-
7/25/2019 UBL3&4 E 0 G0 ES AA0 002P_R3_Color Schedule for Power Plant
1/12
-
7/25/2019 UBL3&4 E 0 G0 ES AA0 002P_R3_Color Schedule for Power Plant
2/12
-
7/25/2019 UBL3&4 E 0 G0 ES AA0 002P_R3_Color Schedule for Power Plant
3/12
TABLE OF CONTENTS
Page
General 2
Mechanical Equipment for Ulubelu Unit 3&4 Power Plant 3
Ventilation 7
Electrical Equipment for Ulubelu Unit 3&4 Power Plant 8
Piping for Ulubelu Unit 3&4 Power Plant 10
-
7/25/2019 UBL3&4 E 0 G0 ES AA0 002P_R3_Color Schedule for Power Plant
4/12
Mechanical Equipment for Ulubelu Unit 3&4 Power Plant
Equipment NamePainting
ScheduleFinal Topcoat Color
RAL
NumberRemarks
BDL0 BDL1 BDL2 BDL3
1 Scrubber
1.1 Steam Scrubber UBL0 LBJ31 AT001 P-3a -- --
1.2 Scrubber Drain Pit Sump Pump (A) UBL0 LCM10 AP001 -- -- -- Stainless Steel
1.3 Scrubber Drain Pit Sump Pump (B) UBL* LCM10 AP002 -- -- -- Stainless Steel
1.4 Atmosphere Flash vessel (A) UBL0 LCM31 BS001 -- -- -- Stainless Steel
1.5 Atmosphere Flash vessel (B) UBL3 LCM32 BS002 -- -- -- Stainless Steel
1.6 Atmosphere Flash vessel (C) UBL4 LCM33 BS003 -- -- -- Stainless Steel
2 Steam Turbine and Auxiliar ies
2.1 Steam Turbine Casing INSULATED UBL* MAC10 P-3a -- --
UN-INSULATED P-2 Light Green 6021Bearing pedestal P-2 Light Green 6021
2.2 Steam Strainer (L) INSULATED UBL* MAC02 AT001 P-3a -- --
UN-INSULATED P-2 Light Green 6021
2.3 Steam Strainer (R) INSULATED UBL* MAC03 AT002 P-3a -- --
UN-INSULATED P-2 Light Green 6021
2.4 Main Steam Stop Valve(L) INSULATED UBL* MAC01 AA099 P-3a -- --
Main Steam Control Valve (L) UN-INSULATED UBL* MAC01 AA101 P-2 Light Green 6021
2.5 Main Steam Stop Valve(R) INSULATED UBL* MAC01 AA100 P-3a -- --
Main Steam Control Valve (R) UN-INSULATED UBL* MAC01 AA102 P-2 Light Green 6021
2.6 Blade washing pump (A) UBL* PAB61 AP001 -- -- --
2.7 Blade washing pump (A) Motor UBL* PAB61 AP001 -M01 Manufacturer's Standard2.8 Blade washing pump (B) UBL* PAB61 AP002 -- -- --
2.9 Blade washing pump (B) Motor UBL* PAB61 AP002 -M02 Manufacturer's Standard
2.10 Lube Oil Console
2.10.1 Main Oil Tank (Exterior) UBL* MAV10 BB001 Light Green 6021
2.10.2 Main Oil Pump (A) UBL* MAV21 AP002 Light Green 6021
2.10.3 Main Oil Pump (A) Motor UBL* MAV21 AP002 -M02 Blue 5010
2.10.4 Main Oil Pump (B) UBL* MAV22 AP003 Light Green 6021
2.10.5 Main Oil Pump (B) Motor UBL* MAV22 AP003 -M03 Blue 5010
2.10.6 Emergency Oil Pump UBL* MAV23 AP001 Light Green 6021
2.10.7 Emergency Oil Pump Motor UBL* MAV23 AP001 -M01 Blue 5010
2.10.8 Jacking Oil Pump UBL* MAV51 AP004 Light Green 6021
2 10 9 Jacking Oil Pump Motor UBL* MAV51 AP004 M04 Blue 5010
Equipment Number
In case of Unit 3: * means 3
In case of Unit 4: * means 4
