Page 1: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

Auth

ors:

Sar

ah B

. Fic

k, M

ehm

et Is

cim

en, P

.E.

GEA

G 2

012

TVA

Kin

gsto

n Pe

nins

ula

Dis

posa

l Site

Proj

ect C

halle

nges

Dev

elop

ing

Ove

r Kar

st F

orm

atio

nsAu

thor

s:

Meh

met

Isci

men

, P.E

.; Sa

rah

B. F

ick;

Cun

eyt G

okm

en, P

.E.;

Nei

l Dav

ies,

P.E

.; R

ache

l Bur

nette

-Com

bs; S

cott

Turn

bow

2015

2015

Wo

rld

of

Co

al A

sh (

WO

CA

) C

on

fere

nce

in N

asvh

ille,

TN

- M

ay 5

-7, 2

015

htt

p:/

/ww

w.f

lyas

h.in

fo/

Page 2: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

2

KIN

GST

ON

FO

SSIL

PLA

NT

(KIF

)Si

te L

ocat

ion

Page 3: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

3

PEN

INSU

LA S

ITE

Gyp

sum

Dis

posa

l Are

a (G

DA

) Pha

se I

Lift

Stat

ion

Lift

Stat

ion

Cen

tral

D

rain

age

Cor

ridor

Cen

tral

D

rain

age

Cor

ridor

SW

Pond

SW

Pond

2010

2010

Page 4: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

4

GYP

SUM

DIS

POSA

L A

REA

D

ec. 1

5, 2

010

Dro

p-ou

t

Page 5: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

5

AG

END

A

•Pr

ojec

t Cha

lleng

es

•Si

te In

vest

igat

ion

–Si

te G

eolo

gy–

Roo

t-Cau

se A

naly

sis

•D

rop-

out I

nves

tigat

ion

& M

itiga

tion

–O

ver-e

xcav

atio

n an

d id

entif

icat

ion

–R

epai

r effo

rt

•Li

ner a

nd D

rain

age

Syst

ems

–R

edes

igne

d im

prov

ed s

yste

m–

Ong

oing

wor

k an

d re

sear

ch

Page 6: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

6

Proj

ect C

halle

nges

•Pl

ant’s

pow

er g

ener

atio

n sc

hedu

le–

In <

1 ye

ar, (

I) id

entif

y ro

ot c

ause

of t

he s

ubsi

denc

e, (i

i) de

velo

p a

corre

ctiv

e ac

tion

plan

, (iii)

rece

ive

appr

oval

of m

ultip

le d

epar

tmen

ts w

ithin

TVA

and

TD

EC, a

nd (i

v)

impl

emen

t the

con

stru

ctio

n on

a s

ched

ule

that

had

no

flexi

bilit

y fo

r del

ays,

due

to

pow

er d

eman

d an

d op

erat

iona

l con

stra

ints

.

•C

ompl

ex s

ite g

eolo

gy

–m

ainl

y al

luvi

al re

sidu

um s

oils

ove

rlyin

g Kn

ox G

roup

bed

rock

form

atio

n su

scep

tible

to

the

deve

lopm

ent o

f kar

st fe

atur

es a

nd d

rop-

outs

.

•Pl

ant o

pera

tiona

l dem

ands

wet

to d

ry tr

ansi

tion

of C

CR

s at

KIF

–a

dew

ater

ing

faci

lity

for t

he g

ypsu

m w

as in

con

stru

ctio

n =>

des

ign

and

cons

truct

a

hybr

id d

ispo

sal f

acilit

y th

at w

ould

mee

t fut

ure

dry

disp

osal

regu

lato

ry re

quire

men

ts,

whi

le s

till b

eing

abl

e to

ope

rate

as

a w

et d

ispo

sal f

acilit

y du

ring

the

trans

ition

.

•C

hara

cter

istic

s of

CC

Rs

(e.g

., w

et v

s. d

ry p

roce

ssin

g, fl

y as

h vs

. gyp

sum

, et

c.)

–Pa

rticl

e si

ze c

ompa

tibilit

y w

ith s

elec

ted

filte

r med

ia, g

ranu

lar f

ilter

thic

knes

s, a

nd

cons

truct

ion

prac

tices

=>

effe

ctiv

enes

s of

filte

r and

dra

inag

e sy

stem

s / p

artia

l or

com

plet

e cl

oggi

ng.

