LETTER OF INVITATION
Subject: - Consultancy for Preparation of DPR for Avalanche Control structures
on Mughal Road in Jammu and Kashmir
Dear Sirs,
1. You are hereby invited to submit technical and financial proposals for consultancy
services required forPreparation of DPR for Avalanche Control Structures on Mughal
Road which could form the basis for future negotiations and ultimately a contract
between your firm and Mughal Road Organization.
2. The purpose of this assignment is to prepare a comprehensive DPR for Avalanche
Control structures on Mughal Road based on requisite survey, detailedinvestigations and rigorous design/detailing of proposed structures along with
estimates and BOQ for the work.
3. The following documents are enclosed to enable you to submit your proposal:
(a) Terms of reference (TOR) (Annexure 1);
(b) Supplementary information for consultants, including a suggested format of
curriculum vitae (Annexure 2); and
(c) A Sample Form of Contract for Consultants' Services under which the services will
be performed (Annexure 3).
4. In order to obtain first hand information on the assignment and the site conditions,
it is considered desirable that a representative of your firm visit office of the Chief
Engineer, Mughal Road Project, Sector-2 Channi Himmat, Jammu before the proposal is
submitted. Your representative may meet the following official:
TechnicalOfficer to
Chief Engineer,Mughal Road Project,Sector-2, Channi Himmat,
Jammu
Ph: 0191-2463124
Please ensure that advance intimation regarding your visit is sent to enable him to
be available.
-
8/9/2019 TOR Avalanche
2/22
5. The Submission of Proposals: The proposals shall be submitted in two parts, viz.,
Technical and Financial and should follow the form given in the "Supplementary
Information for Consultants."
5.1 The "Technical" and "Financial" proposals must be submitted in two separate sealedenvelopes (with respective marking in bold letters) following the formats/schedules given
in the supplementary information for consultants. The first envelope marked "Technical
proposal" should include the description of the firm/organization, the firms general
experience in the field of assignment, the qualification and competency of the personnel
proposed for the assignment and the proposed work plan methodology and approach
response to suggested terms of reference. The first envelope should not contain any cost
information whatsoever. The second envelope marked 'FINANCIAL PROPOSAL' must
also be sealed with sealing wax and initialed twice across the seal and should contain the
detailed price offer for the consultancy services.
You will provide detailed break down of costs and fees as follows:
- Staffing billing rate plus overheads;
- Travel and accommodation;
- Report reproduction; and
- ____________________
Both the sealed envelopes should again be placed in a sealed cover which will be
received in the office of Chief Engineer, Mughal Road Project, Sector-2 Channi Himmat,
Jammu up to 1500 hours on 15-05-2010.
5.2 Opening of proposalThe proposals (first envelope containing technical proposal only) will be opened in
the office of Chief Engineer, Mughal Road Project, Sector-2 Channi Himmat, Jammu1530 hours on 15-05-2010. It may please be noted that the second envelope containing
the detailed price offer will not be opened until technical evaluation has been
completed and the result of comparative statement notified to all eligible consultants.
6. Evaluation
6.1 A two-stage procedure will be adopted in evaluating the proposals: i) a technical
evaluation, which will be carried out prior to opening any financial proposal;
-
8/9/2019 TOR Avalanche
3/22
ii) a financial evaluation.
6.2 Technical Proposal:
The evaluation committee will carry out detailed evaluation of the technical proposals
in order to determine whether consultants are qualified and whether technical
proposals submitted as per Annexure-2 (Supplementary Information to Consultants)
are substantially responsive.
In addition, Curriculum vitae of senior personnel in each discipline for assessing the
qualifications and experience of the personnel proposed to be deployed for the studies
should be included with the technical proposal (in the format of the sample curriculum
vitae as per Form-5).
The price envelopes of others will not be considered and returned unopened after
completing the selection process. The client shall notify the consultants, results of the
technical evaluation and invite those who qualify for opening of the financial proposals
indicating the date and time.
