Transcript

Figure 10-120

Residual Visual Impact During Construction and Operation

– Ha Che (S)

Visual Envelope

Location of Visually Sensitive Receiver (VSR) and direction of main views

VSR

500M Study Area

Work Limit Boundary

North

1:5000

VSR7

VSR6

VSR4VSR5

VSR3

VSR1

VSR2

VSR9

VSR8

HC-VSR1Construction OperationSlight / Moderate

Insubstantial / Slight

Slight Slight Beneficial (day 1)Slight Beneficial (year 10)

UnmitigatedMitigated

HC-VSR2Construction OperationSlight InsubstantialInsubstantial Insubstantial (day 1)

Insubstantial (year 10)

UnmitigatedMitigated

HC-VSR3Construction OperationModerate ModerateSlight / Moderate

Slight (day 1)Slight Beneficial (year 10)

UnmitigatedMitigated

HC-VSR5Construction OperationSubstantial Moderate / SubstantialModerate / Substantial

Slight / Moderate (day 1)Slight Beneficial (year 10)

UnmitigatedMitigated

HC-VSR6Construction OperationModerate / Substantial

Moderate

Moderate Slight / Moderate (day 1)Slight / Insubstantial (year 10)

UnmitigatedMitigated

HC-VSR4Construction OperationSubstantial Moderate / SubstantialModerate / Substantial

Slight / Moderate (day 1)Slight Beneficial (year 10)

UnmitigatedMitigated

HC-VSR7Construction OperationSubstantial ModerateModerate Slight (day 1)

Slight / Insubstantial(year 10)

UnmitigatedMitigated

HC-VSR8Construction OperationSubstantial ModerateModerate Slight / Moderate (day 1)

Slight / Insubstantial (year 10)

UnmitigatedMitigated

HC-VSR9Construction OperationSlight InsubstantialSlight Insubstantial (day 1)

Insubstantial (year 10)

UnmitigatedMitigated

A3 Jan 2016 Jan 2016 Jan 2016 Jan 2016

Copyright – The Government of the Hong Kong SARMap reproduced by Permission of the Director of Land

MOKM2504