1
UNCLASSIFIED
UNCLASSIFIED
UJTL to JCA Mapping Updateto WJTCS 09-2
24-28 August 2009
Joint Staff J-7, JFDIDSteve Brown
UNCLASSIFIED
2
UNCLASSIFIED
JCA WG Agenda
Time Topic/Subject Briefer
1300 – 1310 Welcome Remarks LtCol Larry Miller
1310 – 1330 JCA Status Update Brief LtCol Larry Miller
Mr. Steve Brown
1330 – 1420 UJTL / JCA Mapping, Staffing &
JCAMS Staffing Tool Mr. Steve Brown
1430 – 1530 UJTL / JCA Mapping & Readiness Mr. Steve Brown
1530 – 1600 Questions LtCol Larry Miller
Mr. Steve Brown
UNCLASSIFIED
3
UNCLASSIFIED
What Problem Does JCAs Address?
• DOD processes previously talked in five different languages (some still do)…
– Policy talked in terms of strategic priorities
– Programming talked in terms of appropriations and PEs
– Planning talked in terms of force packages
– Acquisition talked in terms of cost, schedule and performance parameters
– Requirements talked in terms of capabilities and gaps
• You cannot have an enterprise-wide capabilities-based strategy-to-task discussion without a common language
DoD’s Capabilities-Based Planning “Rosetta Stone”
UNCLASSIFIED
4
UNCLASSIFIED
UJTL to JCA Mapping Role in Strategy-to-Task
Building PartnershipsShape
Partner w/ Gov & Inst
CooperativeSecurity
Strengthen USSecurity Posture
in Region
US Legitimacy is Improved in Region
OP 4.7 2 Conduct Civil Military Operations (CMO) in the JOA
OP 4.7 5 Conduct Civil Military Operations (CMO) in the JOA
Units / Platforms Units / Platforms
OP 3.2.1 Provide Close Air Spt Integ for Surface Forces
OP 3.2.6 Provide Firepower in Support of Opnl Maneuver
OP 3.2 Attack Opnl Targets
Non-KineticMeans
KineticMeans
NTA 3.2.8 Conduct Fire SptART 3.3.1.1 Conduct
Surface-to-surface Atk
MCTL 3.4.1.4 CoordNaval Surface Fire Spt
AFT 4.2.1.2 Conduct Close Air SptNTA 3.2.8 Conduct Fire SptART 3.3.1.2.2 EmployClose Air SptMCTL 3.2.2 Employ Close Air Spt
UJTL Tasks
JCA Tiers 1 - 3
Engagement
AV-8B
F/A-18 Sqdn
A-10 Sqdn
F-16 Sqdn
B-52 SqdnMCTL 3.2 Conduct Indirect Fires
DDG-51
155mm SP Bn
GMLRS Unitary155mm SP Bn
120 mm Mtr Plt
Units / PlatformsUnits / Platforms Programs
F/A-22 Sqdn
F-35 SqdnF-35 SqdnExcaliber
5"/62 Gun/ERGM
Programs
Capability to Task Linkage
Service Tasks
Maneuver
ForceApplication
Fixed Target
Stationary Target
Moving Target
ST 3.2 Attack Theater
Strat Targets
JCA Tier 4and below
UNCLASSIFIED
6
UNCLASSIFIED
Mapping Realities
• We recognize that the UJTL and the JCAs were initiated and composed at different times for very different reasons. To further complicate matters, the reason for writing tasks has not remained constant or consistent.
• We also recognize that for that very reason, the mapping will result in a list of tasks that won’t map cleanly to just one capability or capability area. We can deal with that if the mapping stays within a single tier 1 – not ideal, still many issues.
• The main problem encountered during the mapping comes from what we have called “too broadly written” tasks, which have elements from several different tier 1s.
UNCLASSIFIED
7
UNCLASSIFIED
UJTL to JCA Re-mapping
UNCLASSIFIED
8
UNCLASSIFIED
UJTL to JCA Mapping
UNCLASSIFIED
9
UNCLASSIFIED
Deployment & Maneuver
UNCLASSIFIED
10
UNCLASSIFIED
# JCAs EV Actual
FS 45 99 118BA 70 154 141FA 122 268 106Log 82 180 124C2 76 167 234NC 50 110 87
Prot 44 97 30BP 29 64 75
CMS 23 51 82997
Mapping Statistics
Too broad - 90Deleted - 58JCA Gap - 14
• Statistically, UJTs per JCA would = 2.2
FS - 13BA - 41FA - 98Log - 52C2 - 24NC - 22Prot - 36BP - 9CMS - 6
Unmapped
# JCAs Adjusted EV Actual
FS 45 32 133 118BA 70 29 120 141FA 122 24 100 106Log 82 30 125 124C2 76 52 216 234NC 50 28 116 87
Prot 44 8 33 30BP 29 20 83 75
CMS 23 17 71 82541 240 *4.15 997
# JCAs
FS 45BA 70FA 122Log 82C2 76NC 50
Prot 44BP 29
CMS 23
• Adjusted for un-mapped JCAs = 4.15
• Ideally, mappings at tier 3 & below = 2.4
UNCLASSIFIED UNCLASSIFIED11
JCAMS Web Access
http://www.dtic.mil/futurejointwarfare/cap_areas.htm
UNCLASSIFIED UNCLASSIFIED12
JCAMS Overview Page
UNCLASSIFIED UNCLASSIFIED
Linkages View from JCA Perspective
UNCLASSIFIED UNCLASSIFIED
Linkages View from UJT Perspective
UNCLASSIFIED UNCLASSIFIED
Deleted Tasks
UNCLASSIFIED UNCLASSIFIED
“Broadly Written” Tasks
UNCLASSIFIED UNCLASSIFIED
“JCA Gap” Tasks
UNCLASSIFIED UNCLASSIFIED18
Log In Added to the Overview Page
UNCLASSIFIED UNCLASSIFIED19
UJTL Linkages – JCA View
UNCLASSIFIED UNCLASSIFIED20
JCA Recommend Form
UNCLASSIFIED UNCLASSIFIED21
UJTL Linking JCAs Definitions Shown
UNCLASSIFIED UNCLASSIFIED22
UJTL Recommendation Form
UNCLASSIFIED
23
UNCLASSIFIED
JCA Timeline
Jan 10
Jan 09
Jul 09
12 Jan 09 JCA Refinement Tiers 1 – 7 approved
Initial UJTL to JCAMapping Completed
Socialize MappingJul – Aug
JS 136 StaffingSep - Oct
JCA ReviewSep - Dec
Svc Task to JCA Mapping
JCA – JCRM Integration
JCA – DRRS/CRS Integration
UNCLASSIFIED
24
UNCLASSIFIED
Questions?
UNCLASSIFIED UNCLASSIFIED25
Profile Page