6.3 Financial Proposal:
6.3.1 Opening:
The financial proposal shall be opened in the presence of the consultants representatives
who choose to attend. The name of the consultant, and the proposed prices shall be read
out and recorded.
6.3.2 Evaluation:
The evaluation committee will determine if the financial proposals are complete and
without computational errors. The consultant who has submitted lowest financial
proposal will be invited for negotiations.
7. Negotiations
7.1 Prior to the expiration period of proposal validity, the Client will notify the successful
Consultant in writing by registered letter, cable telex or facsimile and invite himnegotiate the Contract.
7.2 The aim of negotiation is to reach agreement on all points, and initial a draft contract by
the conclusion of Negotiations.
7.3 Negotiations will commence with a discussion of your technical proposal, the proposed
methodology (work plan), staffing and any suggestions you may have made to improve
the TOR. Agreement must then be reached on the final TOR, the staffing and staff
-
8/9/2019 TOR Avalanche
4/22
months, logistics and reporting. Special attention will be paid to optimize the required
outputs from the Consultants and to define clearly the inputs required from the Client to
ensure satisfactory implementation of the Assignment.
7.4 Changes agreed upon will then be reflected in the draft contract, using proposed unit rates.
7.5 Having selected Consultants, among other things, on the basis of an evaluation of
proposed key professional staff, the Client expects to negotiate a contract on the basis
these staff named in the proposal and, prior to contract negotiations, will require
assurance that these staff will be actually available. The Client will not consider
substitutions during contract negotiations except in cases of unexpected delays in the
starting date or incapacity of key professional staff for reasons of health.
7.6 The negotiations will be concluded with a review of the draft form of Contract. The Client
and the Consultants will finalize the contract to conclude negotiations.
7.7 The Contract will be awarded after successful negotiations, with the selected
Consultant. If negotiations fail, the Client will invite the Consultants having submitted
the second lowest financial offer to Contract negotiations. Upon successful completion,
the Client will promptly inform the other Consultants that their proposals have not
been selected.
8. The Mughal Road Organization does not bind itself in any way to select the firm
offering the lowest price.
9. It is estimated that about 10 weeks of services will be required for the as s i gnm en t
and generally you should base your financial proposal accordingly.
10. You are requested to hold your proposal valid for 90 days from the last date of
submission without change the personnel proposed for the assignment and your proposed
price. The Mughal Road Organization will make its best efforts to select a consultant
firm within this period.
11. Please note that the cost of preparing a proposal and of negotiating a contract including
visits to Jammu and other places, if any is not reimbursable.
12. Assuming that the contract can be satisfactorily concluded in 10 weeks, you will be
expected to take- up/commence with the assignment in June 2010.
13. We wish to remind you that any manufacturing or construction firm, with which you
might be associated with, will not be eligible to participate in bidding for any goods or
works resulting from or associated with the project of which this consulting assignment
-
8/9/2019 TOR Avalanche
5/22
forms a part.
14. Please note that the remuneration which you receive from the contract will be subject to
normal tax liability in J&K(India). Kindly contact the concerned tax authorities for further
information in this regard if required.
Yours faithfully,
Sd/-
Chief Engineer
Mughal Road Project,
Sector-2, Channi Himmat,
JammuEnclosures:
1. Terms of Reference.
2. Supplementary Information to Consultants.
3. Draft contract under which service will be performed.
-
8/9/2019 TOR Avalanche
6/22
Annexure - 1
TERMS OF REFERENCE FOR
PREPARATION OF DPR FOR AVALANCHE CONTROL
STRUCTURES ON MUGHAL ROAD IN JAMMU AND KASHMIR
1. Background and Importance:The Jammu and Kashmir divisions of J&K state are separated by Pir Panjal Ranges and are
presently connected by the circuitous Jammu-Srinagar National Highway No.1A (NH-1A).In
order to provide a direct link between the districts of Poonch and Rajouri in Jammu Division with
Kashmir valley, a pressing need was felt to construct a road in the missing link between Bafliaz
(Poonch district, Jammu)and Shopian district (Kashmir).The road is under execution from March
2006.
