Potential Benefits
� ‘Utility’ scale
�Major role to play in delivering carbon reduction
in line with Government targets
�Excellent wind resource (UK best in Europe)
�Massive growth industry –supply, services, jobs
benefits
Why Offshore
Wind?
![Page 3: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/3.jpg)
Challenges
•Costs & economics
•Weather and logistics (construction &
operations)
•Grid Connection
•Consents
![Page 4: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/4.jpg)
1 2
419
18
35
8
6
11
13 15
16
1217
21
14
7
9
Onshore
Offshore
Biomass
10
Scroby Sands
(60MW)
18 Onshore Wind
Projects (140MW)
20
Blyth
(4MW)
Steven’s
Croft
Biomass
(44MW)
22
Out
Newton
(9MW)
Round 1: UK Regional
Sites - Blyth
![Page 5: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/5.jpg)
Round 2: Humber Gateway –& Westernmost Rough– 240MW – Dong Energy
Round 2 ‘Greater Wash’ Zone
• 8 sites ~ 3.6 GW
• Up to 1000 turbines
• ~ £10Bn Capital investment
![Page 6: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/6.jpg)
Round 3 – in this RegionDogger Bank/Hornsea/Norfolk• Lead by the Crown
Estates
• Running to time
• Environmental starting
• Engineering packages
• Negotiating for turbines
• Real work 2014 to 2022
Information:
• www.forewind.co.uk
![Page 7: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/7.jpg)
Round 3 – Successful Tenderers
• Dogger – 9GW – Forewind (Statoil Statkraft
SSE, RWE)
• Hornsea – 4GW – Smartwind (Mainstream &
Siemens Prjts)
• Norfolk – 7GW – Scottish Power & Vattenfall
• Irish Sea – 4GW – Centrica
• Hastings – 0.6GW – E.On
• Firth Forth – 3GW – Sea Green (SSE & Flour)
• Bristol Channel – 1.5GW - RWE
1GW = 1000MW ~ £3bn investment
![Page 8: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/8.jpg)
Wind TurbinesIndicative
Sizes
Approx.
Turbine
Size
(MW)
Rotor
diameter
(meter)
Revolutio
ns per
minute
Speed of
rotation at
blade tip
(km/h)
3.6 107 5 to 13 100 to 262
5 125 6.9 to 12.1 163 to 285
7 150 3.5 to 10 100 to 285
![Page 9: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/9.jpg)
Turbine Dimensions
Sea Bed
Nacelle & Hub
Nacelle & Hub
Rotor Diameter
Minimum Hub Height
Air Draft
MHWS Sea Level
Parameter Size of turbine
3.6 MW 5 MW 7 MW
Indicative number of turbines 83 60 42
Rotor diameter (metres) 107 125 150
Minimum hub height at MHWS (metres) 76 85 97
Maximum tip height (metres) 120 140 164
Tower base diameter (metres) 4-5 5 5-6
Minimum air draft at MHWS (metres) 22 22 22
![Page 10: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/10.jpg)
Turbine Installation
Total weight – approx 570 tonnes for 3.6MW model
Rotor - 95 tonnes / Nacelle - 125 tonnes / Tower - 350 tonnes of steel
![Page 11: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/11.jpg)
Foundation Types
Scour protection
Skirt
Tower
Boat Landing
Intermediate Platform
Shaft
Internal J tubes
Work Platform
Central Column
Piles
Diagonal Braces
Sea Level
Sea Bed
Tower
Work Platform
Steel Monopile Concrete Gravity Base Tripod
![Page 12: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/12.jpg)
FoundationsSelection dependent on:-
� Type/size of wind turbine
� Access/maintenance
requirements
� Sea depth and tide
� Dynamic wind and wave
loading
� Scour and global seabed
movements
� Geological conditions
� Transportation and logistics
� Material and manufacturing
costs
� Installation limits with respect to
crane and piling capacities
![Page 13: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/13.jpg)
Cable Array33kV Wind farm array cable:
� 3 core sea armoured;
� Approx 60 km total length;
� 119 to 133 mm diameter.
