2017
Table 6. Methods for Analyzing Seismic Loads.
Methods for Seismic Analysis:
1. As an option, the stress amplitude from seismic anchor motion may be excluded from the occasional stress
combination, provided it is added to the thermal expansion stress range SE and compared to the allowable stress SA.
2. Seismic anchor motions are typically applied at terminal anchors, such as equipment nozzles
3. The analyst may analyze the piping system using static or modal response spectra analysis to determine
additional loading due to seismic motion, as specified requirements for the waste transfer piping analyzed.
For Static Analysis of seismic motion:
4. The directional combination of acceleration may be the maximum (EW + vertical) and (NS + vertical); or by
combining the three directions (EW, NS, and vertical) using Square Root of Sum of Squares method.
For Modal Spectra Response Analysis of Seismic Motion:
5. Spectra input to model:
The spectra (frequency-acceleration or period-acceleration) shall be entered to the same degree of refinement
and same interpolation method for frequencies and accelerations as provided in specifications defining seismic
motion for the performance class assigned to the piping analyzed.
If the spectra input into the model are not identical to those supplied specified in requirements, the entered spectra
shall be plotted against the spectra defined in requirements to document that they either match or envelope the
specified spectra.
6. Modes shall be combined by Square Root of Sum of Squares method.
7. The analysis shall apply the 10% closely spaced mode penalty correction.
8. The response spectra analysis should have a cut-off frequency in the rigid range of the input spectra, but not
less than 33 Hz.
9. The dynamic analysis should include the rigid range correction to account for modes beyond the cut-off
frequency.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
32 of 42
April 19, 2017
ATTACHMENT A - FORMAT AND CONTENT OF PIPING ANALYSES
Waste transfer system piping analyses shall include the content as specified in TFC-ENG-DESIGN-C-10,
Attachment A as well as include the following appendices:
Appendix A – Marked-Up P&ID
Highlighted P&ID: color highlighted P&ID of the in-scope piping indicating continuation
points from sheet to sheet
Appendix B – Piping and Support Configuration Design
Plan, elevation and/or isometric views of the in-scope piping and supports indicating
continuation points from sheet to sheet
Include field data, transmittals, photographs, surveys, etc. that supplement the information in
piping and support configuration designs
Appendix C – Model Isometrics
Include computer-generated plots of model sections with node numbers.
For large models, include a general view plot and then plots of parts of the models.
Appendix D – Model Input-Output
Include a full input-output.
This input-output printout, numbered D-1 through D-last page will be referenced throughout
the calculation, when referring input or output.
Appendix E – Pipe and Insulation Specifications
Provide catalog sheets for non-standard sizes, provide catalog specification for insulation and
jackets showing linear weight
Appendix F – Valve and Non-Standard Components:
Include manufacturer reference information (catalog pages with relevant dimensions,
shapes, etc.);
Provide valve data sheets showing valve length and weight, and operator size, weight, length,
and offset of the center of gravity if there is a heavy operator to be modeled as an eccentric
weight.
Provide manufacturer catalog pages showing properties used (such as valve length, thickness,
weight, operator center of gravity, etc.).
For non-standard fittings also include the reference documents for SIFs and flexibility factors
Appendix G – Load Input
This Appendix will typically compile the basis for non-standard input such as input for loads
calculated or obtained by the analyst, such as thermal anchor motions, seismic (inertia and
waterhammer), waterhammer, snow and ice loads, wind loads, etc.
The seismic input should provide reference for the parameters used to develop the vertical
and lateral seismic load, or the response spectra for the NS, EW, and vertical directions, and
the anchor motions
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
33 of 42
April 19, 2017
ATTACHMENT A – FORMAT AND CONTENT OF PIPING ANALYSES (cont.)
Appendix H – Pipe Supports
Report pertinent information on pipe supports: Input, modeling, and output for qualification,
or reference the applicable parts of Appendix B.
If supports are analyzed and qualified as part of the calculation, include supports calculations
in this Appendix
Appendix I – Equipment Interface
State reference for thermal, seismic, and settlement movements at terminal anchors or nozzles
(with reference).
