US 29 Mobility Reliability Study
Summary of US 29 Studies and Plans
US 29 Bus Rapid Transit (BRT) County and State Studies
1 US 29 Busway Feasibility Study MCDOT 1996
2 US 29 Bus Operations Analysis MDOT SHA 2001
3
Existing Conditions: Signal Systems and Operations on Corridors Rapid Transit System Transit Signal Priority Technical Memorandum 2 & Rapid Transit System Transit Signal Priority Findings and Recommendations Technical Memorandum 3
MCDOT 2013
4 US 29 Transit Reliability and Travel Time MCDOT 2015
5 US 29 Bus Rapid Transit Corridor Planning Study Preliminary Purpose and Need Document
MCDOT 2015
6 US 29 Managed Lane Feasibility Analysis SWA 2016
7 TIGER Grant Application MCDOT 2016
8 US 29 Bus Rapid Transit Corridor Planning Study - Corridor Study Report
MCDOT, MDOT MTA, MDOT SHA
2017
9 US 29 Bus Rapid Transit Corridor Planning Study/Preliminary Conceptual Alternatives & Traffic Operations Analysis Results
MCDOT, MDOT MTA, MDOT SHA
2017
10 US 29 Bus Rapid Transit Montgomery County Council T&E Committee Worksession
MCDOT 2017
US 29 Related BRT Studies
11 Better BRT Better BRT
Citizen Group 2016
12 US 29 BRT Dedicated Lanes Draft Concept Emerson/Smoot,
Better BRT 2016
US 29 Related Traffic and Transit Studies
13 US 29 Before/After Study From MD 198 to MD 193 MDOT SHA 2006
14 Pedestrian Roadway Safety Audit University Boulevard (MD 193) and Colesville Road (US 29)
MCDOT 2011
15 US 29/Cherry Hill Transit Oriented Development Scenario Planning Report
M-NCPPC 2011
16 US 29 Fairland/Musgrove Interchange Study MDOT SHA 2014
17 US 29 Bus Rapid Transit Regional Traffic Impact UMD 2016
2
18 US 29 Existing Conditions Report MCDOT 2017
19 US 29 Reversible Lane Removal Study MDOT SHA District 3
2018
Countywide and Regional Transit Studies
20 Countywide Bus Rapid Transit Study Consultant’s Report MCDOT 2011
21 Demand and Service Planning Report for the Proposed Montgomery County Maryland BRT System
MCDOT 2012
22 Montgomery County Rapid Transit System Service Planning and Integration Report
MCDOT 2014
23 County Executive's Transit Task Force Final Report and Recommendations
Montgomery County
2015
24 Z Line Study WMATA 2015
25 Howard County Bus Rapid Transit Phase II Study Technical Report
Howard County 2016
Related Regional Studies
26 MD 193 Road Diet Study MDOT SHA 2016
27 Maryland State Highway Mobility Report MDOT SHA 2016
28 Mobility Assessment Report M-NCPPC 2017
Functional and Master Plans
29 Montgomery County Master & Sector Plans (Fairland, Four Corners, North & West Silver Spring, Silver Spring Streetscape and White Oak)
M-NCPPC Varies
30 Purple Line Functional Plan M-NCPPC 2010
31 Burtonsville Crossroads Neighborhood Plan M-NCPPC 2012
32 Countywide Transit Corridors Functional Plan M-NCPPC 2013
33 White Oak Science Gateway Master Plan and Local Area Transportation Review (LATR) Intersection Improvement Cost Evaluation Study
M-NCPPC 2014
34 Silver Spring CBD Bicycle and Pedestrian Priority Area M-NCPPC 2015
35 Federal Research Center Master Plan Draft Environmental Impact Statement
GSA-USFDA 2018
36 Countywide Bike Master Plan MCDOT 2018
3
US 29 Bus Rapid Transit (BRT) County and State Studies
1. US 29 Busway Feasibility Study – MCDOT, January 1996
The study proposes a 3.4-mile busway along US 29 from Sligo Creek Parkway to north of Stewart Lane.