-
7/25/2019 UBL3&4 E 0 G0 ES AA0 002P_R3_Color Schedule for Power Plant
5/12
Equipment NamePainting
ScheduleFinal Topcoat Color
RAL
NumberRemarks
Equipment Number
In case of Unit 3: * means 3
In case of Unit 4: * means 4
3.9 Seal Water Discharge Separator (A) UBL* MAJ61 AT001 -- -- -- Stainless Steel
3.10 Vacuum pump (B) UBL* MAJ71 AP002 -- -- -- Stainless Steel
3.11 Vacuum pump (B) Motor UBL* MAJ71 AP002 -M02 P-1a Blue 5010
3.12 Vacuum Pump (B) Gear Reducer UBL* MAJ71 AU002 P-1a Green 6017
3.13 Seal Water Discharge Separator (B) UBL* MAJ71 AT002 -- -- -- Stainless Steel
3.14 Vacuum pump (C) UBL* MAJ81 AP003 -- -- -- Stainless Steel
3.15 Vacuum pump (C) Motor UBL* MAJ81 AP003 -M03 P-1a Blue 5010
3.16 Vacuum Pump (C) Gear Reducer UBL* MAJ81 AU003 P-1a Green 6017
3.17 Seal Water Discharge Separator (C) UBL* MAJ81 AT003 -- -- -- Stainless Steel
3.18 HWP Pit Sump Pump (A) UBL* GMC10 AP003 -- -- -- Stainless Steel
3.19 HWP Pit Sump Pump (B) UBL* GMC10 AP004 -- -- -- Stainless Steel
4 Main Cooling Water System
4.1 Cooling Tower UBL* PAD01 AC001
4.1.1 Cooling Tower Fan (A) UBL* PAD01 AN001 -- -- -- FRP
4.1.2 Cooling Tower Fan (A) Motor UBL* PAD01 AN001 -M01 P-1a Blue 5010
4.1.3 Cooling Tower Fan (A) Gear UBL* PAD01 AU001 P-1b Green, May 6017
4.1.4 Cooling Tower Fan (B) UBL* PAD02 AN002 -- -- -- FRP
4.1.5 Cooling Tower Fan (B) Motor UBL* PAD02 AN002 -M02 P-1a Blue 5010
4.1.6 Cooling Tower Fan (B) Gear UBL* PAD02 AU002 P-1b Green, May 6017
4.1.7 Cooling Tower Fan (C) UBL* PAD03 AN003 -- -- -- FRP
4.1.8 Cooling Tower Fan (C) Motor UBL* PAD03 AN003 -M03 P-1a Blue 5010
4.1.9 Cooling Tower Fan (C) Gear UBL* PAD03 AU003 P-1b Green, May 6017
4.1.10 Cooling Tower Fan (D) UBL* PAD04 AN004 -- -- -- FRP
4.1.11 Cooling Tower Fan (D) Motor UBL* PAD04 AN004 -M04 P-1a Blue 5010
4.1.12 Cooling Tower Fan (D) Gear UBL* PAD04 AU004 P-1b Green, May 60174.1.13 Cooling Tower Fan (E) UBL* PAD05 AN005 -- -- -- FRP
4.1.14 Cooling Tower Fan (E) Motor UBL* PAD05 AN005 -M05 P-1a Blue 5010
4.1.15 Cooling Tower Fan (E) Gear UBL* PAD05 AU005 P-1b Green, May 6017
4.1.16 Cooling Tower Fan (F) UBL* PAD06 AN006 -- -- -- FRP
4.1.17 Cooling Tower Fan (F) Motor UBL* PAD06 AN006 -M06 P-1a Blue 5010
4.1.18 Cooling Tower Fan (F) Gear UBL* PAD06 AU006 P-1b Green, May 6017
4.2 Intake Screen (A) UBL* PAA01 AT001
4.3 Intake Screen (B) UBL* PAA01 AT002
4.4 Intake Screen (C) UBL0 PAA01 AT003
4.5 Hotwell Pump (A) UBL* PAC01 AP001 Green, May 6017
4.6 Hotwell Pump (A) Motor UBL* PAC01 AP001 -M01 Blue 5010
-- -- --
P 1a
Stainless Steel
3
3
-
7/25/2019 UBL3&4 E 0 G0 ES AA0 002P_R3_Color Schedule for Power Plant
6/12
Equipment NamePainting
ScheduleFinal Topcoat Color