Nominal 132kV Export Cable to shore:
� 3 core sea armoured;
� Approx 8 km x2 total length;
� Min 50m between cables;
� 190 to 280 mm diameter.
![Page 14: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/14.jpg)
Main Vessels
![Page 15: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/15.jpg)
Illustrative resource schedule –
Humber Offshore LogisticsDescription Number of barge
/ jackup rig /
installation
vessel
Approx total
vessel
movements to
site for 83
turbines
Turbines 3 27
Foundations 3 to 4 27
Scour 1 83
Offshore installation
platform
2 4
Array cables 2 10
Export cables 1 4
Total heavy vessel
movements to site
157
![Page 16: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/16.jpg)
Description Approx number of
support vessel
movements
Comments
Anchor handling and
towage
157 Based on one support vessel round trip
per heavy construction vessel round trip
Commissioning 249 Based on six visits per turbines transfer
vessel carrying two turbine crews per visit
Guard vessels / security 48 Based on one round trip per week over two
6 month periods
Crew transfer
installation platform
365 Based on one round trip per day over
two 6 month periods
Total support vessel
movements to site
819 Based over two seasons
Support Vessels
Illustrative resource schedule –
Humber Offshore Logistics
![Page 17: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/17.jpg)
‘OFTO’ Electricity
Transmission system275kv Tower Line
Cliff
Export Cables
Offshore wind farm
Offshore
Transformer(s)
Offshore Transmission System Operator
‘OFTO’National Grid
E.ON
£100m+ £700m+
![Page 18: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/18.jpg)
Offshore Substation� 2 medium to high voltage transformers;
� Auxiliary transformers and low voltage switchboards;
� Reactive compensation banks;
� Batteries;
� High voltage (132 kV / 220 kV) switchgear;
� Medium voltage (33 kV) switchboard;
� Diesel generator and tank;
� Accommodation & Workshop.
![Page 19: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/19.jpg)
Onshore Cables (indicative 132kV, 6
x 30km)
![Page 20: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/20.jpg)
Connection into Grid
Substation
![Page 21: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/21.jpg)
275kV Grid Substation
NG Compound
OFTO
Compound
![Page 22: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/22.jpg)
The Opportunities
• What Jobs will be Created?
![Page 23: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/23.jpg)
Supplier Services - pre
Consent work• e.g. Environmental Impact
Assessment
– Understand effects on
• Fishing, seabed life, birds
• Visual, radar, shipping
• Geophysics – vessels, geologists
• Met masts – engineering, fabrication
• Project Design – Management &
Engineering
![Page 24: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/24.jpg)
Contract Packages - Indicative
14 June 2010, E.ON, Page 24
1
E.ON
Main Contract
Post Consent: Humber Gateway Reqment:
![Page 25: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/25.jpg)
Illustration: Humber Gateway Requirements:
1. Vessel Charters e.g. Transport, Installation, Scour
protection, Survey, Guard Boats, Dive Support, Crew
Transfer
2. Foundation Design & Supply
3. Array Cable Procurement
4. Array Cable Installation including termination
5. OFTO
6. Wind Turbines
7. O&M Facility Design
8. O&M Facility Build & Fit Out
9. O&M Crew Boats
14 June 2010, E.ON, Page 25
VRW1
![Page 26: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/26.jpg)
Slide 25
VRW1 Tim, what would be useful is a rough % breakdown of the capex by each category - probable someone will ask this questionVaughan Weighill, 25/01/10
![Page 27: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/27.jpg)
1. Transformer, Switchgear & Electrical Component
Supply
2. Cable Supply (9km x 2 submarine cable, 30km x 6
onshore cables)
3. Other Supply – Ballast, Ducting
4. Civil works – access road, buildings, trenching,
drainage
5. Directional Drilling
6. Transport & Logistics
7. Electrical jointing & commissioning
8. Site Security
9. Facilities
14 June 2010, E.ON, Page 26
Illustration: Post Consent
(Humber Gateway Requirements):VRW2
![Page 28: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/28.jpg)
Slide 26
VRW2 Check with Dave MoseleyVaughan Weighill, 25/01/10
![Page 29: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/29.jpg)
Subcontract Examples
14 June 2010, E.ON, Page 27