Report pertinent information on equipment nozzles and building penetrations: Input,
modeling, and output loads and movements for qualification
Appendix J – Other Information
This Appendix is at the discretion of the analyst, and may include correspondence not
captured in the other Appendices
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
34 of 42
April 19, 2017
ATTACHMENT B - SPEED OF SOUND DATA
Table B-1. Speed of Sound in Liquid at Selected Specific Gravities*
Property Units 1.1 Sg 1.2 Sg 1.3Sg 1.4 Sg Reference
c ft/s 5462 5970 6512 6872 RPP-RPT-50042
* Refer to RPP-RPT-50042 for guidance on values outside the Specific Gravity range shown here
Table B-2. Speed of Sound in Water at Selected Temperatures
Temp [°C] Speed of sound [m/s] Temp [°F] Speed of sound [ft/s]
0 1,403 32 4,603
5 1,427 40 4,672
10 1,447 50 4,748
20 1,481 60 4,814
30 1,507 70 4,871
40 1,526 80 4,919
50 1,541 90 4,960
60 1,552 100 4,995
70 1,555 120 5,049
80 1,555 140 5,091
90 1,550 160 5,101
100 1,543 180 5,095
200 5,089
212 5,062
b. Accounting for Effect of Non-Rigid Pipe and Solids on Sound Speed:
For hand calculations of simple piping systems or evaluation of screening criteria, speed of sound in a
piping system may consider the effects of a non-rigid tube or pipe in the manner described by Moody1.
𝐶𝑓𝑝 = 𝐶√1
1+𝐷𝑌𝐿 𝛿𝑌𝑝⁄ Eq. B-1
where: 𝑌𝐿 = 𝜌𝐶2
𝐶𝑓𝑝 = Modified fluid-and-tube speed of sound
C = Speed of sound based on fluid alone
D = Inside diameter of tube or pipe,
δ = Tube or pipe wall thickness
Yp = Modulus of tube or pipe (see below),
YL = Modulus of the fluid
Modulus of tube or pipe 𝑌𝑝 shall be based on the material used in the route (typically steel pipe or
composite hose/pipe systems).
1Moody, F.J. “Introduction to Unsteady Thermofluid Mechanics” John Wiley & Sons, 1990.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
35 of 42
April 19, 2017
ATTACHMENT B – SPEED OF SOUND DATA (cont.)
For slurry, the effect of solids on sound speed can be accounted for by following Section 7.0 of
RPP-RPT-50042, as follows:
𝐶𝑓𝑝_𝑠 = √1/𝜌𝑚
(1−𝛼𝑠
𝐾𝐿)+
𝛼𝑠𝐾𝑠
+ 𝐷 (𝑌𝑝𝛿)⁄ Eq. B-2
where:
𝐶𝑓𝑝_𝑠 = Modified fluid-and-pipe speed of sound, including effect of solids
ρm = slurry density
αs = solids volume fraction of slurry
KL = liquid bulk density
Ks = solids bulk density
D = hydraulic diameter of pipe
Yp = Modulus of pipe
δ = pipe thickness
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
36 of 42
April 19, 2017
ATTACHMENT C - EXAMPLE SCREENING CRITERION FOR COLUMN SEPARATION
Figure C-1 supports using water as a bounding parameter for vapor pressure.
Figure C-1. Vapor Pressure of Various Fluids.
The screening criteria for fluid column height used in determining the potential for column separation
may be computed according to the following formula:
Hcrit = Patm – Pvapor / g ρ Eqn. C-1
where:
Hcrit = critical height for an unsupported column
Patm = atmospheric pressure
Pvapor = vapor pressure of fluid
ρ = density of fluid
g = acceleration due to gravity
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
37 of 42
April 19, 2017
ATTACHMENT C – EXAMPLE SCREENING CRITERION FOR COLUMN SEPARATION
(cont.)
As an example of the screening criteria for fluid column height used in determining the potential for
column separation, consider:
Water at 140F, the vapor pressure of water is 2.89 psi.
At an elevation of 1000 feet above sea level atmospheric pressure is 14.07 psia.
The density of water at 140F is less than 62 lb/ft3 but this value is used with the maximum specific
gravity of 1.48.
