Download - TPP PROGRESS REPORT

Transcript
Page 1: TPP PROGRESS REPORT

1

TPP PROGRESS REPORT

Training

January 8, 2008

Office of Family PlanningTeen Pregnancy Prevention Program

ETR Associates, Statewide Training and Technical Assistance Project - Grant# 05-45368

Page 2: TPP PROGRESS REPORT

2

PRESENTER CONTACT INFORMATION

Joan Singson

Project Liaison/Training Specialist

ETR Associates

[email protected]

Page 3: TPP PROGRESS REPORT

3

TRAINING PURPOSE

Provide an overview of the revised TPP Progress Report Forms for MIP, I&E and CCG Programs.

Discuss new requirements for progress report submission.

Demonstrate the use of the Portable Document File (PDF) forms.

Page 4: TPP PROGRESS REPORT

4

AGENDA

IntroductionProcess DiscussionDemonstrationQuestions and Answers

Page 5: TPP PROGRESS REPORT

5

ADOBE ACROBAT

What is Adobe Acrobat and why do we need to use it? Portability – across platforms (Macintosh, PC –

Windows, etc) Interactive Forms Data Extraction

Page 6: TPP PROGRESS REPORT

6

ADOBE ACROBAT

Adobe Acrobat Full Version Standard or Professional Version

Adobe Acrobat 6.0, 7.0 or 8.0

Adobe Acrobat Reader Does not allow you to save the document.

Page 7: TPP PROGRESS REPORT

7

Process Discussion

Page 8: TPP PROGRESS REPORT

8

SUBMISSION

Due Dates for Submission

First Progress Report – Feb. 1st (Covering the period, July-Dec)

Second Progress Report – Aug. 1st (Covering the period, Jan-June)

Page 9: TPP PROGRESS REPORT

9

SUBMISSION

Email the completed Progress Report to: Contract Manager (CM) Program Consultant (PC)

Email the Progress Report by the due date. Contract Manager will document whether you

sent the Progress Report on time. Do not email the Progress Report to your

Evaluation Liaison.

Page 10: TPP PROGRESS REPORT

10

SUBMISSION

Progress Report Review Program Consultant will verify that the Progress Report

is complete Incomplete Report: PC will notify agency and require the

program to resubmit the entire progress report to the PC. Complete Report: PC will review the progress report for

program compliance. A letter will be sent to the agency within 30 days from the date the Progress Report is received by OFP. The letter will acknowledge compliance/non-compliance and may include feedback/recommendations.

After the Progress Report has been approved the PC will forward it to the Contract Manager & Evaluation Liaison.

Page 11: TPP PROGRESS REPORT

11

ELECTRONIC TRANSMISSION

Forms should be transmitted as separate documents in the following sequence: Part 1 – Progress Report Form Part 2 – Objective Status Form (OSF) by objective Attachment 1: Project Collaborative Roster Attachment 2: Family PACT Clinical Linkage Form Attachment 3: Sites of Service Attachment 4: Community Match Record (CCG Only) Attachment 5: Formal Collaborative Meeting

Agenda/Minutes (CCG Level II Only) – NO FORMS PROVIDED

Page 12: TPP PROGRESS REPORT

12

ATTACHMENTS

Email all required attachments only. Do not email any supporting documents.

All supporting documents must be maintained in the program office (i.e. sign-in sheets, flyers, brochures, articles, etc.).

Documents must be readily available for audits.

Page 13: TPP PROGRESS REPORT

13

DEMONSTRATION

Page 14: TPP PROGRESS REPORT

14

DEMONSTRATION

Part 1: Progress Report Form

http://www.etr.org/ofp/programForms/TPPProgRepPart1-12-20-07.pdf

Page 15: TPP PROGRESS REPORT

15

DEMONSTRATION

Part 2: Objective Status Form

http://www.etr.org/ofp/programForms/TPPprogRepPart2.pdf

Page 16: TPP PROGRESS REPORT

16

DEMONSTRATION

ATTACHMENT 1: PROJECT COLLABORATIVE ROSTER

http://www.etr.org/ofp/programForms/TPPAtt1AcollabRstr.pdf

Page 17: TPP PROGRESS REPORT

17

DEMONSTRATION

ATTACHMENT 2: FAMILY PACT CLINICAL LINKAGE ROSTER

http://www.etr.org/ofp/programForms/TPPAtt2FpactClinkTPP.pdf

Page 18: TPP PROGRESS REPORT

18

DEMONSTRATION

ATTACHMENT 3: SITES OF SERVICE

http://www.etr.org/ofp/programForms/TPPAtt3SitesofServiceRoster.pdf

Page 19: TPP PROGRESS REPORT

19

Questions and Answers

The next portion of the training is for CCG only.

Page 20: TPP PROGRESS REPORT

20

DEMONSTRATION

ATTACHMENT 4: COMMUNITY MATCH RECORD (CCG Only)

http://www.etr.org/ofp/programForms/TPPAtt4CommMtchRcd122007.pdf

Page 21: TPP PROGRESS REPORT

21

DEMONSTRATION

Basic PDF Instructions Download forms and instructions from the

Statewide Training and Technical Assistance. Website: www.etr.org/ofp

Save on your computer or disk before completing the forms (i.e. EOC I&E PR1 Part 1 Feb.08).

Familiarize yourself with Adobe Acrobat tools. Contact Joan Singson if you have questions.

Page 22: TPP PROGRESS REPORT

22

End of Training

Page 23: TPP PROGRESS REPORT

23

This training including Q&A sessions will be posted on the Statewide Training and

Technical Assistance Website: www.etr.org/ofp


Top Related