Recommended roadway improvements include the elimination of 30 left turns along the corridor,
mountable curbs for busway and emergency vehicle use, dedicated reversible lane in center of the road
with medians on either side. Expansion and closure of the median at Lorain Ave, Timberwood Avenue,
and Lanark Way is also recommended, as is a contraflow dedicated lane in the Four Corners section.
Signal phasing improvements are also recommended throughout the corridor, as well as two new signals
at Hastings Drive and Crestmoor Drive.
Recommendations for non-motorized improvements include crosswalks, pedestrian-actuated signal
heads, and median refuge areas at strategic locations throughout the corridor, and sidewalks for
pedestrians and bicycles on both sides of US 29 for the length of the busway.
2. US 29 Bus Operations Analysis – MDOT SHA, October 2001
The study addresses vehicular and bus travel times and delays along US 29 between the Burtonsville
Crossing Shopping Center and Silver Spring Metro Station, and predicts operations under year 2007
traffic conditions, when grade separations at the intersections of US 29 and MD 198, Briggs Chaney
Road and Randolph Road were to be built and operational. The study concludes that 2007 bus
operations are not expected to deteriorate, and rather expected to improve over the 2001 signalized
intersection conditions in light of proposed grade separations.
3. Existing Conditions: Signal Systems and Operations on Corridors Rapid Transit System Transit
Signal Priority Technical Memorandum 2 & RTS Transit Signal Priority Findings and
Recommendations Technical Memorandum 3 – MCDOT, 2013 and 2014
The primary goal of the study is to define the appropriate metrics for the implementation of TSP
systems on each RTS corridor, building on what was developed for TSP for local bus operations.
Technical Memorandum 2 describes the existing conditions of signal systems and traffic/transit
operations on the proposed RTS corridors within Montgomery County. Recommendations for the US 29
corridor include a mix of two-lane median busways, mixed traffic operations, dedicated curb lanes in the
peak hour direction and curb lanes via lane-repurposing.
Technical Memorandum 3 summarizes the current status of TSP and RTS within Montgomery County,
develops a preliminary concept of operations for key RTS operational scenarios, and estimates costs for
TSP components. Recommendations include testing for advanced TSP strategies and technologies
(phase rotation, phase omission, phase insertion, predictive priority, adaptive signals, etc.), developing
policies for synergistic priority strategies and developing a services hierarchy.
4
4. US 29 Transit Reliability and Travel Time – MCDOT, March 2015
The memorandum documents the US 29 corridor travel time and on time performance (OTP) analysis
carried out using Automatic Vehicle Location (AVL)/Automatic Passenger Counter (APC) data provided
by WMATA and Ride On for a period from October 3 to October 7, 2016. It was determined that BRT
would provide an end to end travel time savings of around 26% from Burtonsville to Silver Spring, but
this savings varies between specific Origin/Destination pairs depending on the directness of the current
service, location, and other factors. A savings as high as 60% could occur between Burtonsville and
White Oak, and a savings of only 0% to 2% from Four Corners to the Silver Spring Transit Center. BRT
may also improve reliability over current bus service.
5. US 29 Bus Rapid Transit Corridor Planning Study Preliminary Purpose and Need Document –
MCDOT, December 2015
This document identifies existing and future transportation needs in the US 29 corridor study that BRT
would address, and provides an initial foundation for a NEPA Purpose and Need statement in the event
the project moves into a future development phase. Based on the problems and issues identified, four
specific needs for the US 29 corridor and study area are discussed: transit demand and attractiveness,
mobility, system connectivity, and livability. The preliminary purpose statement includes five goals to
guide development of BRT alternatives: to improve the quality of transit service, to improve
mobility opportunities and choices, to develop transit services that enhance quality of life, and to
develop transit services that support master planned development.
6. US 29 Managed Lane Feasibility Analysis – Sabra Wang, January 2016
The analysis assesses the feasibility of converting vehicle travel lanes along US 29 to a managed lane to
serve the proposed BRT system, HOV-compliant vehicles, and right turns based on resulting traffic
impacts. The study concludes that redistributing traffic volumes based on the managed lane scenario
would result in uneven lane utilization which causes some lanes within each segment to perform at or
above capacity even after considering potential shifts from SOV to HOV. Therefore, a managed lane is
only recommended in the southern (Silver Spring to Sligo) and northern (MD 193 to MD 650) segments
of the corridor.