RAL
NumberRemarks
Equipment Number
In case of Unit 3: * means 3
In case of Unit 4: * means 4
7 Lifting Equipment
7.1 Workshop O/H Crane UBL0 SMD01 AE001
7.2 Turbine Generator O/H Crane UBL0 SMA01 AE002
7.3 Mobile crane UBL0 SMB01 AE003
8 Ventilation and Air Conditioning SystemDetail Ventilation are defined in sheet
"Mechanical (B1)
9 Chemical Treatment System
9.1 NaOH Dilution Tank UBL0 PBN11 BB001 -- -- -- FRP
9.2 Agitator UBL0 PBN11 AM001 -- -- -- Stainless Steel
9.3 Agitator Motor UBL0 PBN11 AM001 -M01 Manufacturer's Standard
9.4 NaOH Injection Pump (A) UBL* PBN21 AP001 -- -- -- Stainless Steel
9.5 NaOH Injection Pump (A) Motor UBL* PBN21 AP001 -M01 Manufacturer's Standard
9.6 NaOH Injection Pump (B) UBL* PBN21 AP002 -- -- -- Stainless Steel
9.7 NaOH Injection Pump (B) Motor UBL* PBN21 AP002 -M02 Manufacturer's Standard
9.8 NaOH Injection Pump (C) UBL* PBN21 AP003 -- -- -- Stainless Steel
9.9 NaOH Injection Pump (C) Motor UBL* PBN21 AP003 -M03 Manufacturer's Standard
9.10 Biocide (A) Storage Tank UBL0 QCH11 BB001 -- -- -- FRP
9.11 Biocide (A) Dosing Pump (A) UBL0 QCH11 AP001
9.12 Biocide (A) Dosing Pump (A) Motor UBL0 QCH11 AP001 -M01
9.13 Biocide (A) Dosing Pump (B) UBL0 QCH11 AP002
9.14 Biocide (A) Dosing Pump (B) Motor UBL0 QCH11 AP02 -M02
9.15 Biocide (B) Storage Tank UBL0 QCJ12 BB001 -- -- -- FRP
9.16 Biocide (B) Dosing Pump (A) UBL0 QCJ12 AP001
9.17 Biocide (B) Dosing Pump (A) Motor UBL0 QCJ12 AP001 -M019.18 Biocide (B) Dosing Pump (B) UBL0 QCJ12 AP002
9.19 Biocide (B) Dosing Pump (B) Motor UBL0 QCJ12 AP02 -M02
10 Fresh W ater System
10.1 WTP Booster Pump (A) UBL0 GBB01 AP001 Green, May 6017
10.2 Motor for WTP Booster Pump (A) UBL0 GBB01 AP001 -M01 Blue 5010
10.3 WTP Booster Pump (B) UBL0 GBB01 AP002 Green, May 6017
10.4 Motor for WTP Booster Pump (B) UBL0 GBB01 AP002 -M01 Blue 5010
10.5 Fresh Water Booster Booster Pump (A) UBL0 GHB02 AP001 Green, May 6017
10.6 Motor for Fresh Water Booster Booster Pump (A) UBL0 GHB02 AP001 -M01 Blue 5010
10.7 Fresh Water Booster Booster Pump (B) UBL0 GHB02 AP002 Green, May 6017
P-2
Manufacturer's Standard
Manufacturer's Standard
P-2 Traffic Yellow 1028
manufacture standard
-
7/25/2019 UBL3&4 E 0 G0 ES AA0 002P_R3_Color Schedule for Power Plant
7/12
Equipment NamePainting
ScheduleFinal Topcoat Color
RAL
NumberRemarks
Equipment Number
In case of Unit 3: * means 3
In case of Unit 4: * means 4
13.18 Outdoor Hose Box (D) UBL0 SGA07 HB002
13.19 Outdoor Hydrant (E) UBL0 SGA07 HYD03
13.20 Outdoor Hose Box (E) UBL0 SGA07 HB003
13.21 Outdoor Hydrant (F) UBL0 SGA07 HYD04
13.22 Outdoor Hose Box (F) UBL0 SGA07 HB004
13.23 Outdoor Hydrant (G) UBL0 SGA07 HYD05
