THE PHILIPPINE PPP PROGRAM
Public-Private Partnership Center of the Philippines
Atty. Sherry Ann N. Austria Philippine Investment Seminar & PPP Roundtable Conference Seoul, Korea
Government of the Republic of the Philippines
Outline of Presentation
Public-Private Partnership of the Philippines
The Philippine PPP Agenda
1
Government Support for PPPs
2
PPP Achievements
3 PPP Roadmap: Thrusts & Priorities 2012
4
Pipeline of PPP Projects
5
Public-Private Partnership of the Philippines
The Philippine PPP Agenda
Social Contract with the Filipino People
Roles of the Private Sector:
All transactions are transparent & above board
Consultative view on private sector areas of concern
Protection of public interest
Indispensable role – “private sector as partner in development”
Efficiency gains – that may be too costly for the State
Accelerated provision of public services
Public-Private Partnership of the Philippines
The Philippine PPP Agenda
The PPP Center as the main facilitator of PPP Program
Promotes the PPP approach to implementing agencies & LGUs;
Facilitates development of PPP projects (national & local level);
Initiates & advocates policy reforms; and
Monitors PPP implementation
Right of way acquisition & related costs (including resettlement) Costs of designing, building & otherwise delivering any part of the project
STRATEGIC SUPPORT FUND (SSF)
Public-Private Partnership of the Philippines
Government Support for PPPs
PROJECT DEVELOPMENT AND MONITORING FACILITY (PDMF)
IDCA Panel of Firms 1. CPCS Transcom Ltd. 6. Manabat Sanagustin & Co., CPAs
2. Deloitte Touche Tohmatsu India Pvt. Ltd 7. PricewaterhouseCoopers Services LLP Singapore
3. Ernst & Young Australia Infrastructure Advisory 8. Rebel Group International BV
4. Hill International SA 9. SMEC International Pty Ltd. (SMEC), Australia
5. ICRA Management Consulting Services Ltd
Public-Private Partnership of the Philippines
Government Support for PPPs
Other Financing Avenues for PPP
Philippine Infrastructure Development Fund (PIDF)
GFIs pooled funds (GSIS, SSS, DBP, LBP)
Private Equity Fund Multilateral and government financial institutions
Local Banking Institutions
1.3 trillion pesos cash in special deposit accounts
Public-Private Partnership of the Philippines
PPP Achievements
• Institutional Strengthening of the PPP Center • Capacity Building of PPP Center Personnel
ORGANIZATIONAL DEVELOPMENT
• Proposed amendments to the BOT Law and its implementing rules and regulations • Reviewed and streamlined processes in evaluation and approval of projects • Guidelines on inter-agency coordination and involvement were established
ENHANCED LEGAL AND REGULATORY FRAMEWORKS AND PPP PROCESSES
• Capacitated more or less 200 IAs and LGUs in PPP project preparation in less than a year
• Successful launch of the LGU PPP Manual Vols. 1-3; training roll-out ongoing
PPP-ENABLED IMPLEMENTING AGENCIES & LGUS
Public-Private Partnership of the Philippines
PPP Achievements
• Dialogues and consultative meetings with foreign and local private investors, banks, development partners, foreign trade missions, and other stakeholders
CONSULTATIVE AND SYSTEMATIZED PARTNERSHIPS
• 12 PPP projects approved for PDMF support
• Successful tender of DPWH’s Daang Hari-SLEX Link Road project; ongoing bidding for DepEd’s PPP for School Infrastructure Project
PIPELINE BUILD-UP AND ROLLOUT OF PROPERLY PREPARED PROJECTS
Public-Private Partnership of the Philippines
PPP Roadmap: Thrusts & Priorities 2012
PPP Pipeline Build-up Creation of the PPP Knowledge Portal
Capacity Building for IAs and LGUs
Legal and Policy Enhancements
Contract & Performance Management
Public-Private Partnership of the Philippines
Pipeline of PPP Projects (Sectoral Distribution)
Transportation Road Network Water Health Agriculture Education
LRT Line 1 South Extension
LRT Line 1 South Extension
Project Brief
• Provision of 11.7 kilometer extension to the existing 20.6 kilometer LRT Line 1 system from its present terminus at Baclaran station to Bacoor, Cavite;
• Additional 8 new stations and 2 future stations (10.5 km- elev., and 1.2 km- at grade)
Implementing Agency Project Cost
Department of Transportation and Communications (DOTC)
P 59.20 B
Mode of Implementation Scheme
Solicited TBD
Sector Location
Transport Metro Manila (NCR)
LRT Line 2 East Extension and Operation and Maintenance
LRT Line 2 East Extension and Operation and Maintenance Privatization
Project Brief
Extension of the existing LRT Line 2 by 4 km from Santolan, Pasig to Masinag, Antipolo; Existing 13.8 km Line 2 runs along Recto Station in Manila to Santolan Station in Pasig, along Recto Avenue, Magsaysay Boulevard and Marcos Highway.