7. TIGER Grant Application – MCDOT , April 2016
The TIGER Grant Application seeks to secure funds for a 14-mile BRT service along US 29 from
Burtonsville Park and Ride to Silver Spring Transit Center. The BRT line would use the existing roadway
pavement where possible, and would include managed lanes, Bus on Shoulder, and a small segment of
mixed traffic.
8. US 29 Bus Rapid Transit Corridor Planning Study - Corridor Study Report – MCDOT, MDOT MTA,
MDOT SHA, April 2017
The report documents the evaluation of alternatives to provide new BRT service along US 29.
Alternatives evaluated include the No -Build and the three conceptual alternatives identified in the US
5
29 Bus Rapid Transit Corridor Planning Study - Preliminary Conceptual Alternatives & Traffic Operations
Analysis Results. Among other items, it compares the alternatives in light of ridership, accessibility to
jobs and activity centers, Level of Service during peak hours, and construction costs. It also documents
potential impacts to properties, historic resources, natural resources, and minority and low-income
populations. It is anticipated that these communities will benefit directly from the new transit
service provided.
9. US 29 Bus Rapid Transit Corridor Planning Study/Preliminary Conceptual Alternatives & Traffic
Operations Analysis Results – MCDOT, MDOT MTA, MDOT SHA, April 2017
The report documents traffic modeling assumptions and analysis results performed in support of the US
29 BRT Corridor Planning Study, which evaluates alternatives to provide new BRT services along US 29.
The traffic operations analysis portion of this study includes the traffic modeling and analysis findings for
the 2040 No-Build, Alternative A: Peak Direction Curbside BAT Lanes (South)/Dedicated Median
Shoulder BRT Lanes (North); Alternative B: Curbside Managed Lanes (South)/Bus-on-Outside-Shoulder
(North), and Alternative B Modified: Curbside Managed Lanes (South)/Dedicated Median Shoulder BRT
Lanes (North).
The study concludes that Alternative B Modified provides the highest level of transit service (i.e., fastest
and moves the most amount of people) but significantly degrades Single Occupancy Vehicle (SOV)
service. Alternative B seems to be relatively mid-range for improvement to level of transit service
without as much of an impact on SOV service. Recommended refinements for future study include signal
timing and TSP enhancements, alternative BRT alignments, modification to the lane repurposing
segments, geometric improvements to increase capacity at constrained locations, enhanced
Transportation Demand Management to reduce SOV demand, and improvements to traffic flow through
the BRT transition areas.
10. US 29 Bus Rapid Transit Montgomery County Council T&E Committee Worksession – MCDOT, May
2017
Topics discussed during the worksession included BRT funding, ideas for a public involvement plan, and
MetroExtra vs. BRT. It was discussed that funds are programmed to meet the $10M TIGER grant
requirements. Public involvement activities discussed include: establishing corridor advisory
committees; public open houses and virtual open houses; community meetings and outreach to schools,
civic groups, large residential communities, religious institutions, etc.; employee/employer focus groups;
written communications such as newsletters and social media; pop-up events, community events, and
festivals; and advertising at bus shelters and parking garages. MCDOT expressed opposition to short-
term MetroExtra implementation over BRT and supports development of operational and infrastructure
ideas to improve performance of the US 29 corridor.
US 29 Related BRT Studies
11. Better BRT, 2018
6
This citizen group calls for implementing a fast, safe, and reliable BRT system on Route 29. Better BRT
envisions extending dedicated bus lanes from Burtonsville to Sligo Creek Parkway so that buses don't sit
in heavy traffic during rush hour. Better BRT would provide an alternative to driving while also
minimizing impacts to drivers and adjacent property owners. Unlike previous designs proposed by the
county and state, Better BRT would create dedicated lanes with minimal road widening while also
retaining six lanes for cars through the Route 29 corridor. Better BRT would also enhance safety along
the corridor for drivers, bus riders, and pedestrians by eliminating some left turns along US 29, and
adding crosswalks and new traffic signals at key intersections.
