Machine Profile LogSustainable construction
This module is a follow-on from the Solid Timber Buildings module It is understood that the reader already has an awareness of the benefits of Solid Timber Construction
Machine Profile Log (MPL) Buildings
This module is a follow on from the Solid Timber Buildings module It is understood that the reader already has an awareness of the benefits of Solid Timber Construction
We will introduce the specification of MPL buildings and help specifiers to learn more about the design benefits and any potential limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
This module is a follow-on from the Solid Timber Buildings module It is understood that the reader already has an awareness of the benefits of Solid Timber Construction
Machine Profile Log (MPL) Buildings
This module is a follow on from the Solid Timber Buildings module It is understood that the reader already has an awareness of the benefits of Solid Timber Construction
We will introduce the specification of MPL buildings and help specifiers to learn more about the design benefits and any potential limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
This module is a follow on from the Solid Timber Buildings module It is understood that the reader already has an awareness of the benefits of Solid Timber Construction
We will introduce the specification of MPL buildings and help specifiers to learn more about the design benefits and any potential limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
We will look at the following areas Sustainability
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
We will look at the following areas Sustainability Specification
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
We will look at the following areas Sustainability Specification U Values
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
We will look at the following areas Sustainability Specification U Values Air Tightness
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations
Machine Profile Log (MPL) Buildings
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
We will look at the following areas Sustainability Specification U Values Air Tightness Fire Resistance Site Waste Construction time Difficult Access Limitations Benefits
Machine Profile Log (MPL) Buildings
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Everything about an MPL building is geared towards sustainability including
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance
Sustainability
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Everything about a MPL building is geared towards sustainability including
Sustainability ndash Materials Sustainability ndash low CO₂ cost Sustainability ndash Life of Building Sustainability ndash designed for deconstruction Breeam Compliance Carbon Positive Buildings
Sustainability
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
High percentage of materials used are timber
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Sustainability - Materials
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
High percentage of materials used are timber
Timbers can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc)
Sustainability - Materials
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
High percentage of materials used are timber
Timbers and timber based components can be provided with FSCPEFC Chain of custody
Off site manufactureprecision engineering reduces waste and site CO₂
Waste timber is well managed both in manufacture and on site
No Wet Trades (plaster cement etc) A fully recyclable building envelope
Sustainability - Materials
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
No need to use plaster or render in an MPL building
True or False
Question
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Are you Sure
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
Try again
False
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
MPL buildings have a natural timber finish on both the internal and external walls Meaning no wet trades including plastering rendering painting are required This saves time as there is no need to wait for curing drying It also has a posive impact on Health and Safety particularly in the context of COSHH
True
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Embodied CO₂ within main construction material ndash timber
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Fewer deliveries as a result of off site manufacture
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emmissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled
Sustainability ndash Low CO₂
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Embodied CO₂ within main construction material ndash timber
Off site manufacture with rapid on site construction means far fewer transport loads per msup2 of building when compared to traditional modular
Very Low use of site machinery ndash reducing emissions
Low site waste ndash fewer deliveriescollections High percentage of waste recycled Potential to use local trades to further reduce CO₂
from workersrsquo transport
Sustainability ndash Low CO₂
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Low Maintenance
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable)
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Low Maintenance Siberian Larch cladding is a low maintenance
timber with long lifespan No treatment required High quality internal timber finish also reducing
need for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems
(variable) Quality Windows and Doors
Sustainability ndash Life of Building