The ancient route Mughal Road, when developed, will help in overall development of
the area and mitigate the hardships of People of Poonch & Rajouri.
It will considerably reduce the travel distances between Poonch and Rajouri Districts
with Srinagar. As against distances of 540Kms and 455Kms between Poonch & Rajouri
District respectively with Srinagar via Jammu and NHIA, the distance along Mughal road
between Srinagar with Poonch and Rajouri Districts shall be only 175Kms and 200Kms
respectively.
The Historical background of the proposed road and the beautiful meadows at Pir Panjal
is expected to attract a large number of tourists, thereby boosting economy of the people.
Besides the road will benefit the pilgrims from Kashmir Valley who visit the famous shrine of
Baba Gulam Shah Badshah at Rajouri.
The National Highway between Jammu & Srinagar (NH-1A) is under tremendous
pressure with the increase in traffic. The road passes through steep mountainous terrain which
are prone to landslides, rock falls and geological failures. As a result the road remains closedfor days together not only in winter, but also in summer during rainy season. The two-lane
road between Bafliaz and Shopian, cutting across the Pir-Panjal mountains, will provide
substantial traffic relief to NH-1A by diverting traffic of Rajouri and Ponch districts to this
new road heading for valley and hence shall serve as an alternate seasonal road (April-
November) connecting Kashmir valley with rest of the country.
-
8/9/2019 TOR Avalanche
7/22
The proposed road will promote economic, industrial, social and cultural development
of the project influence area. It will help in raising living standards of the people,
advancement of the community, improvement in medical, educational, post & telegraph and
recreational facility. Employment potential in the area will be generated to a large extent.
The proposed road will give a boost to the agricultural, industrial, building and
commercial activities in the project influence area, which will create opportunities for
economic uplift of the people. With the opening of this area to communications, the land value
will go up. Farmers will get motorable access to the markets for selling their produce and this
will give impetus to the agricultural production in this area.
With the adoption of higher standards of proposed road, there will be reduction in the
vehicle operating costs, fuel consumption, wear& tear of tyres, saving in time of passengers
and vehicles and faster mobility of essential services. The fatigue and discomfort during travel
will also be considerably reduced.
2. Salient Features of Mughal Road:-
(i) Original and Destination Bafliaz (Poonch in Jammu
Province) and Shopian
(Kashmir Province)
(ii) Location
Longitude 72
0
22
/
to 74
0
50
/
(East)Latitude 33
037
/to 33
043
/(North)
(iii) Length of road 84 Km double lane
(iv) Altitude of obligatory pointBafliaz (Ch: 0) 1650 Mtr (5412 Feet)
Pir Ki Gali (Ch: 43) 3494 Mtr (11460 Feet)
Shopian (Ch: 84) 2048 Mtr (6717 Feet)
(v) Total Project Cost Rs. 639.85 Crores(vi) Executing Agency M/S HCC Ltd. Mumbai(vii) Date of Start March 2006(viii) Date of completion March 2011
3. Cost Provision in DPR
The inbuilt provision in DPR of Mughal Road for construction of Avalanche Control
Structures along the alignment of the road has been kept to the tune ofRs 18.52 Crores.
-
8/9/2019 TOR Avalanche
8/22
4. Objective:
The objective is to prepare a comprehensive DPR for Avalanche Control structures for
Mughal Road based on requisite survey, detailed investigations and rigorous
design/detailing of such structures along with detailed estimates and BOQ for the work
which should ultimately pave way for construction of such structures along the alignment
at vulnerable spots.