13.24 Outdoor Hose Box (G) UBL0 SGA07 HB005
13.25 Indoor Hydrant (A) UBL0 SGA08 HYD01
13.26 Indoor Hydrant (B) UBL0 SGA08 HYD02
13.27 Indoor Hydrant (C) UBL0 SGA08 HYD03
13.28 Indoor Hydrant (D) UBL0 SGA08 HYD04
13.29 Indoor Hydrant (E) UBL0 SGA08 HYD05
13.30 Indoor Hydrant (F) UBL0 SGA08 HYD06
13.31 Indoor Hydrant (G) UBL0 SGA08 HYD07
13.32 Indoor Hydrant (H) UBL0 SGA08 HYD08
13.33 Indoor Hydrant (I) UBL0 SGA08 HYD09
13.34 Indoor Hydrant (J) UBL0 SGA08 HYD10
13.35 Deluge Valve (A) UBL0 SGC01 AA001
13.36 Deluge Valve (B) UBL0 SGC01 AA002
13.37 Deluge Valve (C) UBL0 SGC01 AA003
13.38 Deluge Valve (D) UBL0 SGC01 AA004
13.39 Deluge Valve (E) UBL0 SGC01 AA005
13.40 Deluge Valve (F) UBL0 SGC01 AA006
13.41 Deluge Valve (G) UBL0 SGC01 AA007
13.42 Deluge Valve (H) UBL0 SGC01 AA008
13.43 Deluge Valve (I) UBL0 SGC01 AA00913.44 Deluge Valve (J) UBL0 SGC01 AA010
13.45 Deluge Valve (K) UBL0 SGC01 AA011
13.46 FM-200 or Novec UBL0 SGM01 SG001 P-2
14 Emergency Generator Unit
14.1 Diesel Fuel Daily Tank UBL0 XJA01 BB001 P-1a Brown 8002
15 Waste Water Treatment System
15.1 Oil Water Separator UBL0 GRB01 AT002 N/A N/A N/A
3000
P-2
P-1a
P-1a
Red
3
3
3
-
7/25/2019 UBL3&4 E 0 G0 ES AA0 002P_R3_Color Schedule for Power Plant
8/12
Ventilation
Equipment NameEquipment Number
Painting
Schedule
Final
Topcoat
Color
RAL Number Remarks
BDL0 BDL1 BDL2 BDL3
1 Ventilation and Air Conditioning System
1.1 POWER HOUSE BUILDING
GROUND FLOOR (GF)
a. UBL0 SAA01 AH001 -
b. UBL0 SAA01 AH001 -KN -
c. UBL0 SAA01 AH002 -
d. UBL0 SAA01 AH002 -KN -
e. UBL0 SAA01 AH003 -
f. UBL0 SAA01 AH003 -KN -
g. UBL0 SAA01 AH004 -
h. UBL0 SAA01 AH005 -
i. UBL0 SAA01 AH006 -
j. H2S Filter for Power House Building Ground Floor (GF) UBL0 SAA01 AH007 -
k. UBL0 SAA01 AH008 -
l. UBL0 SAA01 AH009 -
m. UBL0 SAA01 AH010 -n. UBL0 SAA01 AH011 -
o. UBL0 SAA01 AH012 -
p. UBL0 SAA01 AH013 -
q. UBL0 SAA01 AH014 P-4b
r. UBL0 SAA01 AH015 P-4b
s. UBL0 SAA01 AH016 P-4b
FIRST FLOOR (1F)
a. UBL0 SAA01 AH017 -
b. UBL0 SAA01 AH017 -KN -
c. UBL0 SAA01 AH018 -
d. UBL0 SAA01 AH018 -KN -
e. UBL0 SAA01 AH019 -
f. UBL0 SAA01 AH019 -KN -
g. UBL0 SAA01 AH020 -
h. UBL0 SAA01 AH021 -
i. UBL0 SAA01 AH022 -
j. H2S Filter for Power House Building First Floor (1F) UBL0 SAA01 AH023 -
k. UBL0 SAA01 AH024 -
l. UBL0 SAA01 AH024 -KN -
m. UBL0 SAA01 AH025 -
n. UBL0 SAA01 AH025 -KN -
o UBL0 SAA01 AH026
Manufacture Std
Manufacture Std
Split Wall Mounted type AC Unit (Indoor) for Operator Training Room Power House
Building First Floor (1F)
AHU (Indoor) A for Power Power House Building First Floor (1F)
AHU (Indoor) C for Power Power House Building First Floor (1F)
CDU (Outdoor) C for Power Power House Building First Floor (1F)