Implementing Agency Project Cost
Department of Transportation and Communications (DOTC)
P 11.9 B
Mode of Implementation Scheme
Solicited TBD
Sector Location
Transport Metro Manila (NCR)
Operation and Maintenance of Laguindingan Airport
Operation and Maintenance of Laguindingan Airport
Project Brief
Involves the operation and maintenance of the newly constructed international-standard airport in Laguindingan, Misamis Oriental
Implementing Agency Project Cost
Department of Transportation and Communications (DOTC)
P1.80 B
Mode of Implementation Scheme
Solicited Build-Lease-Transfer (BLT)
Sector Location
Transport Misamis Oriental (R10)
New Bohol (Panglao) Airport Development
New Bohol (Panglao) Airport Development
Project Brief
Involves the construction of new international-standard airport to replace existing Tagbilaran Airport in a 230-hectare lot.
Implementing Agency Project Cost
Department of Transportation and Communications (DOTC)
P 8.0 B
Mode of Implementation Scheme
Solicited TBD
Sector Location
Transport Bohol (R7)
Mactan Cebu International Airport Passenger Terminal Building
Mactan Cebu International Airport Passenger Terminal Building
Project Brief
Involves the construction of a new world-class passenger terminal building in Mactan, Cebu International Airport with a capacity of about 8 million passengers/year.
Implementing Agency Project Cost
Department of Transportation and Communications (DOTC)
P 10.15 B
Mode of Implementation Scheme
Solicited TBD
Sector Location
Transport Cebu (R7)
O&M of Puerto Princesa Airport
O&M of Puerto Princesa Airport
Project Brief
Involves the privatization of O & M of the airport existing Puerto Princesa Airport. It will be upgraded or improved into an international gateway meeting standards of the International Civil Aviation Organization
Implementing Agency Project Cost
Department of Transportation and Communications (DOTC)
TBD
Mode of Implementation Scheme
Solicited Build-Lease-Transfer (BLT)
Sector Location
Transport Misamis Oriental (10)
Automatic Fare Collection System
Automatic Fare Collection System
Project Brief
Involves the decommissioning of old magnetic-based ticketing system and replacing it with contactless-based smart card technology on LRT Lines 1 and 2 and MRT 3, with the introduction of a centralized back office that will perform apportionment of revenues.
Implementing Agency Project Cost
Department of Transportation and Communications (DOTC)
P 1.8B
Mode of Implementation Scheme
Solicited TBD
Sector Location
Transport Metro Manila (NCR)
New Centennial Water Source Project
Integrated Transport System (ITS) Project
Project Brief
Involves the establishment of three (3) mass intermodal terminals at the outskirts of Metro Manila – one (1) in the north (of EDSA) serving passengers to and from northern Luzon, and two (2) in the south serving passengers to and from Laguna/Batangas side and those to and from the Cavite side. The terminals will connect passengers from the province to other urban transport systems – railway, city bus, taxi, PUV - serving inner Metro Manila.