5. Framing the DPR
Worthwhile to mention that the consultant has to do phasing in his work and accordingly
frame the DPR which shall consist of two volumes:
Vol I: Shall incorporate the details of Avalanche Control Structures upto the altitude of
10,000 ft
Vol II: Shall incorporate the details of Avalanche Control Structures upto the altitude
of above 10,000 ft
6. Scope of Work:
The scope of the work covers but not limited to the following:
a) Shall do the requisite ground survey, identify spots and stretches vulnerable to snow
drifts/blizzards and avalanches along the alignment of Mughal Road.
b) Shall conduct necessary investigations as may be required for effecting suitablestructures in place in order to mitigate the hazards of avalanches
c) Shall suggest as to whether adequate provision has been kept in DPR of Mughal Road
for Avalanche Control Structures.
d) Shall study various alternatives and recommend most feasible type of Avalanche
Control Structures that can be constructed keeping in view their suitability, safety,
economy so that road can be declared all safe throughout winter months.
(e) Shall carry out detailed structural design considering all likely forces and prepare
adequate drawings for constructing such structures along with detailed estimates
and BOQ.
(f) Shall prepare the Preliminary Feasibility as well as Detailed Project Report for the
entire work for submission to the Mughal Road Organisation.
(g) Shall prepare the bidding documents so that Mughal Road Organization can tender
the work in lieu with DPR submitted by the consultant.
-
8/9/2019 TOR Avalanche
9/22
(h) Shall tie up with Snow Avalanche Study Establishnment (SASE) of Defence
Research Development Organisation (DRDO) to incorporate their valuable inputs in
the DPR to be framed for the work.
7. Schedule of Completion of Tasks:
The entire tasks shall be completed within 10 weeks from the date of award of Contract.
8. Terms of Payment:
The mode of payments to be made in consideration of the work to be performed by the
consultants shall be as follows:
(i) 20% of contract value On submission of the Preliminar Feasibilit Re ort
(ii) 40% of contract value On submission of the Draft Detailed Project Report
(iii) 20% of contract value On submission of the Detailed Pro ect Re ort
(iii) 20% of contract value In Conjuction with Para 11 of TOR.
9. Data, Services and facilities to be provided by the Mughal Road Organisation:
The required extract of DPR and RITES Feasibility Report of Mughal Road pertaining to
Avalanches will be made available to the consultant.
10. Performance Security
Within 21 Days of letter of acceptance, the consultant shall deliver to the client a performance
security in the form of bank guarantee for an amount equivalent to 5% of the contract price. The
bank guarantee will be released at the time of final payment to the consultant.
-
8/9/2019 TOR Avalanche
10/22
11. Responsibility for accuracy of Project Reports
The consultants shall be responsible for accuracy of all data used in the project preparation and
estimates prepared by him as a part of the project. He shall indemnify the client against any
inaccuracies in the work. For this purpose, he shall furnish bank guarantee for an amount to the
extent of 20% of total consultancy fees to be received by him. The bank guarantee shall be valid
for a period of 2 years from the date of submission of DPR.The final installment of 20% shall be
released only on receipt of this bank guarantee.
12. List of key professional* positions whose CV and experience would be evaluated:
STRUCTURAL ENGINEER:
The position required as engineer, with Masters Degree or equivalent in structural
engineering, with minimum 10 years experience. The candidate must be well versant with RCC
design and should have handled projects in high altitude areas subjected to snow effects, high
velocity winds. The candidate must have the experience of planning and monitoring geo-technical
and other investigations for such structures and interpreting the findings thereof. He will also act
as Coordinator cum Team leader.
HIGHWAY ENGINEER:
The Engineer will be a post graduate in highway engineering with at least 6 years of
professional highway engineering experience of handling project preparation and construction of
hill roads. He should have handled geometric design of such roads including alignment fixation
etc. Must have in-depth knowledge of IRC/relevant Codes.