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Low Maintenance Siberian Larch cladding is a low maintenance timber
with long lifespan No treatment required High quality internal timber finish also reducing need
for ongoing decoration Energy Efficiency through
High insulation and low U values Low Air pressure test results Low Energy Heating and Lighting systems (variable) Quality Windows and Doors
Potential for Carbon NeutralPositive when specified with a Solar Array
Sustainability ndash Life of Building
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope
Sustainability - Deconstruction
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Increasingly Specifiers have to consider the impact of the building at the end of its useful life MPL Construction can offer these advantages
Long lifespan of 80 years plus Fully recyclable building envelope Natural materials ndash low embodied energy
Sustainability - Deconstruction
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Do MPL Timber buildings have a long lifespan of over 80 years
True or False
Question
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Are you Sure
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
Try again
False
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Timber Buildings have a long lifespan ndash the external cladding alone (Siberian Larch or Western Red Cedar) can last in excess of 60 ndash 80 years The main structure considerably longer
True
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
The buildings have been designed to meetor exceed Breeam standards and are rated ldquovery goodrdquo even before local conditions are considered
Breeam ldquoExcellentrdquo or even ldquoCarbon Positiverdquo status is readily achievable with the addition of a solar array or other renewable energy source
Breeam
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
Carbon Positive
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Weatherworks Energy consultants were commissioned by Cabinco to assess efficiency of our buildings and have reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array
This is based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Carbon Positive
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
An MPL building can achieve Carbon PositiveNeutral energy consumption based on air pressure test results of 3msup3hr at 50Pa
True or False
Question
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Are you Sure
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
Try again
False
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Weatherworks (Energy consultant) were commissioned by Cabinco to assess efficiency of our MPL buildings they reported that our standard specification can achieve Carbon Neutral or even Carbon Positive with the addition of a solar array based on air tightness of 3msup3hr at 50Pa or below and our existing excellent U values
True
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Specification - Wall
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Machine profile Log buildings all have a structural shell constructed from solid log walling This log can vary in thickness ndash but usually 75mm as a minimum
These logs form the Internal log walls which are protected from the elements by the sacrificial external cladding increasing longevity
The wall log is laminated to reduce shakes and splits and improve performance and appearance
Wall log will normally have triple TampG to both improve air tightness and stability of the wall
Logs interlock to create the structural shell
Specification - Wall
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
All timber cladding requires regular treatment to preserve it from the elements
True or False
Question
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Are you sure
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
Try Again
True
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Some types of timber such as Siberian Larch and Western Red Cedar are naturally weather resistant They cope with the elements without decay for 60 ndash 80 years and gradually turn an attractive silver grey These are most commonly used on MPL Buildings
False
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Typical wall log
Specification
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
Specification ndash Wall
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
The 75mm wall log which creates the structural shell is also the finished inner wall Log thickness can be increased if required
Insulation breather and cladding is added to the exterior to create the finished wall section
This enables services to be hidden in the cavity
Specification ndash Wall
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
External Cladding can be provided in a variety of different finishes
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
Specification - Wall
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
External Cladding can be provided in a variety of different finishes
However most clients are looking for sustainability and therefore select Timber Cladding in either Western Red Cedar or Siberian Larch in 22mm
These cladding types do not require preservative treatment and will weather naturally to an attractive silver grey colour and last 60 ndash 80 years plus
As an external cladding it can replaced without internal disruption This also affords ready access to services without disturbing the occupants
Specification - Wall
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
Specification Roof
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