The tallest column of fluid that can be supported by a vacuum equal to the vapor pressure of water under
these conditions may be computed as follows:
The recommended bounding screening criterion is set at 17.5 feet. Refinement of this value may be
determined for any specific application based on specific design conditions.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
38 of 42
April 19, 2017
ATTACHMENT D - CREDIBLE OVER-PRESSURE CONDITIONS
D.1 OVERPRESSURE PROTECTION PHILOSOPHY
D.2 Double Jeopardy
(API 521 Section 4.2.1) “The causes of overpressure are considered to be unrelated if no process
or mechanical or electrical linkages exist among them, or if the length of time that elapses
between possible successive occurrences of these causes is sufficient to make their classification
unrelated. The simultaneous occurrence of two or more unrelated causes of overpressure (also
known as double or multiple jeopardy) is not a basis for design. Examples of double-jeopardy
scenarios are fire exposure simultaneous with exchanger internal tube failure, fire exposure
simultaneous with failure of administrative controls to drain and depressure isolated equipment,
or operator error that leads to a blocked outlet coincident with a power failure. On the other hand,
instrument air failure during fire exposure may be considered single jeopardy if the fire exposure
causes local air line failures.
This International Standard describes single-jeopardy scenarios that should be considered as a
basis for design. The user may choose to go beyond these practices and assess multiple jeopardy
scenarios. Since such assessments are outside the basis for design, the user is not required to
meet accumulations allowed by the pressure-design code for these scenarios. Acceptance criteria
are the sole responsibility of the user.”
D.1.2 Latent Failures
(API 521 Section 4.2.2) “Latent failures should normally be considered as an existing condition
and not as a cause of overpressure when assessing whether a scenario is single or double
jeopardy. For example, latent failures can exist in instrumentation that prevents it from
functioning favorably during an overpressure condition. It is not double jeopardy to assume the
absence of beneficial instrumentation response in combination with an unrelated overpressure
cause. Likewise, it is not double jeopardy to assume a latent failure of a check valve allowing
reverse flow during a pump failure.”
D.1.3 Operator Error
(API 521 Section 4.2.3) “Operator error is considered a potential source of overpressure.”
Operator error is considered if an operation is required to be performed (e.g., a valve is required
to be manipulated but a different valve is manipulated) and not when operations are not required
(e.g., operator manipulates a valve when it is not required by procedure).
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
39 of 42
April 19, 2017
ATTACHMENT D – CREDIBLE OVER-PRESSURE CONDITIONS (cont.)
D.1.4 Role of Instrumentation in Overpressure Protection
(API 521 Section 4.2.4) “Fail-safe devices, automatic start-up equipment and other conventional
instrumentation should not be a substitute for properly sized pressure-relieving devices as
protection against single-jeopardy overpressure scenarios. There can be circumstances, however,
where the use of pressure-relief devices is impractical and reliance on instrumented safeguards is
needed. Where this is the case, if permitted by local regulations, a pressure-relieving device
might not be required.” (See ASME Code Case 2211 and ASME B&PVC, Section VIII,
Division 1, UG-140 Overpressure Protection by System Design)
D.2 POTENTIALS FOR OVERPRESSURE
Pressure vessels, heat exchangers, operating equipment and piping are designed to contain the
system pressure. The design is based on
a) the normal operating pressure at operating temperatures;
b) the effect of any combination of process upsets that are likely to occur;
c) the differential between the operating, and set pressures of the pressure-relieving device;
d) the effect of any combination of supplemental loadings such as earthquake and wind.
The process-systems designer shall define the minimum pressure-relief capacity required to
prevent the pressure in any piece of equipment from exceeding the maximum allowable
accumulated pressure. The principal causes of overpressure listed in D.2.1 through D.2.19 are
guides to generally accepted practices.
D.2.1 Regulator and Control Valve Failure
The failure of a single pressure regulator or a single control valve must be assumed, using the Cv
for a fully open regulator, and the maximum supply pressure.
D.2.2 Centrifugal Pumps
The accidental pumping against a closed or clogged line, i.e. the centrifugal pump deadhead must
be considered and the PRD must be sized for the maximum pump discharge flow.
D.2.3 Closed outlets on vessels
See API 521 Section 4.3.2.
D.2.4 Inadvertent Valve Opening
The inadvertent opening of any valve from a source of higher pressure.