12. US 29 BRT Dedicated Lanes Draft Concept – Emerson/Smoot, 2016
As part of the Better BRT plan, this concept proposes upgrades to the current BRT plan along most of US
29 corridor. Improvements include reducing travel lanes by one foot in areas with turn lanes, two
dedicated lanes next to the median where feasible, and reversible lanes where constrained south of
Granville Drive and south of Sligo Creek Parkway.
US 29 Related Traffic and Transit Studies
13. US 29 Before/After Study From MD 198 to MD 193 – MDOT SHA, 2006
The study evaluates weekday peak period traffic operations and overall transportation system impacts
in lieu of highway improvements on US 29 between Sandy Spring Road and University Boulevard. Year
2000 is the before condition and Year 2006 is the after condition. The study conducts a total build-out
analysis of US 29 with proposed interchanges at Greencastle Road, Fairland/Musgrove Road, Tech Road,
and Stewart Lane. It also develops year 2015 traffic forecasts for US 29 and conceptual lane
arrangements from the preferred alternatives at Briggs Chaney Road intersection (completed 2008).
14. Pedestrian Roadway Safety Audit University Boulevard (MD 193) and Colesville Road (US 29) –
MCDOT, July 2011
This document summarizes the results of a pedestrian road safety audit for the intersection of US 29
and MD 193 in Silver Spring, MD (Four Corners). The document identifies a variety of issues related to
pedestrian and bicycle safety and develops general suggestions to improve pedestrian and bicycle safety
in the study area including signage and signal improvements, deterrents to mid-block crossings, and
coordination with transit services to improve bus stop waiting areas.
15. US 29/Cherry Hill Transit Oriented Development Scenario Planning Report - M-NCPPC , June 2011
The report examines the results of a Transit-Oriented Development (TOD) scenario planning
exercise in a study area primarily located in the Cherry Hill Employment Area, east of US 29 south of
Cherry Hill Road. The planning exercise includes three main components: 1) a literature review
examining TOD best practices, particularly in relation to the large USFDA Federal Research Center
campus; 2) a transit sketch-planning analysis; and 3) a land-use scenario testing analysis. The report
concludes that the study area is a good candidate for increased bus service and potentially light rail
transit (LRT) or BRT in the future with some higher-density development around station areas.
7
16. US 29 Fairland/Musgrove Interchange Study – MDOT SHA, 2014
MDOT SHA evaluated the geometric, environmental, cost and traffic operations of a new interchange.
Recommendations include grade separation at the intersections of US 29 at Fairland Road and Musgrove
Road and construction of a service road starting at Musgrove Road and merging with US 29 prior to Tech
Road.
17. US 29 Bus Rapid Transit Regional Traffic Impact – UMD, 2016
The study team uses advanced traffic modeling applications with predictive routing capabilities to
evaluate the potential impacts of traffic diversions post-BRT implementation due to potential increased
traffic congestion along US 29. The study concludes that during the PM Peak period, implementation of
BRT results in an average speed change from 36 to 35 miles per hour, average vehicle miles traveled
from 7.2 to 7.4, and average travel time per trip change from 13.3 minutes to 13.5 minutes over 2015
No-Build conditions.
18. US 29 Existing Conditions Report – MCDOT, August 2017
The report reviews and summarizes recent studies and plans for Ride On and Metrobus service on, to
and near the US 29 corridor. It examines the Ride On and Metrobus routes that intersect and operate on
the US 29 corridor. The report will be used to inform design of a feeder bus network that will
comprehensively and efficiently serve the communities surrounding the corridor.
The study also identifies service gaps and recommends all-day service for the White Oak Shopping
Center along Stewart Lane and Lockwood Drive, Calverton and Downtown Silver Spring. It also
recommends additional peak hour service for Downtown Silver Spring and Forest Glen.
19. US 29 Reversible Lane Removal Study – MDOT SHA District 3
This study reviews the traffic and safety effects of removing the reversible lane along US 29. Due to
funding issues, it is currently on hold and has not been completed.