The roof structure can be designed and constructed to accept a variety of final finishes including SedumWildflower slate or Metrotile
The MPL system allows great flexibility throughout including the roof
Specification Roof
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Split Roof Design allowing natural light into the central corridor of this classroom block
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Roof Specification - monopitch
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Sedum Roof at Deanfields Study Centre
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Specification Foundations
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
We can build from a variety of foundations including strip block pillars insulated slab CFA piles screw piles dependant on ground conditions budgets and timescales etc
Foundations most often padpile type are designed at the same time as the building specifying number and position of all load points
Specification Foundations
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Screw Piles offer less site disruption better sustainability value (removable and recyclable) precision and speed
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Pillar foundations can be more cost ndash effective Image shows them complete and ready for baseframe
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Typical Floor Specification
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Superior Scandinavian designed double glazed units
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass
WindowsDoors
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Superior Scandinavian designed double glazed units
Manufacturerrsquos 5 year guarantee External windows and doors glazed Argon
filled low E glass All doors use toughenedlaminated glass Arrive on site as factory finished fully
glazed pre-hung sets ready to install
WindowsDoors
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Windows and Doors in a light Oak coloured finish
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Architect specified matching RAL to fascia rainwater goods and windows and doors
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
This build system provides high levels of thermal efficiency and will provide the following U Values
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
U Values - Wall
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
This build system provides high levels of thermal efficiency and will provide the following U Values
125mm Kingspan insulation U Value 016 Wall thickness 265mm
150mm Kingspan insulation U Value 014 Wall thickness 290mm
There is flexibility in the system to change insulation thickness and type where appropriate
U Values - Wall
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
MPL buildings substantially improve on Building Regulations U values for all elements of the building Typical U Values for a wall is 016 with 125mm solid board insulation
True or False
Question
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Are you sure
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
Try again
False
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
With a combination of 75mm wall log 125mm solid board insulation and 22mm external timber cladding an MPL building will achieve U Values for a wall of 016
A substantial improvement on the Building Regulations Requirements
True
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Fire Resistance
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Timber has a slow charring rate of between 15 ndash 25mm per half hour (depending on species) therefore structural integrity remains stable for longer and is more predictable
Masonry or steel conduct heat more readily resulting in crackingspalling or twisting which can quickly undermine the safety of the entire structure
Fire Resistance
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Both external cladding and internal walling can be further protected
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Fire Retardant
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Both external cladding and internal walling can be further protected from surface spread of flame
External cladding is treated off-site with a pressure impregnation system to achieve frac12 hour or 1 hour retardation
Internal walls can be sprayed during the construction process typically Nullifire and be certified for Class O resistance
Fire Retardant
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer and is more predictable in a fire
True or False
Question
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Are You SureTimber has a slow charring rate of 15 ndash 25mm
per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that steelmasonry and is more predictable in a fire
Try again
False
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Correct - Timber has a slow charring rate of 15 ndash 25mm per half hour (depending on species) therefore on solid timber builds such as MPL structural integrity remains stable for longer that masonrysteel and is more predictable in a fire
True
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
Air Tightness
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
MPL buildings have been recorded with air tightness as low as 324msup3hr at 50Pa and can achieve lower
This is a substantial improvement on building Regulations requirement of 10msup3hr at 50Pa
Air Tightness
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Industry standard for site waste is 0021 tonnes per square meter of build
Site Waste
