U.S. General Services Administration
Presenter: Karen PooleOffice of Small Business UtilizationGeneral Services Administration
Presenter: Karen PooleOffice of Small Business UtilizationGeneral Services Administration
May 2012May 2012
Subcontracting and Electronic Subcontracting Reporting System (eSRS) for the Prime Contractor and the Contracting Officer
Subcontracting and Electronic Subcontracting Reporting System (eSRS) for the Prime Contractor and the Contracting Officer
2
“The basic building block of good team
building is for a leader to promote the
feeling that every human being is unique
and adds value.” ~Unknown
SUBCONTRACTING ASSISTANCE PROGRAM
Public Law 95-507
Amended Section 8(d) of the Small Business Act and created the foundation for the Subcontracting Assistance Program. It requires that all small businesses have the maximum practicable opportunity to participate in the performance of Federal agency contracts and subcontracts.
3
SUBCONTRACTING ASSISTANCE PROGRAM“Subcontracting is More than a Subcontracting Plan”
Federal Government awards billions of dollars in prime contracts for supplies and services to large or “other-than small” businesses.
Subcontracting Program is comprised of activities to ensure small businesses receive a fair and equitable opportunity to participate in requirements awarded by Federal agencies, including subcontracts resulting from award of prime contracts.
4
SUBCONTRACTING ASSISTANCE PROGRAM
5
Small Business concerns are: Small business (SB)Veteran-owned Small Business (VOSB)Service-disabled Veteran-owned Small Business
(SDVOSB)Historically Underutilized Business Zone Small
Businesses (HUBZ) Small Disadvantaged Businesses (SDB)Woman-owned Small Businesses (WOSB)
SUBCONTRACTING ASSISTANCE PROGRAM
FAR Subpart 19.7 – The Small Business
Subcontracting Program outlines:
Statutory requirements Eligibility requirements for participating in the program Subcontracting Plan Requirements Responsibilities of the contracting officer
6
SIZE STANDARDSFAR 19.102
Government-wide North American Industry Classification System Codes (NAICS)
Number of Employees
OR Annual Revenue/Sales
SBA Office of Size Standards
Phone: 202-205-6618, web site www.sba.gov/size or email [email protected]
7
8
WHEN A PROCUREMENT NEED IS DETERMINED
9
WHEN A PROCUREMENT NEED IS DETERMINED
Internal customer identifies procurement needs and discusses with the Contracting Officer.
Contracting Officer, Administrative Contracting Officer (ACO) or Program Manager conducts market research, with assistance of the Small Business Office as needed, to identify potential small business concerns who can perform the requirements.
If the procurement is not set-aside for small business, the CO must complete GSA Form 2689 “Small Business Analysis Record” and attach a written justification.
10
DETERMINING THE NEED FOR A SUBCONTRACTING PLAN
FAR 19.705-2
Determine prior to solicitation:
Could the prime contractor be other than small business?
Will the total contract value, including options, exceed $650,000 ($1,500,000 for construction)?
Are there possible subcontracting opportunities?
11
DETERMINING THE NEED FOR A SUBCONTRACTING PLAN
During solicitation preparation:
Include Subcontracting Plan requirement in the solicitation, if applicable
Include a subcontracting plan template in the solicitation (available from your local Small Business Technical Advisor)
Include Subcontracting Plan as an evaluation factor, if applicable Provide solicitation to Small Business Technical Advisor (SBTA) and
Procurement Center Representative (PCR) for review before issuing itSolicitation developed stipulates that the prime contractor must meet
designated subcontracting guidelines of FAR Part 19
12
SUBCONTRACTING PLANS ARE NOT REQUIRED IF:
FAR 19.702(b)
From small business concerns
For personal services contracts
For contracts performed entirely outside the United States
For previous contracts that do not contain clause 52.219-8
13
SUBCONTRACTING PLAN REQUIREMENTS
14
WHEN IS A SUBCONTRACTING PLAN REQUIRED TO BE SUBMITTED?
FAR 19.702
New contracts $650,000 or more ($1.5 million for construction). Include all options in determining contract value, whether exercised or not.