Electric Duct Heater for AHU Power House Building First Floor (1F)
Pressurized Fan A for Power House Building First Floor (1F)
Pressurized Fan B for Power House Building First Floor (1F)
Split Wall Mounted type AC Unit (Outdoor) for Gymnasium Room Power House Building
First Floor (1F)
Ventilation Fan for Battery Room at Power House Building Ground Floor (GF)Ventilation Fan for Kitchen at Power House Building Ground Floor (GF)
Ventilation Fan for DEG Room at Power House Building Ground Floor (GF)
Split Wall Mounted type AC Unit (Indoor) for Gymnasium Room Power House Building First
Floor (1F)
HVAC PLC Panel for All HVAC System
HVAC Duct Heater Panel for All HVAC System
HVAC Distribution Panel for All HVAC System
Ventilation Fan for Turbine Hall at Power House Building Ground Floor (GF)
AHU (Indoor) B for Power Power House Building Ground Floor (GF)
CDU (Outdoor) A for Power Power House Building Ground Floor (GF)
CDU (Outdoor) B for Power Power House Building Ground Floor (GF)
CDU (Outdoor) C for Power Power House Building Ground Floor (GF)
Electric Duct Heater for AHU Power House Building Ground Floor (GF)
Pressurized Fan A for Power House Building Ground Floor (GF)
Ventilation Fan for Toilet at Power House Building Ground Floor (GF)
AHU (Indoor) A for Power Power House Building Ground Floor (GF)
AHU (Indoor) C for Power Power House Building Ground Floor (GF)
Split Wall Mounted type AC Unit (Outdoor) for Pray Room Power House Building First Floor
(1F)
Split Wall Mounted type AC Unit (Indoor) for P ray Room Power House Building First Floor
(1F)
Ventilation Fan for Compressor Room at Power House Building Ground Floor (GF)
CDU (Outdoor) A for Power Power House Building First Floor (1F)
Pressurized Fan B for Power House Building Ground Floor (GF)
AHU (Indoor) B for Power Power House Building First Floor (1F)
CDU (Outdoor) B for Power Power House Building First Floor (1F)
-
7/25/2019 UBL3&4 E 0 G0 ES AA0 002P_R3_Color Schedule for Power Plant
9/12
Electrical Equipment for Ulubelu Unit 3&4 Power Plant
Equipment Name
Painting
Schedule
Final Topcoat
ColorRAL Number Remarks
BDL0 BDL1 BDL2 BDL3
1 Generator and Auxiliaries
1.1 Generator Stator Freame UBL* MKA01
Bearing Pedestal
1.2 Generator Air Cooler (A) UBL* MKA01 AC001
1.3 Generator Air Cooler (B) UBL* MKA01 AC002
1.4 Generator Air Cooler (C) UBL* MKA01 AC003
1.5 Brushless Exciter UBL* MKC20
1.6 Permanent Magnet Generator UBL* MKC10
1.7 Generator Neutral Grounding Cubicle UBL* BAU01 GZ001 P-4b Grey, Silica 7032
1.8 Generator VT/SA Cubicle UBL* BAY01 CE200 P-4b Grey, Silica 7032
1.9 Generator Current Transformer (Line Side) UBL* BAY02 CE100
