Memo: TO: Haysville Board of Education
FR: B.J. Knudson, Executive Director of Operations
DA: February 26th, 2018
RE: Hunter Hawkeye Elite Alignment System
We are asking for a resolution authorizing Haysville USD 261 to enter into contract with K & M tire to
provide the Hawkeye Hunter Alignment System for the Campus High School automotive shop. The cost
of the alignment equipment is $27,050.
Bid Results:
K&M Tire $27,050.00
Poorman Auto Supply $29,623.67
Jordan Hunter Services LLC $38,009.00
Four D Hunter Services LLC $38,159.00
USD 261 Service Center1745 W. Grand
Haysville, KS 67060
Phone: 316‐554‐2210 • Fax 316‐554‐2212
B.J. Knudson
Executive Director of
Operations
Memo: TO: Haysville Board of Education
FR: B.J. Knudson, Executive Director of Operations
DA: February 26th, 2018
RE: 9 XMT 304 CC/CV Welders
We are asking for a resolution authorizing Haysville USD 261 to enter into contract with Air Gas to
provide the 9 XMT 304 CC/CV Welders for Campus High School automotive shop. The cost of the
welding equipment is $49,645.53.
Bid Results:
Air Gas $49,645.53
Lampton Welding Supply $51,282.00
Praxair No Bid
Matheson Linweld North No Bid
Max’s Breathe Easy Gases and Supplies No Bid
USD 261 Service Center1745 W. Grand
Haysville, KS 67060
Phone: 316‐554‐2210 • Fax 316‐554‐2212
B.J. Knudson
Executive Director of
Operations