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Industry standard for site waste is 0021 tonnes per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build and current projects are anticipating 00002 tonnes per square metre of build
Site Waste
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Industry standard for site waste is 0021 ton per square meter of build
Cabinco have brought this down to 00033 tonnes of waste to landfill per square meter of build
We are working towards reducing this further as we develop our SWMPs and current projects are anticipating only 00002 tonnes to landfill per square metre of build
Site Waste
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times
Construction Time
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
MPL is a method of off-site construction which is fixed together on-site This makes building times more rapid
Removal of wet trades further reduces weather delays and improves construction times further
Eg 120msup2 building completed in just 23 days (complete structural shell)
734msup2 building completed (including all foundations) in just 20 weeks
Construction Time
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Construction ProcessHeavy duty baseframe over pile foundation insulated ready to create working floor
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Construction ProcessMPL structural shell takes shape with all internal and external walls built at the same time
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Construction ProcessMPL is at eaves height so roof timbers are
brought into place Some buildings require crane assistance others can be installed manually
MPL is at eaves height so roof timbers are brought into place Some buildings require crane
assistance others can be installed manually
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Construction ProcessRoof Make-up in progress breather batten and now insulation
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Construction ProcessRoof tiling commences insulation to the exterior of the walls underway
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Construction ProcessFactory finished windows amp doors positioned Fire treated larch cladding is cut and fixed to exterior
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Construction ProcessScaffold down and window trims in place
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Construction ProcessInternal second fix underway visible structural beams and large roof lights
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
CompleteComplete
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
CompleteComplete
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
CompleteComplete
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
CompleteComplete
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Sites with Restricted Access
Pre-fabricated panels or logs can be transported to site on a tele-handler or side loader (depending on size)
Machine profile logs and smaller panels can even be manually carried where access is particularly difficult
Sites with Restricted Access
With a little trackway and a sideloader ndash this narrow access was suitable for an MPL project
MPL Buildings are ideal for locations with difficult or restricted access
True or False
Question
Are you sureMPL buildings arrive to site in packs which
can be moved by a telehandler or sideloader making them ideal in areas where narrow access exists In really restricted areas the packs can be broken down and logs carried manually
Try again
False
Correct - MPL buildings arrive to site in packs which can be moved by a telehandler or sideloader making them ideal in areas where narrow access exists In really restricted areas the packs can be broken down and logs carried manually
True
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Limitations
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Use of sliding brackets on all fixings
Limitations
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Use of sliding brackets on all fixings Lamination of wall logs to reduce
splittingshaking
Limitations
To allow for shrinkage in an MPL building all fixings are made using sliding brackets to allow the wall to settle without disruption
True or False
Question
Are you sure
Try again
False
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Correct -
True
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Rapid Construction
Benefits
Rapid Construction Long lifespan
Benefits
Rapid Construction Long lifespan Sustainable materials
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Are you sureMPL buildings arrive to site in packs which
can be moved by a telehandler or sideloader making them ideal in areas where narrow access exists In really restricted areas the packs can be broken down and logs carried manually
Try again
False
Correct - MPL buildings arrive to site in packs which can be moved by a telehandler or sideloader making them ideal in areas where narrow access exists In really restricted areas the packs can be broken down and logs carried manually
True
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Limitations
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Use of sliding brackets on all fixings
Limitations
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Use of sliding brackets on all fixings Lamination of wall logs to reduce
splittingshaking
Limitations
To allow for shrinkage in an MPL building all fixings are made using sliding brackets to allow the wall to settle without disruption
True or False
Question
Are you sure
Try again
False
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Correct -
True
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Rapid Construction