GEOLOGIST CUM GEO TECHNICAL ENGINEER:
This position requires an Engineer who should be post graduate in Geotechnical
Engineering/Rock Mechanics or Ph. D in Geology with 6 years of experience in road projects
especially hill roads. The candidate should capable of handling in sub-soil investigations, doing
soil classification studies, studying geologically unstable road stretches, fault studies etc.
HYDROLOGIST CUM DRAINAGE ENGINEER:
The candidate should be post graduate/graduate or equivalent with minimum 6 years
experience of which at least 3 years should be on snow hydrology. Experience with the acceptable
-
8/9/2019 TOR Avalanche
11/22
study methods, including the physics of snow, ice and glaciers.
ESTIMATE SURVEYOR:
He should be a graduate in Civil Engineering/Diploma in Quality Surveying from a
recognized University/Institution. Graduate in Civil Engineering with at least 6 years work
experience or Diploma in Civil Engineering with at least 8 years work experience at responsible
position will also be acceptable. He should have expertise in quantity surveying, BOQ
preparation, tender documentation etc. He should be conversant with the use of computer software
for commuting unit rates, quantities and costs.
FIELD SURVEYOR:
He should be a graduate in Civil Engineering/Diploma in Quality Surveying from a
recognized University/Institution. Graduate in Civil Engineering with at least 6 years work
experience or Diploma in Civil Engineering with at least 8 years work experience at responsible
position will also be acceptable. He should have expertise in carrying out field survey with total
station and other equipments, interpreting survey data including necessary plotting. should have
knowledge of Auto CAD.
* Key professionals shall not be ex-staff of Mughal Road Organization, PW(R&B)
Department J&K.
-
8/9/2019 TOR Avalanche
12/22
Annexure - 2
SUPPLEMENTARY INFORMATION FOR CONSULTANTS
Proposals
(1) Proposals should include the following information:
(a) Technical Proposal
(i) A brief description of the firm/organization and an outline of recent experience on
assignments/projects of same nature executed during the last 5 years in the formatgiven in Form F-2.
(ii) Any comments or suggestions of the consultant on the Terms of Reference (TOR).
(iii) A description of the manner in which consultants would plan to execute the
work. Work plan time schedule in Form F-3 and approach or methodology
proposed for carrying out the required work.
(iv) The composition of the team of personnel which the consultant would propose to
provide and the tasks which would be assigned to each team member in Form F-4.
(v) Curricula Vitae of the individual key staff members to be assigned to the work
and of the team leader who would be responsible for supervision of the team.
The curricula vitae should follow the attached Format (F-5) duly signed by the
concerned personnel.
(vi) The consultant's comments, if any, on the data, services and facilities to be
provided by Mughal Road Organization indicated in the Terms of Reference
(TOR).
-
8/9/2019 TOR Avalanche
13/22
(b) Financial Proposals
The financial proposals should include the following:
(i) Schedule of Price Bid in Form No.F-6 with cost break-up.
(2) The proposals should be submitted to Chief Engineer, Mughal Road Project, Sector-2
Channi Himmat, Jammu.
(3) Terms of Payment
The mode of payments to be made in consideration of the work to be performed by the
consultant shall be as follows:
(i) 20% of contract value On submission of the Preliminar Feasibilit Re ort
(ii) 40% of contract value On submission of the Draft Detailed Project Report
(iii) 20% of contract value On submission of the Detailed Pro ect Re ort
(iii) 20% of contract value In conjuction with para 11 of TOR.
Note: All payments shall be made on submission of pre-receipted bills by the consultants
in duplicate for respective stages.