Countywide and Regional Transit Studies
20. Countywide Bus Rapid Transit Study Consultant’s Report – MCDOT, July 2011
This study analyzes the feasibility of a BRT network in Montgomery County via an initial screening to
identify eligible county roads and potential design options within the right-of-way, and to determine
travel demand along identified corridors as well as capital and operating costs for the network. A 13.5-
mile potential route is identified along US 29 from Burtonsville Park-and-Ride at its northern terminus
and the future Silver Spring Transit Center at its southern terminus, and includes 11 station locations
along the route. The plan uses density thresholds as a method to identify where BRT may be
appropriate, and makes general land use recommendations key to the success of BRT, including Transit-
Oriented Development.
8
21. Demand and Service Planning Report for the Proposed Montgomery County Maryland BRT
System – MCDOT, 2012
Of the 160 miles of BRT infrastructure on surface roads previously identified, this study recommends a
phased approach to realistically building and operating a full BRT network in Montgomery County. The
study estimates present passenger demands on the bus system based on operational data to evaluate
potential initial ridership of the first three selected BRT corridors.
22. Montgomery County Rapid Transit System Service Planning and Integration Report – MCDOT, May
2014
The report builds upon the body of knowledge that has been developed for a BRT network in
Montgomery County and provides guidance for further Rapid Transit System (RTS) planning among the
key BRT corridors: Randolph Road, MD 355, Georgia Avenue, Veirs Mill Road, New Hampshire Avenue,
and US 29. The study also examines integration of planned BRT and local bus service, as well as a
summary of regional land use plans. The concept for US 29 focuses on connecting activity centers,
multimodal transit nodes, as well as providing transportation opportunities from Burtonsville to Silver
Spring. Local service modifications include use of the US 29 BRT infrastructure, where accessible, by
Metrobus Z routes, MTA Commuter buses, and Ride On. Metrobus Route Z8 would continue with half
the headways of service.
23. County Executive's Transit Task Force Final Report and Recommendations – Montgomery County,
October 2015
The Transit Task Force reconvened in April 2015 to study legislation proposed in the 2015 Session of the
Maryland General Assembly, develop procedures for soliciting community and business input, provide
advice on the proposed legislation, and identify potential funding sources relating to the RTS network as
part of an overall financial plan. The Task Force proposes an additional half cent sales tax to fund transit,
and supports legislation to empower the County to develop its transit authority. Recommendations in
the report include: establishing special tax districts; introducing a new excise tax on commercial
property rentals to finance the transit system; creating a dedicated fund for transit; requiring the transit
authority to submit annual and long-term budgets and financial audits; requiring council approval for
eminent domain and ensuring the transit authority adheres to county ethics; and allowing the transit
authority to enter into multi-jurisdiction agreements.
24. Z Line Study – WMATA, January 2015
WMATA, with input from Montgomery County, completed a study for seven Metrobus routes that
provide connections along the US 29 corridor: Z2 Colesville-Ashton Line, Z6 Calverton-Westfarm Line, Z8
Fairland Line, Z9/Z29 Laurel-Burtonsville Express Line and Z11/Z13 Greencastle-Briggs Chaney Express
Line. Developed through public outreach and technical analysis, a summary of plan recommendations
follows.
9
Z Line service improvements are proposed for short-term (1-2 years) implementation, and include
adding trips to Z8 weekday mid-day service, adding trips to Z8 Saturday service, adding an additional Z6
weekday evening trip, and adjusting schedules to reflect observed run times. Mid-term (3-4 years)
recommendations include implementing Z6 Saturday service and modifying Z8 frequency, and
implementing new peak MetroExtra service. Long-term (5-6 years) recommendations include expanding
some Z Line mid-day and Saturday service areas.
Operational improvements include implementing dedicated supervision to proactively manage bus
departures and adding additional stops on Z Lines Express Services (Z9, Z11, Z13, and Z29). Proposed
passenger facility improvements include a number of ADA compliance and pedestrian safety
improvements; the addition of amenities such as shelters, benches and trash receptacles; signal timing
and phasing; stop locations; and addressing general congestion along US 29.