Annual Update (Commercial Plans)
Modifications that meet subcontracting threshold
15
TYPES OF SUBCONTRACTING PLANSFAR 19.701
Commercial Plan: (company-wide)
Individual Plan: (contract specific)
Master Plan (when goals/dollars need to be submitted at a later time)
16
COMMERCIAL PLAN FAR 19.701, FAR 19.704(d)
& FAR 12
Submitted and negotiated annually
Company fiscal year (12 month period)
Note: Leasing and construction do not offer commercial items
17
INDIVIDUAL PLANFAR 19.701 & FAR 19.704(c)
Covers the entire contract period (including options, with goals/dollars stated separately)
Specific to one contract Goals are based on the offeror’s planned subcontracting in support
of the specific contract, except that indirect costs incurred for common or joint purposes may be allocated on a prorated basis to the contract.
18
MASTER PLANFAR 19.701 & 19.704(b)
Contains all the required elements of an Individual Plan, except goals/dollars
Eventually evolves into an Individual Plan (when goals/dollars are added), provided the Master Plan has been approved Include other Agency Approval Document, if applicable
19
The Eleven Subcontracting Statutory Requirements FAR 19.704
Identification DataType of PlanGoalsProgram AdministratorEquitable OpportunityAssurances of Clause Inclusion and Flow DownReporting and CooperationRecordkeepingStatutory RequirementsDescription of Good Faith EffortSignature Required
20
CONTRACTOR IDENTIFICATION DATACOMMERCIAL PLAN
Company Name and AddressDate PreparedDescription of Products/Services:
general summary of commercial business to be covered by this plan for any government contract, awarded during the same fiscal year
Commercial Plan Period: (Insert dates of offeror’s Fiscal Year)Estimated annual sales
21
CONTRACTOR IDENTIFICATION DATAINDIVIDUAL PLAN
Company Name and AddressDate PreparedDescription of Product/Service covered by this specific contractPlace of Performance/DUNS Number (under contract awarded)Solicitation NumberContract Number (if available)Individual Plan/Contract Period (stated separately for base
and each option period)Base: Date Of Award – ?? Years; Option 1: ________; Option 2: ________; Option 3: ___________; Option 4: ___________ (N/A for MAS)
Estimated Contract Value $______ (separate estimates for base & each option)
22
FISCAL YEAR 2010 & 2011 GSA WIDE SUBCONTRACTING GOALS
Goaling Category Goal
Small Business 30Veteran-owned Small Business 3Service-Disabled Veteran-owned small business 3HUBZone Small Business 3Small Disadvantaged Business 5Women-owned Small Business 5
23
TOTAL DOLLARS AND PERCENTAGE GOALSFAR 19.704(a)(1) & (2)
Separate Goals (percentage) for:Small BusinessVeteran Owned Small Business (VOSB)Service-Disabled Veteran-Owned Small Business (SDVOSB)Women-Owned Small Business (WOSB)Historically Underutilized Business Zone (HUBZ) Small BusinessSmall Disadvantaged Business (SDB) including HBCU/MI, Hispanic Serving Institution,
Tribal Colleges and Universities, 8(a) companies, Alaska Native Corporations (ANC’s)
24
GOALSFAR 19.704(a)(2)
Subcontracting Amounts: Total Dollars planned to be subcontracted Total Dollars planned to be subcontracted to each business group
The dollar amounts planned for subcontracting to each of these categories must be expressed in the subcontracting plan as percentages of the total subcontracting dollars to both large and small businesses.
25
TOTAL DOLLARS AND PERCENTAGE GOALSINDIVIDUAL PLAN
Dollar figures below are only examples to show the actual GSA target percentage goals
BASE GOALS are expressed in dollars and percentages of total planned subcontracted dollars.