1.10 Generator Current Transformer (Neutral Side) UBL* BAY03 CE100
2 Power Transformer
2.11 GENERATOR TRANSFORMER UNIT 3 UBL3 BAT01 GT001 -T01 P-1a Grey, Blue 7031
2.2 GENERATOR TRANSFORMER UNIT 4 UBL4 BAT01 GT001 -T01 P-1a Grey, Blue 7031
2.3 UNIT 3 AUXILIARY TRANSFORMER UBL3 BBT01 GT001 -T01 P-1a Grey, Blue 7031
2.4 UNIT 4 AUXILIARY TRANSFORMER UBL4 BBT01 GT001 -T01 P-1a Grey, Blue 7031
2.5 UNIT 3 SERVICE TRANSFORMER UBL3 BFT01 GT001 -T01 P-1a Grey, Blue 7031
2.6 UNIT 4 SERVICE TRANSFORMER UBL4 BFT01 GT001 -T01 P-1a Grey, Blue 7031
2.7 STATION SERVICE TRANSFORMER UBL0 BFT01 GT001 -T01 P-1a Grey, Blue 7031
2.8 Unit 3 Lighting Transformer UBL3 BFT02 GT001 -T01 P-1a Grey, Blue 7031
2.9 Unit 4 Lighting Transformer UBL4 BFT02 GT001 -T01 P-1a Grey, Blue 7031
2.10 Station Service Lighting Transformer 1 UBL0 BFT02 GT001 -T01 P-1a Grey, Blue 7031
2.11 Station Service Lighting Transformer 2 UBL0 BFT02 GT001 -T02 P-1a Grey, Blue 7031
3 Switchgear and Electr ical Panel
3.1 Generator Circuit Breaker Unit 3 UBL3 BAC01 GS001 -Q01 p-4a Pebble Grey 7032
3.2 Generator Circuit Breaker Unit 4 UBL4 BAC01 GS001 -Q01 p-4a Pebble Grey 7032
3.3 Insulated Phase Bus Duct Unit 3 UBL3 BAY01 BR001 - Manufacture standard
3.4 Insulated Phase Bus Duct Unit 4 UBL4 BAY01 BR001 - Manufacture standard
3.5 Unit 3 Medium Voltage Switchgear UBL3 BBA01 GS001 p-4a Pebble Grey 7032
3.6 Unit 4 Medium Voltage Switchgear UBL4 BBA01 GS001 p-4a Pebble Grey 7032
3.7 Sation Medium Voltage Switchgear UBL0 BBA01 GS001 p-4a Pebble Grey 7032
3.8 UNIT 3 LV Switchgear UBL3 BGB01 GS001 p-4a Pebble Grey 7032
3.9 UNIT 4 LV Switchgear UBL4 BGB01 GS001 p-4a Pebble Grey 7032
3.10 LV Station Switchgear UBL0 BGB01 GS001 p-4a Pebble Grey 7032
3.11 Unit 3 Normal Board (non essensial) UBL3 BGB02 GS001 p-4a Pebble Grey 7032
3.12 Unit 4 Normal Board (non essensial) UBL4 BGB02 GS001 p-4a Pebble Grey 7032
3.13 Station Normal Board (non essensial) UBL0 BGB02 GS001 p-4a Pebble Grey 7032
3.14 Unit 3 Essensial Board UBL3 BGC01 GS001 p-4a Pebble Grey 7032
3 15 Unit 4 Essensial Board UBL4 BGC01 GS002 p 4a Pebble Grey 7032
-- Epoxy resin--
Equipment Number
In case of Unit 3: * means 3
In case of Unit 4: * means 4
P-2 Blue 5010
--
3
-
7/25/2019 UBL3&4 E 0 G0 ES AA0 002P_R3_Color Schedule for Power Plant
10/12
Equipment Name
Painting
Schedule
Final Topcoat
ColorRAL Number Remarks
Equipment Number
In case of Unit 3: * means 3
In case of Unit 4: * means 4
6.10 150kV Disconnecting Switch for Transformer Bay 3.1 UBL3 AE001 GS203 -- -- --
6.11 150kV Disconnecting Switch for Transformer Bay 3.2 UBL3 AE001 GS204 -- -- --
6.12 150kV Disconnecting Switch for Transformer Bay 4.1 UBL4 AE001 GS203 -- -- --
