Transcript
Page 1: TOPOGRAPHICAL & MEASURED BUILDING SURVEYS

©Land Survey Solutions Limited 01/01/2010Original Sheet Size A1H

[email protected]

Ipswich Coventry Yeovil Norwich Perth Nottingham Brentwood

LAND SURVEYING BUILDING SURVEYING UNDERGROUND SURVEYING

REVDESCRIPTION DRAWN

APPRDATE

EASTINGSSTATIONS LEVELNORTHINGS DESCRIPTION

PROJECT TITLE

DRAWING DETAIL

CLIENT

SURVEYOR SURVEY DATE APPROVED BYCHECKED BY

DRAWING NUMBER

REVISION

DWG STATUS

ISSUE DATE

SCALE

Chestnut Paling Fence

Chain Link Fence

Barbed Wire Fence

Close Board Fence

C/L

C/P

B/W

C/B

EP+TransformerET

Floor Board DirectionFBD

DH Door Head Height

Air Valve

Bollard

Belisha Beacon

Bed Level

Bore Hole

Arch Head Height

Bush

Ceiling Level

Box (Utilities)

Bus Stop

Brace Post

Column

Cover Level

Cill Height

Drainage Channel

Drain

Eaves Level

Electric Pole

Earth Rod

Down Pipe

AV

BL

BB

BH

BO

AH

BX

BU

BS

BrP

CH

CL

Col

DC

ER

EL

DR

EP

DP

C-Lev

FH Fire Hydrant

Cable RiserCR

Assumed RouteAR

Flower BedFB

Post & Rail Fence

Panel Fence

Iron Railings

Pan

P/R

I/R

Post & Wire FenceP/W

Overhead Line (approx)OHL

Foul WaterFW

Gas Valve

Flag Pole

Manhole

Lamp Post

Marker Post

Head Height

Kerb Outlet

Invert Level

Gully Grate

Floor Level

Inspection Cover

Road Sign

Partition Wall

Ridge Level

Rodding Eye

Parking Meter

Reflector Post

Roller Shutter Door

Name Board

Floor Board DirectionFBD

FL

IC

FP

GG

GV

HH

LP

MH

MP

KO

IL

Post

P/Wall

PM

RE

PO

RS

RSD

RP

RL

NB

FH Fire Hydrant

PB Post Box

ABBREVIATIONS & SYMBOLS

TOPOGRAPHICAL & MEASURED BUILDING SURVEYS

SURVEY CONTROL CO-ORDINATES

Surface WaterSW

Floor to Ceiling HeightX.XX

Floor to False Ceiling HtX.XX F/C

Survey Control Station

Sign Post

Rolled Steel Joist

Arch Spring Point Height

SI

SP

RSJ

Stop ValveSV

Stay

Trial Pit

Telecom Cover

Threshold Level

Tactile Paving

Universal Beam

Cable TV Cover

Telegraph Pole

Top of Wall

Traffic Light

TH

THL

SY

Tac

TC

UB

TP

TV

ToW

TL

Vent Pipe

Under Side Beam

Unable To Lift

Unknown Tree

Wash Out

Water Meter

Weep Hole

Water Level

Waste Bin

UK

VP

USB

UTL

WM

WO

WH

WL

WB

Unknown CoverUC

Tel No: 0845 0405 969 Fax No: 0845 0405 970

DRAWING NOTE

Topographical Surveys

Trees are drawn to scale showing the average canopy spread. Descriptions and

heights should be used as a guide only.

All building names, descriptions, number of storeys, construction type including

roof line details are indicative only and taken externally from ground level.

All below ground details including drainage, voids and services have been

identified from above ground and therefore all details relating to these features

including; sizes, depth, description etc will be approximate only. All critical

dimensions and connections should be checked and verified prior to starting

work.

Detail, services and features may not have been surveyed if obstructed or not

reasonably visible at the time of the survey.

Measured Building Surveys

Measurements to internal walls are taken to the wall finishes at approx 1m

above the floor level and the wall assumed to be vertical.

Cill heights are measured as floor to the cill and head heights are measured

from cill to the top of window.

General

The contractor must check and verify all site and building dimensions, levels,

utilities and drainage details and connections prior to commencing work. Any

errors or discrepancies must be notified to Survey Solutions immediately.

The accuracy of the digital data is the same as the plotting scale implies. All

dimensions are in metres unless otherwise stated.

The survey control listed is only to be used for topographical surveys at the

stated scale. All control must be checked and verified prior to use.

© Land Survey Solutions Limited holds the copyright to all the information

contained within this document and their written consent must be obtained

before copying or using the data other than for the purpose it was originally

supplied.

Do not scale from this drawing.

DONCASTER ROAD, BARNSLEY

ARDSLEY HALL HOTEL,

Sheet 1 of 2

TOPOGRAPHICAL SURVEY

SOMERSTON CAPITAL

DAP 18/09/2014 PDSPDS

14822cv-01

FINAL

22/09/2014

1:200

S801

93.179

405503.383438336.398

438213.984

S802

S501

405534.065S111

405502.131

405515.747

438271.578

438285.972

438272.079

93.169

93.968

405619.303

ST03

90.731

87.737

438344.901

ST02

94.498

438289.285

438274.097

94.638

ST01

94.305

92.284

91.683405467.353438319.409

405556.186

438322.602

405593.276

405515.043ST05

ST07

ST04 405542.986 94.020

ST06

438268.013

93.495

405492.050

438282.692

92.651

405483.963

ST08

438251.233

94.157

438227.317

405552.929

405504.069ST09

438247.214

93.867ST10 405513.230

ST11

ST13

ST12

405533.951

94.289405534.384

438227.853

438249.513 93.531

Peg

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

Hilti Nail

The grid is orientated to Grid North with Scale Factor=1.0000.

1. Ordnance Survey National Grid Coordinates have been established

for ST03 using GPS and related to OSTN02(GB) and OSGM02(GB).

2. All levels relate to the Ordnance Survey datum for Control Station

ST03 established with GPS using OSGM02(GB).

NO

RT

H

Indicative

Top Related