PLANNED SUBCONTRACTING TO: DOLLARS $ PERCENT %
1. Total Dollars to be Subcontracted (2 + 3 = 1) large and all small business must equal total amount to be subcontracted
$100,000,000 100%
2. Large Businesses (Other than Small) $ 70,000,000 70%
3. All Small Businesses $ 30,000,000 30%
4. Veteran-Owned Small Businesses (VOSB) $ 3,000,000 3%
5. Service-Disabled Veteran-Owned Small Businesses (SDVOSB)
$ 3,000,000 3%
6. HUBZone Small Businesses (HUBZone) $ 3,000,000 3%
7. Small Disadvantaged Businesses (SDB) $ 5,000,000 5%
8. Women-Owned Small Businesses (WOSB) $ 5,000,000 5%
26
TOTAL DOLLARS AND PERCENTAGE GOALS COMMERCIAL PLAN
1. Estimated TOTAL dollars planned to be subcontracted; i.e. to all types of business concerns:Annual Commercial Expenditures: $_12,000,000__________= 100% subcontracted 2. Planned subcontracting to large business concerns (those classified as other than small):Annual Commercial Expenditures: $__8,400,000__________ = _70_ % of TOTAL above3. Planned subcontracting to ALL small business concerns (including ANCs & Indian tribes, VOSB,
SDVOSB, HUBZone small, SDB (including ANCs & Indian tribes), and WOSB):Annual Commercial Expenditures: $__3,600,000__________ = _30_ % of TOTAL4. Planned subcontracting to veteran-owned small business concerns (which includes service-disabled veteran- owned small business):Annual Commercial Expenditures: $____360,000_________ = _3_ % of TOTAL5. Planned subcontracting to service-disabled veteran-owned small business concerns (also a subset of total VOSB and cannot be higher than VOSB above):Annual Commercial Expenditures: $_____360,000______ = _3_ % of TOTAL6. Planned subcontracting to HUBZone small business concerns:Annual Commercial Expenditures: $_____360,000____ = _3_ % of TOTAL7. Planned subcontracting to small disadvantaged business concerns (including ANCs & Indian tribes):Annual Commercial Expenditures: $______600,000_____ __= _5_ % of TOTAL8. Planned subcontracting to women-owned small business concerns:Annual Commercial Expenditures: $_____600,000_____ = _5_ % of TOTAL
27
DESCRIPTION OF SUPPLIES/SERVICES FAR 19.704(a)(3)
Supplies/Services Large Small VOSB SDVOSB HUBZone SDB WOSB
Janitorial X X X
Printing X
Transportation X X
Office Supplies X X
Graphics X
Temporary Services X X
Food Services X X
28
DESCRIPTION OF SUPPLIES/SERVICES
Supplies/Services Large Small VOSB SDVOSB HUBZone SDB WOSB
Lease Construction:
Excavation X X X
Drywall Installation X
Demolition X X
Lease Services:
Lock and Key X
Janitorial X X
Refuge Removal X X
29
DESCRIPTION OF METHOD USED TO DEVELOP SUBCONTRACTING GOALS
FAR 19.704(4)
Statement that contractor has reviewed his prior subcontracting efforts, or previous history on similar contracts.
30
DESCRIPTION OF METHOD USED TO IDENTIFY POTENTIAL SOURCES
FAR 19.704(5) & FAR 52.219(d)(5)
Examples:
Attended conferences and networking sessionsUsed existing suppliers Researched minority directoriesCentral Contractor Register (CCR) at: www.ccr.gov
GSA e-Library web site at: www.gsaelibrary.gov
31
INDIRECT COSTSFAR 19.704(a)(6)
Provide a statement as to whether or not the offeror included indirect costs in establishing subcontracting goals, and
Provide a description of the method used to determine the proportionate share of indirect costs to be incurred with all small business concerns.
32
EXAMPLES OF INDIRECT COSTSFAR 19.704(a)(6)
Landscaping Janitorial Printing Graphics Advertising Signage Business Cards Promotion Items Photography Telephone Education Training Travel Agency Office Supplies Office
Equipment Office Furniture Courier Service Security Service Temporary Service Consulting Audit services Food service Cleaning/Laundry Freight Office repairs Legal services Conference/Trade
shows Equipment rental
33
NAME OF PROGRAM ADMINISTRATOR AND DUTIES
FAR 19.704(a)(7) & 52.219-9(e)
Description of Possible Duties
Developing and promoting company policy that demonstrates the company’s support for awarding contracts to SB, VOSB, SDVOSB, HZSB, SDB, and WOSB, concerns.
Ensuring that subcontract procurements are structured to permit the maximum possible participation
Preparing and submitting ISR and SSR ReportsCoordinating the company’s activities during compliance reviews by Federal
agencies
34
EQUITABLE OPPORTUNITY FAR 19.704(a)(8)
Provide a description of the efforts the offeror will make to ensure that small business, have an equitable opportunity to compete for subcontracts.