25. Howard County Bus Rapid Transit Phase II Study Technical Report – Howard County, April 2016
This report documents Howard County BRT Phase II Study efforts, analysis, and results. The study
focuses on US 29, Broken Land Parkway and US 1. The study examines specific route alignment and
stations, ancillary feeder transit services, landside services such as park and ride and pedestrian
accessibility, preliminary operating costs, and land use plans to support high quality transit service
within and between the study corridors.
Based upon the recommended BRT system for US 29 and related local/feeder bus service, the study
documents a significant travel market and demand for high quality BRT to and from Howard County for
each of the three corridors. Among other items, recommended next steps include coordination with
Montgomery County on US 29 corridor planning and preliminary engineering.
Related Regional Studies
26. MD 193 Road Diet Study – MDOT SHA, March 2016
MDOT SHA performed a roadway study along the MD 193 (University Boulevard) corridor from US 29
(Columbia Pike) to MD 320 (Piney Branch Road) per request by area elected officials and residents. The
purpose of the study was to determine if a reduction of the road capacity from 6 lanes to 4 lanes is
feasible. The study concluded that if a road diet is implemented, peak hour volume increases 2.5% and
6.5% north and south of I-495, respectively.
27. Maryland State Highway Mobility Report – MDOT SHA, 2016
The report documents the annual measurements of congestion along Maryland state highways including
travel time reliability. US 29 from MD 650 to I-495 was ranked as one of the top 10 congested arterial
segments in the State.
28. Mobility Assessment Report – M-NCPPC, February 2017
The report summarizes the trends, data, and analysis used to track and measure transportation mobility
conditions in Montgomery County to provide information to residents and public officials regarding the
10
current state of the county’s transportation system, as well as how the system is changing and evolving.
Although there are no specific recommendations, the report documents recent ridership and travel
trends.
Approximately 40 percent of residents from Silver Spring, Friendship Heights and Grosvenor commute
via public transportation. Ride On routes on US 29 saw an increase of 10 percent or more ridership from
2013 to 2015. MetroBus routes Z9/Z29 saw a 6.1 percent increase in ridership, while Metro Bus routes
Z11 and Z13 on US 29 saw a weekday average decrease in ridership of -26.4 percent.
Forty percent of roadway mileage inside the Beltway experiences moderate to heavy or higher levels of
congestion compared to approximately 13 percent outside beltway. Columbia Pike experiences two
peak periods between University Blvd and Sandy Spring Rd in the southbound AM peak south of
Randolph/ Cherry Hill Road and in the northbound PM peak between New Hampshire Avenue and
Randolph/ Cherry Hill Road. Columbia Pike from Sandy Spring Rd to Howard County border has a sharp
peak in congestion during the evening commute from 4 to 5 PM northbound and generally on Thursdays
and Fridays. Colesville Road from I-495 to DC border is 87 percent congested throughout the evening
commute in the southbound direction. In the northbound direction, both morning and evening
commutes reach similar congestion levels.
The county has invested in many capital construction projects, regulatory changes, planning methods
and data that seek to encourage a diverse transportation system. These include Bicycle Pedestrian
Priority Areas (BiPPA), and currently five locations are being evaluated for BiPPA in Montgomery County.
The Planning Department is preparing the Bicycle Master Plan and several capital improvement projects
supporting bicycle and pedestrian travel. In the top twenty intersections with the highest pedestrian
use, Colesville Road at Georgia Avenue and Fenton Street are #5 and #14, respectively. In the top twenty
intersections that bicycle activities were observed, Colesville Road at Georgia Avenue was #13 with 54
bicyclists. However, there is very little activity along US 29 outside of the Silver Spring CBD.
Functional and Master Planning Documents
29. Montgomery County Master & Sector Plans (Fairland, Four Corners, North and West Silver Spring,
Silver Spring Streetscape and White Oak,) – M-NCPPC, Various Dates
Fairland Master Plan, 1997
The plan reinforces existing development patterns with adjustments from the 1993 General Plan.
Specific to transportation, the plan recommends enhancing mobility by providing safe and efficient
transportation systems with a wide range of alternatives.