See API 521 Section 4.3.3.
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
40 of 42
April 19, 2017
ATTACHMENT D – CREDIBLE OVER-PRESSURE CONDITIONS (cont.)
D.2.5 Check-Valve Leakage or Failure
One scenario which can occur is when a check valve fails to close when the flow first reverses,
but frees itself because of the reverse flow, then slams shut, causing water hammer severe enough
to cause loss of containment. This type of incident has occurred many times in such diverse
operations as power generation, municipal water distribution, and chemical plant fire-water
distribution and water distribution.
See API 521 Section 4.3.4.
D.2.6 Utility Failure
See API 521 Section 4.3.5.
D.2.7 Electrical or Mechanical Failure
See API 521 Section 4.3.6.
D.2.8 Loss of Fans
See API 521 Section 4.3.7.
D.2.9 Loss of Heat
See API 521 Section 4.3.8.
D.2.10 Loss of Instrument Air or Electric Instrument Power
See API 521 Section 4.3.9.
D.2.11 Reflux Failure
See API 521 Section 4.3.10.
D.2.12 Abnormal Heat Input from Reboilers
See API 521 Section 4.3.11.
D.2.13 Heat Exchanger Tube Failure
See API 521 Section 4.3.12.
D.2.14 Transient Pressure Surges
(API 521 Section 4.3.13)
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
41 of 42
April 19, 2017
ATTACHMENT D – CREDIBLE OVER-PRESSURE CONDITIONS (cont.)
D.2.15 Water Hammer
The probability of hydraulic shock waves, known as water hammer, occurring in any liquid-filled
system should be carefully evaluated. Water hammer is a type of overpressure that cannot be
controlled by typical pressure-relief valves, since the response time of the valves can be too slow.
The oscillating peak pressures, measured in milliseconds, can raise the normal operating pressure
by many times. These pressure waves damage the pressure vessels and piping where proper
safeguards have not been incorporated. Water hammer is frequently avoided by limiting the
speed at which valves can be closed in long pipelines. Where water hammer can occur, the use of
pulsation dampeners or special bladder-type surge valves should be considered, contingent on
proper analysis.
D.2.16 Steam Hammer
An oscillating peak-pressure surge, called steam hammer, can occur in piping that contains
compressible fluids. The most common occurrence is generally initiated by rapid valve closure.
This oscillating pressure surge occurs in milliseconds, with a possible pressure rise in the normal
operating pressure by many times, resulting in vibration and violent movement of piping and
possible rupture of equipment. Pressure-relief valves cannot effectively be used as a protective
device because of their slow response time. Avoiding the use of quick-closing valves can prevent
steam hammer.
D.2.17 Condensate-Induced Hammer
Isolation of a steam bubble by cold condensate can lead to the eventual rapid collapse of the
bubble and catastrophic damage to steam pipework. Proper design and operation of the process
system are essential in attempts to eliminate this possibility (e.g. by the use of drains, steam traps,
appropriate pipe slope, training and careful management of change).
The hazard is particularly acute during turnaround and maintenance activities where dead-legs
that trap a steam bubble can be inadvertently created. Pressure-relief devices cannot effectively
be used as a protective device.
D.2.18 Plant Fires
See API 521 Section 4.3.14.
D.2.19 Process Changes/Chemical Reactions
See API 521 Section 4.3.15.
D.2.20 Closed Outlets
See API 521 Section 5.5
ENGINEERING
PREPARATION OF PIPING ANALYSES
FOR WASTE TRANSFER SYSTEMS
Document
Page
Issue Date
TFC-ENG-DESIGN-C-60, REV A-3
42 of 42
April 19, 2017
ATTACHMENT D – CREDIBLE OVER-PRESSURE CONDITIONS (cont.)
D.2.21 Failure of Process Stream Automatic Controls
See API 521 Section 5.10
D.2.22 Hydraulic Expansion
See API 521 Section 5.14
API 521 Section 5.14.4 Piping provides a method for evaluating if piping with blocked-in liquid
may not require a pressure relief device due to thermal expansion. An equation for calculating a
pressure rise due to simultaneous heating of the pipe and blocked-in liquid is provided.