6.13 150kV Disconnecting Switch for Transformer Bay 4.2 UBL4 AE001 GS204 -- -- --
614 150kV Disconnecting Switch for Coupler Bay 1 UBL0 AE001 GS201 -- -- --615 150kV Disconnecting Switch for Coupler Bay 2 UBL0 AE001 GS202 -- -- --
6.16 150kV Disconnecting Switch / Earthing for Line Bay 3 UBL3 AE001 GS301 -- -- --
6.17 150kV Disconnecting Switch / Earthing for Line Bay 4 UBL4 AE001 GS301 -- -- --
6.18 150kV Disconnecting Switch / Earthing for Transformer Bay 3 UBL3 AE001 GS302 -- -- --
6.19 150kV Disconnecting Switch / Earthing for Transformer Bay 4 UBL4 AE001 GS302 -- -- --
6.20 150kV Capacitance Voltage Transformer for Line Bay 3 UBL3 AE001 CE201 -- -- --
6.21 150kV Capacitance Voltage Transformer for Line Bay 4 UBL4 AE001 CE201 -- -- --
6.22 150kV Capacitance Voltage Transformer Bus 1 UBL0 AE001 CE201 -- -- --
6.23 150kV Capacitance Voltage Transformer Bus 2 UBL0 AE001 CE202 -- -- --
6.24 150kV Current Transformer for Line Bay 3 UBL3 AE001 CE101 -- -- --
6.25 150kV Current Transformer for Line Bay 4 UBL4 AE001 CE101 -- -- --
6.26 150kV Current Transformer for Transformer Bay 3 UBL3 AE001 CE102 -- -- --
6.27 150kV Current Transformer for Transformer Bay 4 UBL4 AE001 CE102 -- -- --
6.28 150kV Current Transformer for Coupler Bay UBL0 AE001 CE101 -- -- --6.29 150 kV Switchyard Lightning Arrester for Line Bay 3 UBL3 AE001 GV001 -- -- --
6.30 150 kV Switchyard Lightning Arrester for Line Bay 4 UBL4 AE001 GV001 -- -- --
6.31 150 kV Switchyard Lightning Arrester for Transformer Bay 3 UBL3 AE001 GV002 -- -- --
6.32 150 kV Switchyard Lightning Arrester for Transformer Bay 4 UBL4 AE001 GV002 -- -- --
6.33 150kV Marshalling Cubicle for Line Bay 3 UBL3 AV01 GH001 -- -- --
6.34 150kV Marshalling Cubicle for Line Bay 4 UBL4 AV01 GH001 -- -- --
6.35 150kV Marshalling Cubicle for Transformer Bay 3 UBL3 AV01 GH002 -- -- --
6.36 150kV Marshalling Cubicle for Transformer Bay 4 UBL4 AV01 GH002 -- -- --
6.37 150kV Marshalling Cubicle for Coupler Bay UBL0 AV01 GH001 -- -- --
7. Emergency Service System
7.1 Emergency Diesel Generator UBL0 XJA01 CJ001 - Manufacture standard
7.2 Emergency Diesel Generator Panel UBL0 XJY01 CJ001 P-4b Pebble Grey 7032
7.3 110V DC Battery Charger System A UBL0 BTL01 GU001 P-4a Pebble Grey 7032
7.4 110V DC Battery Charger System B UBL0 BTL01 GU002 P-4a Pebble Grey 7032
7.5 110V DC Battery System A UBL0 BTA01 GR001 P-4a Pebble Grey 7032
7.6 110V DC Battery System B UBL0 BTA01 GR002 P-4a Pebble Grey 7032
7.7 110V DC Main Distribution Board UBL0 BUA01 GS001 P-4a Pebble Grey 7032
7.8 U3 110V DC Distribution Board UBL3 BUA01 GS001 P-4a Pebble Grey 7032