-
8/9/2019 TOR Avalanche
14/22
FORM F-1
From To
Chief Engineer
Mughal Road Project
Sector-2, Channi Himmat
Sir,
Subject: -Preparation of DPR for Avalanche Control structures on Mughal Road in J&K
I/We consultant/consultancy firm/organization herewith enclose
Technical and Financial Proposal for selection of my/our firm as consultant for Preparation of
DPR for Avalanche Control structures on Mughal Road in J&K
Yours faithfully,
Signature:
Full name
and address:
Signature of(Authorized Representative)
-
8/9/2019 TOR Avalanche
15/22
FORM F-2
ASSIGNMENTS OF SIMILAR NATURE SUCCESSFULLY COMPLETED DURINGLAST 5 YEARS
1. Brief Description of the Firm/Organization:
2. Outline of recent experience on assignments of similar nature:
I II III IV V VI VII VIII
Sl.No. Name of Name of Owner or Cost of Date of Date of Wasassign- project sponsoring assign- commenceme
completio
assign-ment authority ment ment
satisfac-torilycomplet
Note: Please attach certificates from the employer by way of documentary proof. (Issued by
the Officer of rank not below the rank of Superintending Engineer or equivalent.)
-
8/9/2019 TOR Avalanche
16/22
FORM F-3
WORK PLAN TIME SCHEDULE
A. Field Study/ Survey/Investigations
Sl. Item Week wise Program
No. 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
B. Compilation and submission of reports supplemented with necessary documents/drawings
*
1. Feasibilty Report } As indicated under TOR}
2. Draft Final Report
3. Final Report
C. A short note on the line of approach and methodology outlining various steps for
performing the study.
D. Comments or suggestions on "Terms of Reference."
* Note: Soft Copies ( 3 CD Roms) and Hard Copies (5 sets )
-
8/9/2019 TOR Avalanche
17/22
FORM NO.F-4
Composition of the Team Personnel and the task which would be
assigned to each Team Member
1. Technical/Managerial Staff
Sl.No. Name Position Task assignment
2. Support Staff
Sl.No. Name Position Task assignment
-
8/9/2019 TOR Avalanche
18/22
FORM F-5
SUGGESTED FORMAT OF CURRICULUM VITAE
FOR MEMBERS OF CONSULTANT'S TEAM
1. Name:
2. Profession/
Present Designation:
3. Years with Firm/Organization: Nationality:
4. Area of Specialization:
5. Proposed Position on Team:
6. Key Qualifications:
(Under this heading, give outline of staff member's experience and training
most pertinent to assigned work on proposed team. Describe degree of
responsibility held by staff member on relevant previous assignments and
give dates and locations. Use up to half-a-page.)
7. Education:
(Under this heading, summarize college/university and other specialized
education of staff member, giving names of schools/colleges, etc., dates attended
and degrees obtained. Use up to a quarter page.)
8. Experience:
(Under this heading, list all positions held by staff member since graduation,
giving dates, names ofemploying organization, title of positions held and location
of assignments. For experience in last ten years, also give types of activities
performed and client references, where appropriate. Use up to three quarters of a
page.)
9. Languages:
(Indicate proficiency in speaking, reading and writing of each language by
'excellent', 'good' or'poor'.)
Signature of Staff Member Date:
Recent
Photograph
-
8/9/2019 TOR Avalanche
19/22
FORM NO.F-6
SCHEDULE OF PRICE BID
Items AmountIn figures In words
1. Consultancy Services forPreparation of DPR for AvalancheControl Structures on Mughal Road(With separate Cost break upappended herewith)
Signature of Consultant
(Authorized representative)
-
8/9/2019 TOR Avalanche
20/22
Consulting Services
Draft Letter of Contract/Agreement to be carried out by Consultants
(Name ofConsultant)
Subject: Preparation of DPR for Avalanche Control Structures
on Mughal Road in Jammu and Kashmir
1. Set out below are the terms and conditions under which (Name of Consultant) has agreed
to carry out for Chief Engineer, Mughal Road Project the above-mentioned assignment
specified in the attached Terms of Reference.
2. For administrative purposes Superintending Engineer, Mughal Road Project has been
assigned to administer the assignment and to provide [Name of Consultant] with all
relevant information needed to carry out the assignment. The services will be required in
Preparation of DPR for Avalanche Control Structures on Mughal Road for about ten
weeks.