The plan does not make specific transit recommendations, however it does recommend grade-
separated interchanges for all east-west crossings of US 29, and recommends reserving the ROW for all
future transit improvements. It endorses sidewalks and walkways to improve pedestrian access to public
transit, commercial centers, schools, parks and places of employment. The plan also supports safe and
convenient bikeway network that connects to local community centers, services and recreational
facilities and expands commuting opportunities for biking.
11
Four Corners Master Plan, 1996
The plan balances transportation needs of regional through traffic and local traffic by recommending
road improvements at main intersections and enhanced system for cyclists and pedestrians to create a
more conducive multi-modal environment.
The plan encourages increased use of transit with bus service that connects Four Corners with Silver
Spring and Forest Glen Metro Stations. It also recommends intersection improvements for Colesville
Road and University Boulevard, including pedestrian and streetscape amenities. It promotes use of
transit ridesharing and other traffic mitigation measures, including compressed workweeks and
telecommuting among employees and residents in and near the US 29 corridor. It suggests pedestrian
circulation and safety should be improved by constructing sidewalks that connect neighborhoods to the
commercial district, schools, transit stops, parks and other community facilities. It states that the
existing bikeway network should also be expanded to support local and regional systems and enhance
value as an alternate means of transportation.
North and West Silver Spring Master Plan, 2000
The plan seeks to enhance stable residential neighborhoods, upgrade local commercial centers and
generally improve connectivity. The plan's recommendations are designed to enhance and sustain area
neighborhoods with upgraded infrastructure and a neighborhood friendly transportation system.
The plan generally calls for improved transit on US 29, and for the investigation of the feasibility of a
transit center in White Oak Shopping Center. The plan suggests adding a separate right-turn lane on
westbound Dale Drive at Colesville Road, which would require pavement widening, and it also calls for
pedestrian circulation along Colesville Road including wide, tree-lined sidewalks on both sides of the
street and safe pedestrian crossings.
Silver Spring Streetscape Plan, 1992
This plan describes an overall concept for the Silver Spring Central Business District steetscape system
including street trees, lighting, paving, layout concepts and materials.
White Oak Master Plan, 1997
In addition to recommendations for residential communities and commercial centers, the plan
recommends safe and attractive transportation improvements that enhance local circulation and
convenience for all modes of travel within and through the communities of the White Oak Master Plan
area. The plan proposes two transit centers, one in Colesville and another in White Oak. It proposes
grade separated intersections along US 29. The plan also proposes a system of walkways and bikeways,
and sidewalk improvements to enhance pedestrian and bicycle experience and improve community
character.
30. Purple Line Functional Plan – M-NCPPC, September 2010
The plan identifies the Purple Line alignment and station locations throughout Montgomery County. No
specific roadway or automobile improvements are recommended for US 29, however two stations on or
12
near the US 29 corridor include the Fenton Street Station with platforms located adjacent to the Silver
Spring Library, and the Silver Spring Transit Center Station, which is also a stop on the US 29 BRT. The
Silver Spring Transit Center Station also includes enhanced access from the Purple Line to Metrorail Red
Line, local buses, MARC, inter-city bus and taxi service at Transit Center.
31. Burtonsville Crossroads Neighborhood Plan – M-NCPPC, December 2012
The plan is an amendment to the 1997 Fairland Master Plan and other regional plans which include the
Burtonsville crossroads area. The Burtonsville Park and Ride is presented as an opportunity to link local
businesses to the larger region, including access to US 29 and the planned Montgomery County BRT
network (the Park and Ride is the planned northern terminus of the US 29 BRT route). The Park and Ride
lot, located behind the Burtonsville Crossing Shopping Center, includes 500 spaces with access from US
29, Business 29 (Old Columbia Pike), and MD 198. It is served by MTA Commuter Bus, University of
Maryland Shuttle, and ICC Bus to and from Baltimore-Washington International Airport, and Metrobus,
including routes to Silver Spring, Amtrak and Metrorail stations. The plan calls for a shift from single-use
to mixed-used zoning in the area around the Park and Ride, which would provide a mix of commercial
and housing opportunities, support infill, and require privately owned public use space to be accessible
to the public. It also recommends improving the grid pattern of local streets, adding streetscape to
Business 29, and improving the bikeway along US 29.