Outreach events to locate sourcesInternal efforts to guide and encourage purchasing personnel to
subcontract with small business concerns
35
ASSURANCES THAT THE OFFEROR WILL INCLUDE CLAUSE FLOWDOWN
FAR 19.704(a)(9)
FAR Clause 52.219-8, Utilization of Small Business Concerns
FAR Clause 52.219-9, Small Business Subcontracting Plan
36
CONTINUED
THE OFFEROR WILL: FAR 19.704(a)(10)
(iii) Submit the Individual Subcontract Report (ISR), and the Summary Subcontract Report (SSR) using the Electronic Subcontracting Reporting System (eSRS) (http://www.esrs.gov), following the instructions in the eSRS;
(iv) Ensure that its subcontractors with subcontracting plans agree to submit the ISR and/or the SSR using the eSRS;
37
CONTINUED
THE OFFEROR WILL: FAR 19.704(a)(10)
(v) Provide its prime contract number and its DUNS number and the e-mail address of the Government or Contractor official responsible for acknowledging or rejecting the reports, to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their reports; and
38
CONTINUED
THE OFFEROR WILL: FAR 19.704(a)(10)
(vi) Require that each subcontractor with a subcontracting plan provide the prime contract number and its own DUNS number, and the e-mail address of the Government or Contractor official responsible for acknowledging or rejecting the reports, to its subcontractors with subcontracting plans.
39
RECORDKEEPINGFAR 19.704(a)(11) & 52.219-9(d)(11)
Description of the Types of Records
40
STATUTORY REQUIREMENTSFAR 19.702
Ensure indication of compliance with all:
Maximum practicable opportunity;
Timely payment;
Failing to comply in good faith;
Failure to make a good faith effort shall result in the imposition of liquidated damages
41
GOOD FAITH EFFORTFAR 19.705-5(a)(5) and U.S.C. 637(d)(4)(F)
Maximum practicable utilization of SB, SDB, HUBZone, WOSB, VOSB and SDVOSB concerns as subcontractors in Government contracts is a matter of national interest with both social and economic benefits. When a contractor fails to make a good faith effort to comply with a subcontracting plan, these objectives are not achieved, and the above regulations directs that liquidated damages shall be paid by the contractor.
42
ALL PLANS MUST BE SIGNED AND DATED BY A COMPANY OFFICIAL
Plans must be signed and dated by a company official who, at a minimum, is a higher level than the Plan Administrator. This ensures company “buy-in” of Plan contents and administration of those contents.
43
“Teamwork is the ability to work together toward a common vision. The ability to direct individual accomplishments toward organizational objectives. It is the fuel that allows common people to attain uncommon results.”
~Andrew Carnegie
44
CHECKLIST FOR REVIEW OF SUBCONTRACTING PLAN
Guides you through the plan to ensure that each of the eleven required elements have been included
Where the CO, Small Business Technical Advisor, and the Small Business Administration review/sign
Note: The checklist does not currently have a form number (formerly GSA Form 3584). Watch for
Acquisition Letters and GSAM Updates
45
EVALUATING THE SUBCONTRACTING PLAN
Subcontracting Plans & Goals Should:
Be realistic and achievable
Provide a challenge (and build upon prior achievements)
Include positive goals
Reflect best faith efforts & maximum practicable opportunities
46
EVALUATING THE SUBCONTRACTING PLAN
UPON RECEIPT OF A SUBCONTRACTING PLAN, CO MUST REVIEW TO ENSURE ADEQUACY AND THAT IT MEETS THE REQUIREMENTS OF FAR AND GSAM (SEE CLAUSE 52.219-9)
Ensure goals and dollar amounts are calculated correctlyFind that Small Business Concerns are included in all applicable categories (allowed to double & triple count $$)Require an Offeror to justify or explain why their proposed goals are lower than the agency goals or the government-wide goals. If you cannot negotiate higher goals due to a unique situation, the plan should state how this reflects their best faith effort and what their challenges reside.
47
CONTINUED
EVALUATING THE SUBCONTRACTING PLAN
Also consider past subcontracting history and goal attainment --overall compliance & efforts should be considered, not merely whether goals were met
Obtain SBTA review, advice & recommendationsObtain SBA’s Procurement Center Representative (PCR) review and
concurrenceEnsure the CO finds the Subcontracting Plan acceptable and
incorporates it into and makes it a material part of the contract.
48
SUBCONTRACTING PLAN IS A MATERIAL PART OF THE CONTRACT
Subcontracting Plans must be:
o Approved prior to awardo Made a material part of the contract at the time of award
Failure to submit an acceptable Subcontracting Plan to CO makes the offeror ineligible for award.
File APPROVED plan with Checklist (formerly called GSA Form 3584) under Tab 23(b)
49
DETERMINED THAT NO SUBCONTRACTING POSSIBILITIES EXIST?