3. The Chief Engineer, Mughal Road Project may find it necessary to postpone or cancelthe assignment and/or shorten or extend its duration. In such case, every effort will be
made to give you, as early as possible, notice of any changes. In the event of termination,
the (Name of Consultants) shall be paid for the services rendered for carrying out the
assignment to the date of termination, and the [Name of Consultant] will provide the
Chief Engineer, Mughal Road Project with any reports or parts thereof, or any other
information and documentation gathered under this Agreement prior to the date of
termination.
4. The services to be performed, the estimated time to be spent, and the reports to be
submitted will be in accordance with the attached Terms of Reference.
5. This Agreement, its meaning and interpretation and the relation between the parties
shall be governed by the laws of Union of India
6. This Agreement will become effective upon confirmation of this letter on behalf of
(Name of Consultant) and will terminate on expiry of the assignment, or such other date
as mutually agreed between the Chief Engineer, Mughal Road Project and the (Name of
Consultants).
7. Payments for the services provided by the consultant shall be as per details pointed out in
TOR.The remuneration to the consultant includes all the costs related to carrying out the
services, including overhead and any taxes imposed on [Name of Consultants.]
8. The [Name of Consultants] will be responsible for appropriate insurance coverage. Inthis regard, the [Name of Consultants] shall maintain workers compensation,
employment liability insurance for their staff on the assignment. The Consultants shall
also maintain comprehensive general liability insurance, including contractual liability
coverage adequate to cover the indemnity of obligation against all damages, costs, and
charges and expenses for injury to any person or damage to any property arising out of,
or in connection with, the services which result from the fault of the [Name of
Consultants] or its staff. The [Name of Consultants] shall provide the (Name of
Borrower) with certification thereof upon request.
-
8/9/2019 TOR Avalanche
21/22
9. The [Name of Consultants] shall indemnify and hold harmless the Chief Engineer,
Mughal Road Project against any and all claims, demands, and/or judgements of any
nature brought against the (Name of Borrower) arising out of the services by the
[Name of Consultants] under this Agreement. The obligation under this paragraph
shall survive the termination of this Agreement.
10. The Consultants agree that any manufacturing or construction firm with which they
might be associated with will not be eligible to participate in bidding for any goods or
works resulting from or associated with the project of which this consulting assignment
forms a part.
11. All final plans, drawings, specifications, designs, reports and other documents or
software submitted by the [Name of Consultants] in the performance of the Services
shall become and remain the property of the Client. The Consultants may retain a copy
of such documents but shall not use them for purposes unrelated to this Contract without
the prior written approval of the Client.
12. The Consultant undertake to carry out the assignment in accordance with the highest
standard of professional and ethical competence and integrity, having due regard to the
nature and purpose of the assignment, and to ensure that the staff assigned to perform the
services under this Agreement, will conduct themselves in a manner consistent herewith.
13. The consultant will not assign this Contract or sub-contract or any portion of it without
the Clients prior written consent.
14. The [Name of Consultants] shall pay the taxes, duties fee, levies and other impositions
levied under the Applicable law and the Client shall perform such duties, in regard to
the deduction of such tax, as may be lawfully imposed. No claim whatsoever shall beaccepted by the client in respect of taxes payable by the consultant
15. The [Name of Consultants] also agree that all knowledge and information not within the
public domain which may be acquired during the carrying out of this Agreement, shall
be, for all time and for all purpose, regarded as strictly confidential and held in
confidence, and shall not be directly or indirectly disclosed to any person whatsoever,
except with the Chief Engineer, Mughal Road Project written permission.
16. Any dispute arising out of the Contract, which cannot be amicably settled betweenthe parties, shall be referred to the Superintending Engineer, Mughal Road Project,
the sole arbitrator.
Place:
Date ...................................................................(Signature of Authorized Representative
.......................................... ....................................... on behalf of Consultant)
.......................................... .......................................
.......................................... ..........................(Signature & Name of the Client's
Representative)
-