7.9 U4 110V DC Distribution Board UBL4 BUA01 GS001 P-4a Pebble Grey 7032
7.10 Common 110V DC Distribution Board UBL0 BUA01 GS002 P-4a Pebble Grey 7032
7.11 Uninterruptible Power Source System A UBL0 BRU01 GU001 P-4a Pebble Grey 7032
7.12 Uninterruptible Power Source System B UBL0 BRU01 GU002 P-4a Pebble Grey 7032
7.13 230V AC UPS Main Distribution Board UBL0 BRU01 GS001 P-4a Pebble Grey 7032
8. Telephone, Internal Communication and Clock System
8 1 T l h S t UBL0 CYA01
-
7/25/2019 UBL3&4 E 0 G0 ES AA0 002P_R3_Color Schedule for Power Plant
11/12
Piping or Ulubelu Unit 3&4 Power Plant
Equipment Name Coating Base Color Band Remarks
Spec. No Final Topcoat RAL Final Topcoat RAL
Spec. No. Color Number Color Number
1. Steam system
1.1 Steam piping with insulation -- -- -- Red RAL 30201.2 Drain piping -- -- -- -- -- Stainless Steel
2 Lube/Contro l o il system
2.1 Lube oil piping Supply line -- -- -- Stainless Steel
Return line P-2 Brown RAL8001
2.2 Clean / Dirty oil piping P-1a, P-2 Brown RAL8001 Yellow RAL1016
2.3 Control piping -- -- -- Yellow RAL1016 Stainless Steel
3 Water System
3.1 Stainless steel, FRP, Galvanis, HDPE
3.1.1 Fresh water piping -- -- -- Orange RAL2004
3.1.2 Main Cooling piping -- -- -- Aluminum RAL9006
3.1.3 Primary Aux. Cooling piping -- -- -- Aluminum RAL90063.1.4 Reinjection, Waste piping -- -- -- Coral Red RAL 3016
3.2 Carbon steel
3.2.1 Secondary Aux. Cooling piping P-1a, P-2 Green RAL6024 Yellow RAL1023
3.2.2 Waste piping P-1a, P-2 Mint Green RAL 6029 Jet Black RAL 9005
3.2.3 Raw water piping P-1a, P-2 Mint Green RAL 6029 Stone Grey RAL 7030
3.2.4 Fire Protection Water piping P-1a, P-2 Red RAL 3000 None -
3.2.5 Reinjection, Waste piping P-1a, P-2 Mint Green RAL 6029 Coral Red RAL 3016
4 Air System
4.1 instrument piping -- -- -- Red RAL 3020 Stainless Steel
4.2 Service piping -- -- -- Red RAL 3020 Stainless Steel
5 Chemical system
5.1 Stainless steel, FRP, Galvanis
5.1.1 NaOH piping -- -- -- Black RAL9005 Stainless Steel
5.1.2 Biocide piping -- -- -- Black RAL9005 FRP
Color Band for Piping
Yellow RAL1016
ColorBand
1
3
3
-
7/25/2019 UBL3&4 E 0 G0 ES AA0 002P_R3_Color Schedule for Power Plant
12/12
Page 1 of 1
Ulubelu Unit 3&4 Geothermal Power Project
CONTRACTOR EXPLANATION SHEET
Issued Date
Rev 3
Rev 3
No. Page Revised points
1 3 - 6, 8, 10
GN0040P1-DKT/L013
Contractor divided P-1a and P-1b from P-1 in Coating specification (UBL3&4-E-0-G0-ES-AA0-001P Rev.3). Therefore, this document was
revised from P-1 to P-1a or P-1b. P-1b is applied to the cooling tower gear only.
Status For Construction
22 May, 2015
Document No. / PGE UBL3&4-E-0-G0-ES-AA0-002
Document No. / Contractor
Document Title Color Schedule for Power Plant