FAR 19.705-2(c)
Must be approved at a level above the contracting officer and placed in the contract file.
50
DETERMINED THAT NO SUBCONTRACTING POSSIBILITIES EXIST?
GSAM 519.705-2(d)
51
GENERAL SERVICES ADMINISTRATIONDETERMINATION AND FINDINGS
(If a subcontracting plan do not exist, a sample D&F may include)
Example: Authority to Contract without a Subcontracting Plan
I hereby find the following:XxxxxxxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxxxxxx
Based on the above findings, I hereby determine:XxxxxxxxxxxxxxxxxxxxxxxxXxxxxxxxxxxxxxxxxxxxxxxx
Prepared by :_______________________ Approved by_____________________ Contracting Officer Division Director or
Office Title/Symbol Center Director
Concurrence:____________________________ Concurrence:__________________________
Insert Name of SBTA Insert Name of Associate Administrator
Small Business Technical Advisor Associate Administrator Office of Small Bus.
Utilization (E)
52
TRUE OR FALSE DO WE REQUEST A NEW INDIVIDUAL PLAN FOR
EACH OPTION PERIOD?
SubkPlan Subk
Plan
Subk Plan Subk Plan
53
TRUE OR FALSE
AN OFFEROR MUST USE THE MODEL SUBCONTRACTING PLAN?
54
TRUE OR FALSEIF A MODEL PLAN IS PROVIDED IN THE
SOLICITATION, THE BELOW STATEMENT SHOULD BE INCLUDED
Notice to Offerors: “GSA provides this model plan as a tool. You must adapt this model plan to fit your subcontracting situation. The plan is NOT a fill-in-the-blank form and you must remove instructional language. This model does not establish minimum requirements for an acceptable plan. The model reflects objectives GSA encourages contractors to adopt.” Plans may be created using the Model plan format or be the company’s own creation.
55
TRUE OR FALSE
GSA FORM 3584 CANNOT BE FOUND AMONG THE AVAILABLE ELECTRONIC FORMS?
56
TRUE OR FALSE
A NEW CHECKLIST MUST BE PREPARED TO TRANSMIT SUBK PLAN REVISIONS FOR REVIEW?
57
TRUE OR FALSE
CO’s MAY MAKE MINOR CHANGES TO THE CONTRACTORS SUBK PLAN AND SHOULD
REFER CONTRACTORS TO THE SMALL BUSINESS OFFICE FOR QUESTIONS?
58
TRUE OR FALSE
IF THE SBTA OR SBA’s PCR DO NOT AGREE WITH THE PLAN, AND RETURNS THE CHECKLIST
WITHOUT SIGNATURES, NOTHING CAN BE DONE?
Refer to FAR 19.705-4(c) & (d), and GSAM 519.705-5
59
LIQUIDATED DAMAGESFAR 19.702(c) and 19.705-7
Maximum practicable utilization of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors in Government contracts is a matter of national interest with both social and economic benefits. When a contractor fails to make a good faith effort to comply with a subcontracting plan, these objectives are not achieved, and 15 U.S.C. 637(d)(4)(F) directs that liquidated damages shall be paid by the contractor.
60
PAST PERFORMANCEFAR 42.15
WHY DO WE EVALUATE PAST PERFORMANCE?
To have relevant information for future source selectionpurposes regarding a contractor’s actions under previously awarded contracts.
Past performance evaluation shall include an assessment of contractor performance against, and efforts to achieve, the goals identified in the small business subcontracting plan when the contract includes the clause 52.219-9, Small Business Subcontracting Plan.
61
WHY DO WE EVALUATE PAST PERFORMANCE?
To have relevant information for future source selectionpurposes regarding a contractor’s actions under previously awarded contracts.
Past performance evaluation shall include an assessment of contractor performance against, and efforts to achieve, the goals identified in the small business subcontracting plan when the contract includes the clause 52.219-9, Small Business Subcontracting Plan.
62
SMALL BUSINESS JOBS ACT OF 2010
More accountability, integrity, and transparency for small businesses.
Enforces stronger subcontracting plan requirements for large prime contractors to ensure small businesses are utilized in subcontracting.
Discourages late payments to small subcontractors.
