Thailand Experience and Current Projects
Project Sites Start Completed Remark
DTAC 2G Swap 800 Sep‐2011 Completed Installation & Commissioning
TOT 3G 200 July‐2011 Completed Installation & Commissioning
Manpower BSC testers n/a n/a On‐Going Man‐month
DTAC 3G 5000 Oct‐2011 On‐Going Installation & Commissioning
AIS 3G 2,000 Oct‐2011 On‐Going Installation & Commissioning
True 3G 2,000 Jun‐2013 On‐Going Cabinet pre‐assemble
VAS Services 2,000 Dec‐2011 On‐Going Cleaning, Logistics
• Turn key distribution and logistic, inventory management as well as allocation of equipment and materials to contractors per BOM • Added value services like cutting bulk materials to individual specifications, labeling, packing, transport of new or dismantled equipment
Following recent frequency allocation we now have 16 contracts signed with all 3 mobile operators as well as Ericsson and Nokia
![Page 3: Telecom Network Services & Hybrid Energy Solutions](https://reader038.vdocuments.site/reader038/viewer/2022102917/58efb6541a28abb6618b45f9/html5/thumbnails/3.jpg)
Managed Hybrid Energy Solutions for BTS
![Page 4: Telecom Network Services & Hybrid Energy Solutions](https://reader038.vdocuments.site/reader038/viewer/2022102917/58efb6541a28abb6618b45f9/html5/thumbnails/4.jpg)
Monitoring and Control
![Page 5: Telecom Network Services & Hybrid Energy Solutions](https://reader038.vdocuments.site/reader038/viewer/2022102917/58efb6541a28abb6618b45f9/html5/thumbnails/5.jpg)
Hybrid System Concepts
Use as much as PV as possible which depending on following:
1. Depend on space available for the system
1. Investment cost
2. Minimize energy cost $/kWh
3. Capital investment to reduce operating expense
4. Low fuel consumption of Diesel Generator
5. Minimize fuel top up costs
6. Remote monitoring & record of system data
7. Real time monitoring, data logging & system fail alarm
8. Reduced time to market for operators
![Page 6: Telecom Network Services & Hybrid Energy Solutions](https://reader038.vdocuments.site/reader038/viewer/2022102917/58efb6541a28abb6618b45f9/html5/thumbnails/6.jpg)
Remote Monitoring System
The Remote Monitoring System provides centralized real time graphical display of local, regional or global network as well as individual system parameters for all and each site every 1 minute (configurable) typical parameters are shown below:
Display real time information of following: Voltage, Current, Freq, Power per phase of DG Voltage, Current, Power of Inverter Charge Current per phase of Rectifier Voltage, Current, of battery Voltage, Current, of PV power Voltage, Current , Power per phase of Load Voltage, Current , Power per phase of AC Main (if any) Battery level Fuel level Water Temperature Oil pressure Date & Time
![Page 7: Telecom Network Services & Hybrid Energy Solutions](https://reader038.vdocuments.site/reader038/viewer/2022102917/58efb6541a28abb6618b45f9/html5/thumbnails/7.jpg)
Wind Turbines
![Page 8: Telecom Network Services & Hybrid Energy Solutions](https://reader038.vdocuments.site/reader038/viewer/2022102917/58efb6541a28abb6618b45f9/html5/thumbnails/8.jpg)
Remote SMS/Email System Alarms/Events
The remote SMS system can also send alarm via SMS or Email for each component: Group A : check and report operation of whole system
Fuel level Status Example
1. Low Fuel level The Remote system will automatically send out reminder SMS “Warning!! Should fill fuel” when engine fuel level in the range 10-30% as setting.
2. Medium fuel level The Remote system will automatically send out reminder SMS “Warning!! Should prepare fuel to site” when engine fuel level in the range 50-60% as setting.
3. High fuel level The Remote system will automatically send out reminder SMS “Full level of fuel” when engine fuel level in the range 85-90% as setting.
![Page 9: Telecom Network Services & Hybrid Energy Solutions](https://reader038.vdocuments.site/reader038/viewer/2022102917/58efb6541a28abb6618b45f9/html5/thumbnails/9.jpg)
Network Operations & Monitoring Center
![Page 10: Telecom Network Services & Hybrid Energy Solutions](https://reader038.vdocuments.site/reader038/viewer/2022102917/58efb6541a28abb6618b45f9/html5/thumbnails/10.jpg)
Network Operations & Monitoring Center
![Page 11: Telecom Network Services & Hybrid Energy Solutions](https://reader038.vdocuments.site/reader038/viewer/2022102917/58efb6541a28abb6618b45f9/html5/thumbnails/11.jpg)
• Behind Government office
4Km from 344 Road
14Km to 311 RoadWith 2 lens street
Network Operations & Monitoring Center
![Page 12: Telecom Network Services & Hybrid Energy Solutions](https://reader038.vdocuments.site/reader038/viewer/2022102917/58efb6541a28abb6618b45f9/html5/thumbnails/12.jpg)
• Behind Government office
4Km from 344 Road
14Km to 311 RoadWith 2 lens street
Network Operations & Monitoring Center
![Page 13: Telecom Network Services & Hybrid Energy Solutions](https://reader038.vdocuments.site/reader038/viewer/2022102917/58efb6541a28abb6618b45f9/html5/thumbnails/13.jpg)
• Behind Government office
4Km from 344 Road
14Km to 311 RoadWith 2 lens street
Network Operations and Monitoring Center
![Page 14: Telecom Network Services & Hybrid Energy Solutions](https://reader038.vdocuments.site/reader038/viewer/2022102917/58efb6541a28abb6618b45f9/html5/thumbnails/14.jpg)
• Behind Government office
4Km from 344 Road
14Km to 311 RoadWith 2 lens street