Page 7: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

7

Geo

logi

c Fe

atur

es

Page 8: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

Dec

. 15,

201

0 D

rop-

out S

uspe

cted

Fo

rmat

ion

Mec

hani

sm 8

For i

llust

ratio

n O

nly

Not

to S

cale

Void

For

mat

ion

Surfa

ce c

onne

cts

to T

hroa

t

Gro

undw

ater

dis

pers

esTh

roug

h be

droc

k re

gim

e

SOIL

EM

BAN

KMEN

T

3 FT

CO

MPA

CTE

D C

LAY

LIN

ER

GC

L

APP

RO

XIM

ATE

LOC

ATIO

N

OF

12/1

5/10

DR

OP-

OU

T

FIN

GER

DR

AIN

1 FT

PR

OTE

CTI

VE S

OIL

CO

VER

MAX

IMU

M W

ATER

ELE

VATI

ON

SU

RVE

YED

(EL.

761

.1’)

THR

OAT

(EL.

743

.6’)

RO

CK

9.4

FT

5 FT

Hig

hly

wea

ther

ed/ir

regu

lar

Roc

k Fo

rmat

ion

(Cut

ter/P

inna

cle)

Page 9: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

9

Prev

ious

and

Pos

t Dro

p-ou

t Site

Inve

stig

atio

ns

•Pr

evio

us S

tudi

es–

(1) 1

5 ex

plor

ator

y bo

rings

and

4 s

eism

ic re

fract

ion

surv

eys

by S

ingl

eton

M

ater

ials

Eng

inee

ring

Lab

(198

8); (

2) 6

soi

l bor

ings

and

2 b

edro

ck c

orin

gsby

M

acte

c(2

003)

; (3)

55

geop

robe

borin

gs b

y TV

A (2

003

and

2005

); (4

) 26

soil

borin

gs, 1

4 be

droc

k co

rings

, 13

mon

itorin

g w

ells

, and

10

cone

pen

etra

tion

test

s by

Mac

tec

(200

5); (

5) 2

6 so

il bo

rings

and

3 m

onito

ring

wel

ls b

y M

acte

c(2

006)

.•

Post

Dro

p-ou

t Stu

dies

–G

eote

chni

cal E

xplo

ratio

n of

the

Dro

p-ou

t Are

a

•14

pie

zoco

ne(C

PTu)

and

7 s

eism

ic c

one

pene

tratio

n te

st (S

CPT

u) to

dep

ths

rang

ing

from

abo

ut 4

.4 fe

et to

abo

ut 4

3.8

feet

. •

Shel

by tu

bes

•Fi

ve te

mpo

rary

pie

zom

eter

s w

ere

set i

n fiv

e of

the

CPT

sou

ndin

g ho

les.

–D

ye-T

race

Stu

dy–

Addi

tiona

l Env

ironm

enta

l Sam

plin

g an

d G

roun

dwat

er L

evel

Dat

a C

olle

ctio

n–

Inve

stig

atio

n/R

epai

r of t

he D

rop-

out

–O

vera

ll La

ndfil

l Ins

pect

ion

–O

vera

ll Su

bsur

face

Inve

stig

atio

n an

d R

epai

r Pro

gram

•O

ver-e

xcav

atio

n an

d D

rop-

out M

itiga

tion

Page 10: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

Dec

. 15,

201

0 D

rop-

out

•Inc

rem

enta

l exc

avat

ion

to

soil/

bedr

ock

inte

rface

•Nom

inal

dim

ensi

on o

f 3.3

in

ches

•Dye

trac

e in

ject

ion

pipi

ng in

stal

led

•Dye

inje

ctio

n co

mpl

eted

Feb

7,

2011

10

Page 11: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

11

DR

OP-

OU

T IN

VEST

IGAT

ION

& M

ITIG

ATIO

N

Ove

r-ex

cava

tion

Page 12: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

12

BA

CK

GR

OU

ND

Scop

e of

Wor

k –

Phas

e IA

Page 13: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

13

Rem

edia

l Opt

ions

Con

side

red

•C

onve

ntio

nal d

rillin

g•

Geo

phys

ical

met

hods

•D

ynam

ic c

ompa

ctio

n•

Ove

r-exc

avat

ion

& pr

oof-r

ollin

g

Com

bine

d w

ith a

robu

st:

-Li

ner s

yste

m-

Dra

inag

e sy

stem

Page 14: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

14

Hig

hlig

hts

of O

ver-

exca

vatio

n an

d Pr

oof-R

ollin

g

•O

ver-e

xcav

ate

seve

n (7

) fee

t or m

ore

belo

w th

e lin

er le

vel;

•Pr

oof-r

oll t

he b

otto

m o

f ove

r-exc

avat

ion

with

hea

vy e

quip

men

t; an

d•

Back

-fill

with

com

pact

ed s

oil t

o re

ach

liner

gra

des

and

esta

blis

h a

“brid

ging

laye

r”.

Not

e th

at:

•Se

vent

y pe

rcen

t -ov

er-e

xcav

atio

n (i.

e., i

n th

ose

area

s w

here

line

r gr

ades

are

bel

ow th

e pr

edev

elop

men

t gra

des

and/

or th

e di

stan

ce

betw

een

the

liner

gra

des

and

the

pred

evel

opm

ent g

rade

s ar

e le

ss

than

sev

en (7

) fee

t). I

n th

ese

area

s, o

verb

urde

n so

il w

as o

ver-

exca

vate

d ge

nera

lly 7

feet

or m

ore

belo

w li

ner g

rade

, exc

avat

ion

botto

m w

as p

roof

-rolle

d, a

nd th

en e

xcav

atio

n ar

ea w

as b

ackf

illed

with

com

pact

ed s

oil t

o re

ach

liner

gra

des;

and

Thirt

y pe

rcen

t -fil

ling

and

com

pact

ion

effo

rts to

est

ablis

h lin

er

grad

es (i

.e.,

in th

ose

area

s w

here

line

r gra

des

are

7-ft

or m

ore

abov

e th

e pr

edev

elop

men

t gra

des—

area

s ou

tsid

e th

e ov

er-

exca

vatio

n zo

nes—

rece

ived

sev

en (7

) fee

t or m

ore

com

pact

ed fi

ll m

ater

ial t

o es

tabl

ish

the

liner

gra

des

and

thus

they

had

alre

ady

been

pr

oof-r

olle

d du

ring

fillin

g an

d co

mpa

ctio

n ef

forts

.

Page 15: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

15

Min

e Su

bsid

ence

Mod

el

Figu

re.

Min

e Su

bsid

ence

Sch

emat

ic M

odel

Bul

king

fa

ctor

Pso

il

Page 16: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

16

Min

e Su

bsid

ence

Mod

el -

II

Tabl

e. M

axim

um S

trai

n vs

Voi

d Si

ze

Page 17: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

17

BA

CK

GR

OU

ND

Phas

e IA

Typ

ical

Cro

ss-S

ectio

n

Page 18: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

18

BA

CK

GR

OU

ND

Scop

e of

Wor

k

BEFO

RE

AFTE

R10

oz/yd

2NW

GEO

TEXT

ILE F

ILTER

8” D

IA. S

DR-9

GY

PSUM

PERF

ERAT

ED H

DPE

PIPE

NO. 2

STO

NE

GCL

SUBG

RADE

COMP

ACTE

D CL

AY LI

NER

SOIL

COVE

R

Page 19: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

19

DR

OP-

OU

T IN

VEST

IGAT

ION

& M

ITIG

ATIO

NO

ver-

exca

vatio

n

Page 20: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

20

DR

OP-

OU

T IN

VEST

IGAT

ION

& M

ITIG

ATIO

N

Iden

tific

atio

n

Page 21: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

21

DR

OP-

OU

T IN

VEST

IGAT

ION

& M

ITIG

ATIO

NIn

vest

igat

ion

Page 22: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

22

DR

OP-

OU

T IN

VEST

IGAT

ION

& M

ITIG

ATIO

N

Rep

air E

ffort

1//S

hot R

ock

as n

eede

d &

grad

ed w

ith

No.

4 st

one

(typ.

)

Page 23: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

23

DR

OP-

OU

T IN

VEST

IGAT

ION

& M

ITIG

ATIO

N

Rep

air E

ffort

2//G

eote

xtile

(GT)

&

Soil

Fill

18 in

. loo

se s

oil l

ifts

(typ.

