This project will connect the Hamilton Road and I-270 interchange withGahannas industrial and commerce area. With the followingbenefits:
Relieve congestion of the 40,000 daily car count at the Morrison andHamilton Intersection by diverting traffic.
This will be a positive impact to 295 Businesses and 5,053 Employees.
Provide better and shorter access to I-270 and the airport.
Provide access to prime locations for commercial and officedevelopment.
- 120 Acres in Central Park of Gahanna and 78 Acres of vacant land
within I-270 Loop Provide a link in the city-wide bike trail across I-270.
Improved Drive Sequence.
Developments will be visible 130,000 vehicles daily along I-270.
This project will provide access to nearly 200f i l d f d l t
-
8/7/2019 Tech Center Drive Fact Sheet
2/6
History of the Project
May of 1998The City investigated alternatives for better connectivity to the industrial area.
April of 2000The City held a public involvement meeting regarding congestion at Morrison and Hamiltonintersection.
June of 2000Engineering began for Tech Center Drive.
October 2000
The City applied for a Grant for construction of Tech Center Drive which was not granted.
September of 2001ODOT the City conducted an interchange modification study which identified that the I-270ramps would need to be upgraded for Tech Center Drive.
April of 2004The City had an unsuccessful attempt at obtaining TRAC funding
2006 and 2007Morrison road was improved to accept the future Tech Center Drive on the east side. This wasfunded entirely with local funds.
2007Gahanna was awarded Federal funds for the I-270 ramp modifications.
2010
The I-270 ramp modifications were constructed.
Project Funding
The total project construction cost is $6,997,560
-
8/7/2019 Tech Center Drive Fact Sheet
3/6
200 South Hamilton Road, Gahanna, Ohio 43230
(614) 342-4005 www.gahanna.gov
0
Tech
36 .034 Ac res (Pa rk land Dona t ion )
Fu tu re 12 .138 Ac re Parcel
19 .808 Ac r
(C i t y o f Gahanna -
Fu tu re 24 .680 Ac re Parcel Fu tu re 41 .365 Ac re Parcel
I-270
Ham
iltonR
d.
-
8/7/2019 Tech Center Drive Fact Sheet
4/6
Bridge Over I-270 Location & Design
-
8/7/2019 Tech Center Drive Fact Sheet
5/6
RoadwayImprovementsStatus
BridgeoverI270R.O.W.AcquisitionCompleted
FundingInPlace
DesignInProgress
Construction2011
TechcenterPhase2R.O.W.Controlled
PreliminaryDesignComplete
FutureConstruction
I270/HamiltonRoad
Completion2011
ec cen er aseR.O.W.AcquisitionCompleted
FundingInPlace
Design
In
ProgressConstruction2011
TechcenterPhase4R.O.W.Controlled
PreliminaryDesignComplete
FutureConstruction
-