Benefits
Rapid Construction Long lifespan
Benefits
Rapid Construction Long lifespan Sustainable materials
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Correct - MPL buildings arrive to site in packs which can be moved by a telehandler or sideloader making them ideal in areas where narrow access exists In really restricted areas the packs can be broken down and logs carried manually
True
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Limitations
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Use of sliding brackets on all fixings
Limitations
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Use of sliding brackets on all fixings Lamination of wall logs to reduce
splittingshaking
Limitations
To allow for shrinkage in an MPL building all fixings are made using sliding brackets to allow the wall to settle without disruption
True or False
Question
Are you sure
Try again
False
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Correct -
True
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Rapid Construction
Benefits
Rapid Construction Long lifespan
Benefits
Rapid Construction Long lifespan Sustainable materials
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Limitations
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Use of sliding brackets on all fixings
Limitations
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Use of sliding brackets on all fixings Lamination of wall logs to reduce
splittingshaking
Limitations
To allow for shrinkage in an MPL building all fixings are made using sliding brackets to allow the wall to settle without disruption
True or False
Question
Are you sure
Try again
False
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Correct -
True
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Rapid Construction
Benefits
Rapid Construction Long lifespan
Benefits
Rapid Construction Long lifespan Sustainable materials
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Use of sliding brackets on all fixings
Limitations
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Use of sliding brackets on all fixings Lamination of wall logs to reduce
splittingshaking
Limitations
To allow for shrinkage in an MPL building all fixings are made using sliding brackets to allow the wall to settle without disruption
True or False
Question
Are you sure
Try again
False
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Correct -
True
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Rapid Construction
Benefits
Rapid Construction Long lifespan
Benefits
Rapid Construction Long lifespan Sustainable materials
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Shrinkage occurs in all MPL buildings depending on the wall thickness and building height but it is typically 60mm for a single storey building Cad Techniques are used to model shrinkage at design stage and develop compensating features such as
Use of sliding brackets on all fixings Lamination of wall logs to reduce
splittingshaking
Limitations
To allow for shrinkage in an MPL building all fixings are made using sliding brackets to allow the wall to settle without disruption
True or False
Question
Are you sure
Try again
False
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Correct -
True
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Rapid Construction
Benefits
Rapid Construction Long lifespan
Benefits
Rapid Construction Long lifespan Sustainable materials
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
To allow for shrinkage in an MPL building all fixings are made using sliding brackets to allow the wall to settle without disruption
True or False
Question
Are you sure
Try again
False
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Correct -
True
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Rapid Construction
Benefits
Rapid Construction Long lifespan
Benefits
Rapid Construction Long lifespan Sustainable materials
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Are you sure
Try again
False
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Correct -
True
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Rapid Construction
Benefits
Rapid Construction Long lifespan
Benefits
Rapid Construction Long lifespan Sustainable materials
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Correct -
True
These sliding brackets allow for the movement and settlement of the timbers without disrupting the fixings
Rapid Construction
Benefits
Rapid Construction Long lifespan
Benefits
Rapid Construction Long lifespan Sustainable materials
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Rapid Construction
Benefits
Rapid Construction Long lifespan
Benefits
Rapid Construction Long lifespan Sustainable materials
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Rapid Construction Long lifespan
Benefits
Rapid Construction Long lifespan Sustainable materials
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Rapid Construction Long lifespan Sustainable materials
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Rapid Construction Long lifespan Sustainable materials Embodied Carbon
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design
Benefits
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Rapid Construction Long lifespan Sustainable materials Embodied Carbon Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration
Benefits
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Rapid Construction Long lifespan Sustainable materials Clean quiet safe sites Suitability for difficult access Individual design High levels of carbon sequestration Low waste
Benefits