Implementing Agency Project Cost
Department of Transportation and Communications (DOTC)
TBD
Mode of Implementation Scheme
Solicited TBD
Sector Location
Transport Metro Manila (NCR)
New Centennial Water Source Project
Integrated Transport System (ITS) Project
Cebu Bus Rapid Transit Demonstration Project
Cebu Bus Rapid Transit Demonstration Project
Project Brief
Involves the restructuring of the main urban transport corridor from Bulacao to Ayala in Cebu City. This includes a 16 km BRT route designed and built following international best practices and quality standards, two mixed traffic lanes per direction, integration of the drainage system installed along the restructured corridor and BRT terminals. Implementing Agency Project Cost
Department of Transportation and Communications (DOTC)
TBD
Mode of Implementation Scheme
Solicited TBD
Sector Location
Transport Cebu (R7)
NLEX-SLEX Connector Road
NLEX-SLEX Connector Road
Project Brief
Involves the construction of 13.4 km, 4-lane elevated expressway over Philippine National Railway (PNR) right of way from Caloocan City to Buendia, Makati City. The project will connect NLEX and SLEX to decongest traffic in Metro Manila.
Implementing Agency Project Cost
Department of Public Works and Highways (DPWH)
Php 20.181 B
Mode of Implementation Scheme
Unsolicited TBD
Sector Location
Transport Metro Manila (NCR)
NAIA Expressway Project Phase II
NAIA Expressway Project Phase II
Project Brief
Involves the construction of a 5.2 Km, 4-lane elevated toll road linking Skyway to the Manila-Cavite Coastal Expressway. It aims to improve the accessibility to the Ninoy Aquino International Airport.
Implementing Agency Project Cost
Department of Transportation and Communications (DOTC)
P 15.77 B
Mode of Implementation Scheme
Solicited TBD
Sector Location
Transport Metro Manila (NCR)
CALA Expressway (Cavite & Laguna Side)
CALA Expressway (Cavite & Laguna Side)
Project Brief
Involves the construction of 2 expressways: Cavite Side (27.5 km, 4-lane highway from the terminus of R-1 Expressway in Kawit, Cavite to Aguinaldo Highway at Silang, Cavite); Laguna Side (14.3 km, 4-lane at-grade expressway). The CALA Expressway will be connected to SLEX near Sta. Rosa, Laguna.
Implementing Agency Project Cost
Department of Public Works and Highways (DPWH)
P 19.69 B
Mode of Implementation Scheme
Solicited TBD
Sector Location
Transport Cavite & Laguna (R4-A)
New Centennial Water Source Project
Improvement/Rehabilitation of Quirino Highway
Project Brief
Involves the improvement/rehabilitation and operation and maintenance of Quirino Highway, a 93.45 km., 2-lane national road that traverses three (3) provinces, namely Quezon, Camarines Norte and Camarines Sur. It starts at the junction of the Pan-Philippine Highway in Tabugon, Sta. Elena, Camarines Norte and ends at the junction of the Pan-Philippine Highway in Sipocot, Camarines Sur.
Implementing Agency Project Cost
Department of Public Works and Highways (DPWH)
TBD
Mode of Implementation Scheme
Solicited TBD
Sector Location
Transport Regions IV-A and V
New Centennial Water Source Project
Improvement/Rehabilitation of Quirino Highway
New Centennial Water Source Project
New Centennial Water Supply Source Project
New Centennial Water Source Project
New Centennial Water Supply Source Project
Project Brief
Involves the construction of dam, water treatment plant and associated main pipeline to deliver water from the project location to Metro Manila.
Implementing Agency Project Cost
Metropolitan Waterworks and Sewerage System (MWSS)
P 25 B
Mode of Implementation Scheme
Solicited TBD
Sector Location
Water Bulacan, Rizal, Quezon
Operation & Maintenance of Angat Hydro-Electric Power Plant
Operation & Maintenance of Angat Hydro-Electric Power Plant
Project Brief
Involves the rehabilitation, O & M of the MWSS-owned auxiliary turbines 4 & 5 installed in Angat Hydro-Electric Power Plant.
