![Page 1: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/1.jpg)
Th
yssen
Kru
pp
Permanent Bridges
Elevated steel constructions andStadium roofs
System Bridges(auxiliary bridges)
Architectural buildings,Turn-key constructions,Shopping-Centers,Central-Stations
Our Production range
Hydraulic steel structures and conveyor systems
![Page 2: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/2.jpg)
Th
yssen
Kru
pp
Linking continents - by train across the Suez Canal The El-Ferdan Bridge, the largest swing bridge in the world
Longest swing bridge in the world
Breaking span 340 m
Swinging weight 13,200 tons
Opening November 2001
![Page 3: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/3.jpg)
Th
yssen
Kru
pp
River railway bridges
Technical Data bridge over the river Rhine
Length: 274 mSpan length: 3 x 91.30 mHeigth: 20.00 mSteel construction: 2,650 tonsConstruction time: 23 months
Technical Data bridge over the river Elbe
Length: 240 mSpan length:66.9/105.8/66.9 m Heigth: 17.75 mSteel construction: 2,700 tonsConstruction time: 8 months
![Page 4: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/4.jpg)
Th
yssen
Kru
pp
River road bridgesOver the Askerø-Fjord, Sweden and the river Saale by Beesedau
Technical Data Askerø-Fjord, Sweden
Length steel bridge: 386 mPylon height:: 100 mSteel construction: 2,191 tonsRopes: 313 tonsConstruction time: 8 months
Technical Data bridge across the river Saale
Length steel bridge: 311 mWidth of arch: 180 mHeight of arch: 38 mSteel construction: 4,400 tonsConstruction time: 31 months
![Page 5: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/5.jpg)
Th
yssen
Kru
pp
The Transrapid – Project in Shanghai We manufactured and supplied points and actuators for the line between Pudong Airport and the Centre of Shanghai.
![Page 6: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/6.jpg)
Th
yssen
Kru
pp
The Transrapid – Project in Shanghai
![Page 7: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/7.jpg)
Th
yssen
Kru
pp
The Transrapid – Project in Shanghai We manufactured and supplied eight switches for the line between Pudong airport and the Shanghai city centre
![Page 8: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/8.jpg)
Th
yssen
Kru
pp
Messe Hannover Conference CenterAn internationally significant steel construction „made in Hannover“
Technical Data
Steel construction: 4,500 tonsTotal length steel construction: 170 mConstruction time: 13 monthsEuropean Steel Construction Award 1991
![Page 9: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/9.jpg)
Th
yssen
Kru
pp
Messe Hannover Exhibition hall 8/9A new dimension in exhibition hall construction
Exhibition Hall 8/9, Hannover
Length: 238 mWidth: 135 mCovered area: 32,000 m²Steel construction: 2,400 tonsConstruction time: 12 months
Exhibition Hall 6, Düsseldorf
Dimensions: 165 m x 165 mPrimary framework: 1,500 tonsSpace frame + cable subsupport: 790 tonsConstruction time: 14 months
![Page 10: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/10.jpg)
Th
yssen
Kru
pp
The „AufSchalke“ Arena (Veltins-Arena)The most modern event centre in Europe
Technical data roof construction
Free span area: 226 m x 186 mWeight fixed roof construction: 3,500 tonsWeight moving roof panel: 560 tonsConstruction time: 10 months
![Page 11: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/11.jpg)
Th
yssen
Kru
pp
The new Soccer Worldcup Stadium for Hannover
Modernization of existing Arena for 2006 World Cup
Capacity: 50,000 spectatorsNew roof with trapezoidal steel and membrane constructionOrder: September 2002Completion: September 2004
![Page 12: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/12.jpg)
Th
yssen
Kru
pp
Volkswagen AutoStadt - Vehicle towersMultistorey parking platforms
Technical Data
Heigth: 50 mDiameter: 28 mCars to be stored: 400 each towerGlass area: 8,800 m²Walled-in space: 99,300 m³Construction time: 18 months
![Page 13: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/13.jpg)
Th
yssen
Kru
pp
Materials handling and systems -1 For more than 30 years we have been a relaible and competent partner in the field of internal stock goods handling.
![Page 14: ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,](https://reader035.vdocuments.site/reader035/viewer/2022062802/56649ee45503460f94bf3928/html5/thumbnails/14.jpg)
Th
yssen
Kru
pp
Materials handling and systems -2 Power + Free conveyors – sort, collect, store and distribute with one system.