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
The principal construction material in an MPL building is both natural renewable and recyclable making it ideal for sustainable construction
True or False
Question
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Are you sure
The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
Try again
False
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Correct - The principal construction material is timber which is natural and renewable This can be verified through PEFCFSC Chain of Custody certification It is also fully recyclable with most waste timber on an MPL site classified ldquoGrade A ndash Reuserdquo
True
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Thank you for completing this presentation Your certificate of completion is available by emailing romanecabincocouk with your name and the date of completion
Certificate
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Further and supporting information to the MPL Build system as provided by Cabinco can be found on the Cabinco website httpcabincocoukresourcessustainable-construction and the companies Technical Library which is on httpcabincocoukresourcestechnical-library
Additional information including copies of the Weatherworks report past energy performance certificates and air pressure test results can be obtained direct from Cabinco Contact Romanecabincocouk or ring on 01600 719218
If you would like to arrange a formal presentation by one of the Directors of Cabinco to develop product knowledge among your team (also CPD accredited) please contact Cabinco on 01600 719218 or romanecabincocouk
Thank you for completing this CPD module
Further Information
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-
Machine Profile LogSustainable construction
- Machine Profile Log
- Slide 2
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings
- Machine Profile Log (MPL) Buildings (2)
- Machine Profile Log (MPL) Buildings (3)
- Machine Profile Log (MPL) Buildings (4)
- Machine Profile Log (MPL) Buildings (5)
- Machine Profile Log (MPL) Buildings (6)
- Machine Profile Log (MPL) Buildings (7)
- Machine Profile Log (MPL) Buildings (8)
- Machine Profile Log (MPL) Buildings (9)
- Machine Profile Log (MPL) Buildings (10)
- Sustainability
- Sustainability (2)
- Sustainability (3)
- Sustainability (4)
- Sustainability (5)
- Sustainability (6)
- Sustainability (7)
- Sustainability - Materials
- Sustainability - Materials (2)
- Sustainability - Materials (3)
- Sustainability - Materials (4)
- Sustainability - Materials (5)
- Sustainability - Materials (6)
- Question
- False
- True
- Sustainability ndash Low CO₂
- Sustainability ndash Low CO₂ (2)
- Sustainability ndash Low CO₂ (3)
- Sustainability ndash Low CO₂ (4)
- Sustainability ndash Low CO₂ (5)
- Sustainability ndash Low CO₂ (6)
- Sustainability ndash Low CO₂ (7)
- Sustainability ndash Life of Building
- Sustainability ndash Life of Building (2)
- Sustainability ndash Life of Building (3)
- Sustainability ndash Life of Building (4)
- Sustainability ndash Life of Building (5)
- Sustainability ndash Life of Building (6)
- Sustainability ndash Life of Building (7)
- Sustainability ndash Life of Building (8)
- Sustainability ndash Life of Building (9)
- Sustainability - Deconstruction
- Sustainability - Deconstruction (2)
- Sustainability - Deconstruction (3)
- Sustainability - Deconstruction (4)
- Question (2)
- False (2)
- True (2)
- Breeam
- Breeam (2)
- Carbon Positive
- Carbon Positive (2)
- Question (3)
- False (3)
- True (3)
- Specification - Wall
- Specification - Wall (2)
- Specification - Wall (3)
- Specification - Wall (4)
- Specification - Wall (5)
- Question (4)
- True (4)
- False (4)
- Specification
- Specification ndash Wall
- Specification ndash Wall (2)
- Specification ndash Wall (3)
- Slide 73
- Specification - Wall (6)
- Specification - Wall (7)
- Specification - Wall (8)
- Specification - Wall (9)
- Specification Roof
- Specification Roof (2)
- Slide 80
- Roof Specification - monopitch
- Sedum Roof at Deanfields Study Centre
- Specification Foundations
- Specification Foundations (2)
- Screw Piles offer less site disruption better sustainability v
- Pillar foundations can be more cost ndash effective Image shows t
- Typical Floor Specification
- WindowsDoors
- WindowsDoors (2)
- WindowsDoors (3)
- WindowsDoors (4)
- WindowsDoors (5)
- Windows and Doors in a light Oak coloured finish
- Architect specified matching RAL to fascia rainwater goods and
- U Values - Wall
- U Values - Wall (2)
- U Values - Wall (3)
- U Values - Wall (4)
- U Values - Wall (5)
- U Values - Wall (6)
- Question (5)
- False (5)
- True (5)
- Fire Resistance
- Fire Resistance (2)
- Fire Retardant
- Fire Retardant (2)
- Fire Retardant (3)
- Question (6)
- False (6)
- True (6)
- Air Tightness
- Air Tightness (2)
- Site Waste
- Site Waste (2)
- Site Waste (3)
- Construction Time
- Construction Time (2)
- Construction Time (3)
- Construction Process
- Construction Process (2)
- Construction Process (3)
- Construction Process (4)
- Construction Process (5)
- Construction Process (6)
- Construction Process (7)
- Construction Process (8)
- Complete
- Complete (2)
- Complete (3)
- Complete (4)
- Sites with Restricted Access
- Sites with Restricted Access (2)
- Slide 134
- Question (7)
- False (7)
- True (7)
- Limitations
- Limitations (2)
- Limitations (3)
- Question (8)
- False (8)
- True (8)
- Benefits
- Benefits (2)
- Benefits (3)
- Benefits (4)
- Benefits (5)
- Benefits (6)
- Benefits (7)
- Benefits (8)
- Benefits (9)
- Question (9)
- False (9)
- True (9)
- Certificate
- Further Information
- Machine Profile Log (2)
-