)

Page 24: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

24

DR

OP-

OU

T IN

VEST

IGAT

ION

& M

ITIG

ATIO

N

Rep

air E

ffort

3//A

ltern

atin

g Li

fts o

f Soi

l Fi

ll &

GT

fill t

o ba

se o

f exc

avat

ed a

rea

~3-5

lifts

(typ

)

Page 25: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

25

DR

OP-

OU

T IN

VEST

IGAT

ION

& M

ITIG

ATIO

N

Spec

ial D

rop-

outs

Page 26: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

26

LIN

ER S

YSTE

M

Page 27: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

27

LIN

ER S

YSTE

M

Con

cret

e R

iser

s D

esig

n So

lutio

n

Poly

Lock

TM

Page 28: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

28

LIN

ER S

YSTE

M

Con

cret

e R

iser

s D

esig

n So

lutio

n

Page 29: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

29

DR

AIN

AG

E SY

STEM

D

esig

ning

for C

CR

s

Page 30: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

30

DR

AIN

AG

E SY

STEM

D

esig

ning

for C

CR

s

10oz

/yd2

NW G

EOTE

XTILE

FILT

ER

8” D

IA. S

DR-9

GY

PSUM

PERF

ERAT

ED H

DPE

PIPE

NO. 2

STO

NE

GCL

SUBG

RADE

COMP

ACTE

D CL

AY LI

NER

SOIL

COVE

R

Page 31: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

31

DR

AIN

AG

E SY

STEM

D

esig

ning

for C

CR

s

Page 32: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

12

STAT

E O

F TH

E PR

AC

TIC

EFi

lter D

esig

n C

halle

nges

AGGREGATEFILTER

SYNT

HETICFILTER

Page 33: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

33

DR

AIN

AG

E SY

STEM

La

bora

tory

Con

firm

ed (P

hase

I)

Page 34: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

34

DR

AIN

AG

E SY

STEM

La

bora

tory

Con

firm

atio

n Fo

r Gyp

sum

(Pha

se II

& II

I)

1-2

ft

2-12

in

Gyp

sum

Slu

rry

Filte

r San

d

3 ft

1 ft

Filte

r San

d

Fine

Gra

vel

Coa

rse

Gra

vel

1 ft

1 ft

Gyp

sum

Slu

rry

PHA

SE II

PHA

SE II

I

Page 35: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

35

DR

AIN

AG

E SY

STEM

La

bora

tory

Con

firm

atio

n Fo

r Fly

Ash

and

Opt

imiz

atio

n

(Pha

se II

& II

I)

6 in

2-12

in

Com

pact

ed

or S

lurri

edFl

y As

h

Filte

r San

d

3 ft

12 in

Filte

r San

d

Fine

Gra

vel

Coa

rse

Gra

vel

6in

6 in

PHA

SE II

I•

Nex

t sta

ge o

f tes

ts w

ith fl

y as

h•

Opt

imiz

atio

n of

filte

r and

dra

inag

e la

yers

Com

pact

ed

or S

lurri

edFl

y As

h

PHA

SE II

Page 36: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

36

DR

AIN

AG

E SY

STEM

A

s-B

uilt

Page 37: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

37

Inco

min

g G

ypsu

m S

lurr

y (d

urin

g in

itial

wet

ope

ratio

n)

EFFE

CTI

VEN

ESS

OF

LEA

CH

ATE

CO

LLEC

TIO

N

SYST

EM

Filte

red

Gyp

sum

Lea

chat

e

Page 38: TVA Kingston Peninsula Disposal Site Phase IA: Project ... · TVA Kingston Peninsula Disposal Site Phase IA: Project Challenges Developing Over Karst Formations Author: Davies, Neil;Combs,

38

AM

ERIC

AN

CO

UN

CIL

OF

ENG

INEE

RIN

G C

OM

PAN

IES

(AC

EC) G

EOR

GIA

2014

EN

GIN

EER

ING

EX

CEL

LEN

CE

GR

AN

D A

WA

RD

PRO

JEC

T R

ECO

GN

ITIO

N

THA

NK

YO

U!

QU

ESTI

ON

S?