![Page 30: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/30.jpg)
Ongoing O&M Requirements
•Component Repair & Replacement
•Local Engineering e.g. Fabrication
•Vessel Maintenance & Repair Facilities
•Facilities Management e.g. Cleaning,
Security, Building Repair
•Accommodation
•PPE Cleaning
•Statutory Inspections
14 June 2010, E.ON, Page 28
VRW3
![Page 31: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/31.jpg)
Slide 28
VRW3 Include OFTO system O&M elements alsoWhat about vessels, O&M technicians (OEM appointed), HV engineers etc..?Vaughan Weighill, 25/01/10
![Page 32: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/32.jpg)
Development Contracts•Environmental Surveys Offshore & Onshore
•Environmental Impact Assessment & Consent
Applications
•Geophysical Surveys
•Geotechnical Investigations
•Metocean Monitoring Equipment / Services
•Commercial Fisheries – FLO, Guard Boats
•Land agent & Legal Services
•Outline Engineering Design
•Local Public Relations
14 June 2010, E.ON, Page 29
![Page 33: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/33.jpg)
The Local Supply Market
![Page 34: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/34.jpg)
Whitby Harbour
Harbour Facilities
• Up to 3000 tonnes DWT
• IOA – 85 metres
• Beam 14 metres
• Draft 5 to 6.5 metres (subject to tide)
![Page 35: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/35.jpg)
Education Provision
Preparing the employees of the future
• Whitby Harbour at South Shields
• A. world class Marine Simulation Department containing two 360 degree full-mission bridges and 12 other integrated bridges.
• B. An integrated full-mission engine room and associated engine workstation rooms. The Department also houses an extensive VTS simulator system and fully equipped Navigation Aid Laboratory
![Page 36: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/36.jpg)
Education ProvisionPreparing the
employees of the
future
• 6th Form Colleges
• University of Hull
• Whitby and District
Fishing Industry
Training School
![Page 37: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/37.jpg)
Local Suppliers
• Skyclimber of Pickering
• designs, manufactures, installs and
maintains service lifts to allow quick, safe
and reliable access to the internal parts of
the wind turbine
![Page 38: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/38.jpg)
Parkol Marine• Parkol Marine in Whitby offers a dry dock for all boat building requirements.
• The Dry dock offers a 5m draught and can accommodate vessels up to 42 m in length with a 10.5m beam
• An on site lift can manoeuvre vessels of up to 450 tons
![Page 39: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/39.jpg)
Current Strategy• Raise Awareness:
– Liaison with Venn Management – a Yorkshire Forward Company (IA/JR)
– Attendance at Forewind Event and raising with industry(IA)
– Develop Logo (see below)
– Take stand at Renewables UK National event (NTaylor/Martin Willis)
– Establish Local Supplier Network (Whitby and Scarborough Off Shore Wind)
– Run Regional Stakeholder Event at Whitby Pavillion with National Speakers – 23 July 2010
– Create Brochure – Created, to go to print when appropriate advertising in place
– Place Newspaper articles (Yorkshire Post/SEN/National Media)
• Identify gaps in supply that need to be addressed– Professor Hardisty, University of Hull
– Visit to Grimsby Docks (currently involved with Phase 1)
• Maintain Information Supply– Create Website: www.whitbywind.co.uk
• Establish Whitby Harbour Pilot Board with requisite skills– Promoting the Board opportunity to possible Board members
– High Quality applicants
• Consider Partnership with Private Sector Provider– Tender opportunity
![Page 40: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/40.jpg)
Future Challenge for major ports
• Changing Industry Requirements
![Page 41: The Offshore Wind Farm Opportunity - Borough of …democracy.scarborough.gov.uk/documents/s17796/10376Promotion of t… · The Offshore Wind Farm Opportunity ... 3.6 107 5 to 13 100](https://reader031.vdocuments.site/reader031/viewer/2022030416/5aa1c3857f8b9a84398c235c/html5/thumbnails/41.jpg)
Changing Industry requirements:
• Project logistics are changing…
• Likely development of ‘Super Logistics’
ports that are used to:
– feed many projects in a region
– Reduce need for project specific local ports
• Local ports only used for shelter and
resupply