Implementing Agency Project Cost
Metropolitan Waterworks and Sewerage System (MWSS)
P 1.6 B
Mode of Implementation Scheme
Solicited ROT
Sector Location
Power Bulacan (R3)
New Centennial Water Source Project
Balara Water Hub
New Centennial Water Source Project
Balara Water Hub
Project Brief
Involves the construction and operationalization of an international center for water excellence in the MWSS Balara Compound along Katipunan Avenue opposite UP Diliman Campus in Quezon City. The proposed 75-hectare modern hub is envisioned to showcase existing eco-efficient water technology and be developed as a mixed-style popular destination for education, sports, business, recreation.
Implementing Agency Project Cost
Metropolitan Waterworks and Sewerage System (MWSS)
P 20 B
Mode of Implementation Scheme
Solicited TBD
Sector Location
Water Metro Manila (NCR)
Vaccine Self-Sufficiency Project Phase-II
Vaccine Self-Sufficiency Project Phase-II
Project Brief
• Envisioned to accelerate progress in vaccine production in the Philippines, and ensure vaccine sufficiency in the country;
• Aims to reduce overall vaccine procurement costs of finished vaccines through pooling and filling of the following vaccines: Pentavalent(DPT-HepB-Hib, Diptheria, Pertussis, Tetanus-Hepatitis B and Hemphylus Influenza B), Tetanus Toxoid and Single HepB.
Implementing Agency Project Cost
Department of Health (DOH) P .45 B
Mode of Implementation Scheme
Solicited Build-Operate-Transfer (BOT)
Sector Location
Health Metro Manila (NCR)
Modernization of the Philippine Orthopedic Center
Modernization of the Philippine Orthopedic Center
Project Brief
Involves the construction and upgrade of hospital buildings and facilities, purchase and supply of modern hospital equipment, furniture and fixtures and installation of comprehensive hospital IT system that will link medical and administrative operations and other stakeholders.
Implementing Agency Project Cost
Department of Health (DOH) P 1.8B
Mode of Implementation Scheme
Solicited Build-Operate-Transfer (BOT)
Sector Location
Health Banawe St. and East Ave., Quezon City
Grains Central Project
Grains Central Project
Project Brief
The project will establish grains bulk handling systems with corn grains processing centers and transhipment stations in major corn producing areas and selected sea ports by upgrading and enhancing the existing operations in at least fifteen (15) corn postharvest processing and trading centers.
Implementing Agency Project Cost
Department of Agriculture (DA) P 1.25 B
Mode of Implementation Scheme
Solicited TBD
Sector Location
Agriculture Nationwide
Establishment of Cold Chain Systems Covering Strategic Areas in the Philippines
Establishment of Cold Chain Systems Covering Strategic Areas in the Philippines
Project Brief
Involves the construction and operationalization of Cold Chain Centers to be located in major production and consolidation areas of agri-fishery products. The Centers will be equipped with the required facilities and machineries for minimal processing of livestock, fisheries and high value crops.
Implementing Agency Project Cost
Department of Agriculture (DA) P 5.30 B
Mode of Implementation Scheme
Solicited TBD
Sector Location
Agriculture Nationwide
PPP for School Infrastructure Project (PSIP-I)
PPP for School Infrastructure Project (PSIP-I)
Project Brief
Involves the design, financing and construction of about 9,332 new classrooms within 2,528 new school buildings that will be built at 2,262 existing elementary and secondary school sites in Regions I, III and IV-A.
Implementing Agency Project Cost
Department of Education (DepEd) P 10.5 B
Mode of Implementation Scheme
Solicited Build-Lease-Transfer (BLT)
Sector Location
Education Regions I, III, and IV-A
PUBLIC-PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES NEDA COMPLEX, EDSA, DILIMAN
QUEZON CITY Contact Numbers:
(632) 929.8593, (632) 929.8594, (632) 929.8630 & (632) 929.9251 Website: ppp.gov.ph