32. Countywide Transit Corridors Functional Plan – M-NCPPC, December 2013
The plan recommends implementing a 102-mile Bus Rapid Transit (BRT) network and expanding right-of-
way for CSX Metropolitan Branch to allow for enhanced MARC commuter rail service. The plan calls for
dedicated bus lanes from Stewart Lane to Sligo Creek Parkway and from Georgia Avenue to Sixteenth
Street, two additional dedicated lanes from MD 198 to Stewart Lane, and a dedicated lane in the peak-
hour peak direction from Sligo Creek Parkway to Georgia Avenue. Station locations are identified at 11
locations throughout the corridor including the Burtonsville and Briggs Chaney park and rides, and
White Oak and Silver Spring transit centers.
Roadway and traffic signal improvements are not specifically recommended in the plan. However,
accommodation for pedestrians and bicyclists is recommended, particularly at transit-oriented
development areas, established or developing activity centers, around Metro stations, and at transfer
points between BRT routes.
33. White Oak Science Gateway Master Plan and Local Area Transportation Review (LATR)
Intersection Improvement Cost Evaluation Study - M-NCPPC, 2014
The master plan is an amendment to several Master Plans in Montgomery County covering
approximately 3,000 acres and makes recommendations for land use, density, zoning, transportation,
environment, historic resources, parks and community facilities. The plan envisions White Oak’s major
centers – Hillandale, White Oak, and Life Sciences/FDA Village evolving from conventional, auto-
dependent suburban shopping centers, business parks, and light industrial areas into vibrant, mixed-use,
transit-served nodes.
13
The purpose of the LATR Study is to address potential LATR-scale costs for inclusion in a proposed per-
trip fee that may be paid by new development in lieu of performing a complete LATR analysis and
independently mitigating individual development's traffic impacts. The study concludes that for all study
intersections on US 29, with the exception of Randolph Road/Cherry Hill Road, a proposed per-trip fee
may be established by County Council and paid by new development in lieu of conducting a
complete LATR analysis and independently mitigating individual development’s traffic impacts.
34. Silver Spring CBD Bicycle and Pedestrian Priority Area – M-NCPPC, June 2015
This document proposes a Bicycle and Pedestrian Priority Area (BiPPA) for the Silver Spring Central
Business District. The objective of the BiPPA is to enhance safe bicycle and pedestrian access to support
cohesive neighborhoods, aging infrastructure, and improve long-range connectivity and circulation.
35. Federal Research Center Master Plan Draft Environmental Impact Statement – GSA-USFDA,
February 2018
This document evaluates a new Master Plan for the 130-acre Federal Research Center to accommodate
a projected employee population of 18,000. The proposed action includes: development up to an
additional 1,191, 309 gsf of office space and 557,525 gsf of special/shared use space to support FDA’s
mission for a total of up to 8,977,671 gsf; 11,709 parking spaces for FDA employees and support staff;
1,615 visitor parking spaces; and reconfiguration of the East Loop Road. The document evaluates
installation of traffic adaptive/demand responsive signal systems on US 29, MD 650, and Cherry Hill Rd,
changing the AM and PM peak periods cycle length to 150 seconds, and proposes grade separated
interchanges at US 29 and Stewart Lane, Tech Road, and Musgrove Road. The EIS also calls for a transit
hub near the Federal Research Center, and coordination with Montgomery County and SHA to enhance
pedestrian and bicycle connections to and networks.
36. Countywide Bike Master Plan – MCDOT, May 2018
The Bicycle Master Plan sets forth a vision for Montgomery County as a world-class bicycling
community, where people in all areas of the county have access to a comfortable, safe, and connected
bicycle network, and where bicycling is a viable transportation option that improves the quality of life.
A number of new bikeways are recommended in the study area including a separated bikeway from
Northwest Branch to Lorain Ave and from University Blvd to the I-495 bridge on the east side of US 29 as
part of the Burtonsville to Silver Spring Breezeway. A separated bikeway is also recommended from
Sandy Spring Road (MD 198) to Blackburn Road on the east side and from Tech Road to Rachel Carson
Greenway on the west side of US 29.