63
Subcontract Compliance and the Electronic Subcontracting Reporting
System (eSRS)
64
Monitoring Subcontracting Compliance
Monitoring Compliance After Award
Compliance in eSRS
Small Business Program Compliance Review (SBPCR)
Seven Elements of a SBPCR
65
Monitoring Compliance – After Award
Contracting Officer notify the Small Business Administration (SBA)
Send copy to SBA Area Director where contractor is located
Provide copy of Subcontracting Plan to SBA, Procurement Center Representative (PCR)
66
Monitoring Compliance – After Award
Provide copy of award notice to SBTA within five days of contract award or contract modification
Forward a copy of each plan or determination that no plan is required to the Administrative Contracting Officer (ACO)
Ensure all reports, including Individual Subcontract Report (ISR) and Summary Subcontract Report (SSR) are submitted on time is complete and accurate
Partner with SBA and SBTA to conduct Subcontracting Compliance Reviews
67
Monitoring Subcontracting Compliancewww.esrs.gov
SSR Status Report ISR First Tier Report Subcontracting Contractor Award Dollars Time-Phased Individual Subcontract Report 5 Year Contractor Trend Report Analysis of Subcontracting Plan Goal Attainment Subcontracting Achievements by Federal Agency ISR All Tiers Report ISR Status Report
68
Monitoring Subcontracting Compliance
High dollar Recovery Projects
Government-wide multiple award contracts
Projects not meeting subcontracting goals (ISRs)
Validate data in FPDS and eSRS, including delegated administrative roles
Periodically provide progress updates and notify procurement teams of reports to review
Clarify lower-tier reporting processes
69
Small Business ProgramCompliance Review (SBPCR)
Public Law 95-507, 13 CFR 125, and SBA/Standard Operating Procedures (SOP)
An on-site Small Business Program Compliance Review (SBPCR) is an objective and comprehensive formal evaluation of a Large Prime Contractor’s (LPC) compliance with it’s subcontracting plans.
70
SBPCR - continued
Preparation for a SBPCR is extremely important:• General background of the LPC’s history, size, major product line• Most recent ISR for agency contracts• Current year and historical summary subcontracting data for five
years• List of sources referred to LPC
A notification letter and preparation checklist should be issued to the LPC 30 days prior to on-site visit.Request the information be submitted two weeks in
advance
71
The Seven Elements of a SBPCR
Sourcing
Validation of the subcontracting report for ISRs and SSRs
Five year trend analysis
Overall evaluation of Small Business Program
Subcontracting plan goal analysis
Sampling of subcontracts issued to large business
Follow-up agency/SBA’s prior recommendations
72
SBPCR - continued
Conducted properly, a SBPCR review can have a significant impact on the way a LPC administers its small business program. Follow up is key!!!
73
Electronic Subcontracting
Reporting System (eSRS)
74
eSRS
What is eSRS?
Who is required to use eSRS?
How does eSRS work?
How can you register in eSRS?
75
Registering in eSRS:
Click on “Government” if you are a Federal employeeHave password ready (aaBB1234!@)
76
Registration
77
Registering in eSRS - continued
78
Registering in eSRS
79
Registering in eSRS - continued
80
Registering in eSRS - continued
81
Registering in eSRS - continued
82
Registering in eSRS - continued
83
Registration Complete
84
Accept/Reject ISRs and SSRs
85
Reporting Requirements
Individual Subcontract Report (ISR) (formerly SF 294)Semi-annually for: Oct 1 – March 31
April 1 – Sept 30 (Plus one SSR for year-end due Oct 30)
Summary Subcontract Report (SSR) (formerly SF 295)Annually Oct 1 – Sept 30 Year-End SDB Supplemental ReportoDue annually and at contract completion for ISRsoPer 48 CFR 52.219-9(j)(2)oReport (3-digit NAICS subsector)oOptional Form 312 (FAR Clause 52.219-25)
86
Selecting A Report
87
Defining Your Search
88
Accept/Reject ISR
89
Accept/Reject SSR
90
Acceptance/Rejection Note
91
SSR SDB Dollars
92
Accept/Reject Year-End SDB
93
SDB Participation Report Optional Form 312
94
REPORTS
Pre-defined Reports
5 Year Contractor Trend ReportAnalysis of Subcontracting Plan Goal AttainmentSubcontracting Achievements by Federal Agency
Ad Hoc Reports
Design report with more specific details
95
eSRS Resources
Central and Regional OSBU POCsQuick Reference GuidesSample Reports
96
GSA, Office of Small Business Utilization
Questions?
Thank you.